Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Analyzing and Formulation of Product Lead Time
Authors: B. Fahimnia, L.H.S. Luong, B. Motevallian, R. M. Marian, M. M. Esmaeil
Abstract:
Product Lead Time (PLT) is the period of time from receiving a customer's order to delivering the final product. PLT is an indicator of the manufacturing controllability, efficiency and performance. Due to the explosion in the rate of technological innovations and the rapid changes in the nature of manufacturing processes, manufacturing firms can bring the new products to market quicker only if they can reduce their PLT and speed up the rate at which they can design, plan, control, and manufacture. Although there is a substantial body of research on manufacturing relating to cost and quality issues, there is no much specific research conducted in relation to the formulation of PLT, despite its significance and importance. This paper analyzes and formulates PLT which can be used as a guideline for achieving the shorter PLT. Further more this paper identifies the causes of delay and factors that contributes to the increased product lead-time.Keywords: Manufacturing Control, Manufacturing Lead Time, Manufacturing Planning, Product Design, and Product Lead Time.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1071232
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1769References:
[1] B. Fahimnia, R. Marian, B. Motevallian, M. Mohammad Esmaeil, & K. Abhary, "A heuristic method to optimize manufacturing lead time", to be published in the 17th International DAAAM Symposium, Austria, Vienna, 2006.
[2] B. Motevallian, "Reducing product lead-time in manufacturing", a master of engineering thesis, School of Advanced Manufacturing & Mechanical Engineering, University of South Australia, Australia, pp.1- 140, 1997.
[3] C. Charny, "Time to Market", Society of Manufacturing Engineers, USA, 1997.
[4] M. Groover, "Automation, Production & Computer Integrated manufacturing", Prentice-Hall, USA, 1987.
[5] T. A. Salomone, "What Every Engineer Should Know About Concurrent Engineering", Marcel Dekker Inc., USA, 1995.
[6] W. Smith "Time out", John Wiley & Sons Inc., USA, 1998.