The Relationship of Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance
Authors: P. F. Wong, H. Salleh, F. A. Rahim
Abstract:
The adoption of building information modeling (BIM) is increasing in the construction industry. However, quantity surveyors are slow in adoption compared to other professions due to lack of awareness of the BIM’s potential in their profession. It is still unclear on how BIM application can enhance quantity surveyors’ work performance and project performance. The aim of this research is to identify the capabilities of BIM in quantity surveying practices and examine the relationship between BIM capabilities and project performance. Questionnaire survey and interviews were adopted for data collection. Literature reviews identified there are eleven BIM capabilities in quantity surveying practice. Questionnaire results showed that there are several BIM capabilities significantly correlated with project performance in time, cost and quality aspects and the results were validated through interviews. These findings show that BIM has the capabilities to enhance quantity surveyors’ performances and subsequently improved project performance.
Keywords: Building information modeling (BIM), quantity surveyors, capability, project performance.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1096191
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 7261References:
[1] X. Meng, "The effect of relationship management on project performance in construction,” International journal of project management, vol. 30, no. 2, pp. 188-198, February 2012.
[2] M. Sun, & X. Meng, "Taxonomy for change causes and effects in construction projects,” International Journal of Project Management, vol. 27, no. 6, pp. 560-572, August 2009.
[3] S. O. Cheung, H. C. H. Suen, & K. K. W. Cheung, "PPMS: a web-based construction project performance monitoring system,” Automation in construction, vol. 13, no. 3, pp. 361-376, May 2004.
[4] C. Fortune, "Process standardisation and the impact of professional judgement on the formulation of building project budget price advice,” Construction Management and Economics, vol. 24, no. 10, pp. 1091- 1098, June 2006.
[5] J. J. Hannon, "Estimators’ functional role change with BIM,” AACE International Transactions. pp. 1-8, 2007.
[6] D. Mitchell, 5D BIM: Creating cost certainty and better buildings. 2012 RICS Cobra, Las Vegas, Nevada USA, 2012.
[7] G. Nagalingam, H. S. Jayasena, & K. Ranadewa, "Building Information Modelling and Future Quantity Surveyor's Practice in Sri Lankan Construction Industry,” presented at the Second World Construction Symposium 2013: Socio-Economic Sustainability in Construction, 14-15 June 2013, Colombo, Sri Lanka, 2013.
[8] N. Thurairajah, and D. Goucher, "Advantages and Challenges of Using BIM: a Cost Consultant’s Perspective,” presented at the 49th ASC Annual International Conference Proceedings, California, April 10-12, 2013.
[9] S. Perera, C. Udeaja, L. Zhou, A. Rodrigo, and R. Park, Mapping the Ebusiness profile and trends in cost management in the UK construction industry, 2012, Available: http://innovationinaec2012.pcc.usp.br/PROCEEDINGS/88%20MAPPING%20THE%20EBUSINESS%20PROFILE %20AND%20TRENDS%20IN%20COST%20MANAGEMENT%20IN%20THE%20UK%20CONSTRUCTION%20INDUSTRY.pdf (assessed on 12.3.2012)
[10] T. Ho, Divisional News & Activities. Quantity Surveying Division: Chairman’s Message, 2012, Available: http://www.hkis.org.hk/en/st/ ST2012/201203/2012st03_5f_qsd.pdf. (assessed on 10.2.2012)
[11] Royal Institution of Chartered Surveyors (RICS), Building Information Modeling Survey Report, 2012. Available: http://www.scan2bim.info/ files/rics_2011_BIM_Survey_Report.pdf. (assessed on 14.5.2012).
[12] S. Pittard, BIM concept and impact, 2011, Available: http://www.isurv.com/site/scripts/documents_info.aspx?documentID=61 83&categoryID=390 (assessed on 12.3.2012)
[13] J. Gibson, & M. Hamilton, Analysis of pre-project planning effort and success variables for capital facility projects. Austin, TX: Construction Industry Institute, 1994.
[14] D. Roginski, "Quantity Takeoff process for bidding stage using BIM tools in Danish Construction Industry,” M.S. thesis, Department of Civil Engineering, Technical University of Denmark, Denmark, 2011.
[15] F. K. T. Cheung, J. Rihan, J.Tah, D. Duce, and E, Kurul, "Early stage multi-level cost estimation for schematic BIM models,” Automation in Construction, vol. 27, pp. 67-77, November 2012.
[16] T. L. McCuen, "Scheduling, Estimating, and BIM: a Profitable Combination,” AACE International Transactions, BIM11-19, June 2008.
[17] Exactal Technologies, The 21st Century Estimating Solution for BIM, 2010, Available: http://www.exactal.com/products/costX (assessed on 12.5.2013).
[18] V. Popov, V. Juocevicius, D. Migilinskas, L. Ustinovichius, and S. Mikalauskas, "The use of a virtual building design and construction model for developing an effective project concept in 5D environment,” Automation in Construction, vol. 19, no. 3, pp. 357-367, May 2010.
[19] A. Pennanen, G. Ballard, and Y. Haahtela, "Target costing and designing to targets in construction,” Journal of Financial Management of Property and Construction, vol. 16, no. 1, pp. 52-63, April 2011.
[20] R. Deutsch, BIM and Integrated Design: Strategies for Architectural Practice. John Wiley & Sons, 2011.
[21] Y. F. Chang, and S. G. Shih, "BIM-based Computer-Aided Architectural Design,” Computer-Aided Design & Applications, vol. 10, no. 1, pp. 97- 109, August 2013.
[22] Autodesk White Paper, Realizing the Benefits of BIM, 2011, Available:http://images.autodesk.com/adsk/files/2011realizing_bim_fina l.pdf. (assessed on 3.4.2012)
[23] L. C. Witicovski, S. Scheer, Some improvements for BIM based cost estimation, 2010, Available: http://innovationnaec2012.pcc.usp.br/ PROCEEDINGS/70%20SOME%20IMPROVEMENTS%20FOR%20BI M%20BASED%20COST%20ESTIMATION.pdf (assessed on 12.7.2013)
[24] N. Papadopoulos, ASPE Standard Estimating Practice, 8th Edition, Building Information Modeling section, 2013. Available: http://www.eosgroup.com/product_pdfs/BIM_White_Paper_2.pdf (assessed on 23.5.2013)
[25] J. W. Creswell, Research design: Qualitative, quantitative, and mixed methods approaches (3rd Ed.): SAGE Publications, Incorporated, 2009.
[26] P. D. Leedy, & J. E. Ormrod, Practical research: Planning and design (8th ed.). Upper Saddle River, NJ: Prentice Hall, 2005.