Optimal Preventive Maintenance of the Reserve Source in the Industrial Electric Network
Authors: M. Bouguerra, H. Meglouli, I. Habi
Abstract:
The great majority of the electric installations belong to the first and second category. In order to ensure a high level of reliability of their electric system feeder, two power supply sources are envisaged, one principal, the other of reserve, generally a cold reserve (electric diesel group). The principal source being under operation, its control can be ideal and sure, however for the reserve source being in stop, a preventive maintenance-s which proceeds on time intervals (periodicity) and for well defined lengths of time are envisaged, so that this source will always available in case of the principal source failure. The choice of the periodicity of preventive maintenance of the source of reserve influences directly the reliability of the electric feeder system. On the basis of the semi-markovians processes, the influence of the periodicity of the preventive maintenance of the source of reserve is studied and is given the optimal periodicity.Keywords: Semi Markovians processes, reliability, optimization, electric network.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1073293
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1244References:
[1] Bouguerra M. Analyse des variantes des reseaux electriques des stations de compression de gaz , Viniti, n┬░9 , p109 - 111, moscou - russie, 1987.
[2] Kaufman A. , Grouchy D., Druon R. Modeles mathematiques pour l-étude de la fiabilité des systemes.Masson et Cie, 1975.
[3] Korolok V.S., Tourbine A.F. Processus semi markoviens et leur application, doumka, Kiev, 1976.
[4] Bouguerra M., Benouareth A., "Optimal Rebulding of the Electric Feeder Systems of the Gas Compressors Plants in Algeria", ICEEC-04.Proceeding of the IEEE catalog number : 04EX893C, ISBN : 0-7803-8576 , Cairo, P 849 - 851, 2004.