Comparison of Design Procedures for Pre Engineering Buildings (PEB): A Case Study
Authors: G. Sai Kiran , A. Kailasa Rao, R . Pradeep Kumar
Abstract:
In recent years, the introduction of Pre Engineered Building (PEB) concept in the design of structures has helped in optimizing design. The adoptability of PEB in the place of Conventional Steel Building (CSB) design concept resulted in many advantages, including economy and easier fabrication. In this study, an industrial structure (Ware House) is analyzed and designed according to the Indian standards, IS 800-1984, IS 800-2007 and also by referring MBMA-96 and AISC-89. In this study, a structure with length 187m,width 40m,with clear height 8m and having R-Slope 1:10,isconsidered to carry out analysis& design for 2D frames (End frame, frame without crane and frame with 3 module cranes). The economy of the structure is discussed in terms of its weight comparison, between Indian codes (IS800-1984, IS800-2007) & American code (MBMA-96), & between Indian codes (IS800-1984, IS800-2007).
Keywords: AISC, Crane Beam, MBMA, Pre-Engineered-Buildings, Staad Pro, Utilization Ratio.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1337341
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 6885References:
[1] Indian Standard: 1893 (Part1); 2002. Criteria for Earthquake Resistant Design Structures: New Delhi: BIS; 2002.
[2] IS 875: Part 1 to 5 Code Of Practice For Design Loads (Other Than Earthquake) For Buildings and Structures,1st Revision, New Delhi: BIS..
[3] Indian Standard: 801 – 1975; Code Of Practice For Use Of Cold-Formed Light Gauge Steel Structural Member’s In General Building Construction, 1st Revision, New Delhi: BIS.
[4] Indian Standard: 800 – 2007; General Construction in Steel — Code of Practice; 3rd S Revision, New Delhi: BIS.
[5] Indian Standard: 800 – 1984; Code of Practice for General Construction, In Steel; 1st Revision, New Delhi: BIS.
[6] MBMA: Metal Building Manufacturers Association-2006, Metal Building Systems Manual, http://www.mbma.com.
[7] AISC: American Institute of Steel Construction-1989, Manual of Steel Construction, Allowable Stress Design.
[8] Syed Firoz (2012), "Design Concept of Pre-engineered Building”, International Journal of Engineering Research and Applications (IJERA), Vol. 2, Issue 2, 267-272.
[9] C. M. Meera (2013),”Pre-Engineered Building Design of an Industrial Warehouse”, international journal of engineering sciences & emerging technologies, volume 5, issue 2, pp: 75-82.
[10] Indian Standard: 807 – 1976; Code Of Practice For Design, Manufacture, Erection And Testing (Structural Portion) Of Cranes and Hoists, 1st Revision, New Delhi: BIS.
[11] Technical Manual, Zamil Steel, Saudi Arabia, Pre-Engineered Buildings Division.
[12] Technical Hand Book, Kirby Building Systems-INDIA.LTD.