The Current Implementation Status of Manufacturing Control Systems for a Key Manufacturing Industry
Authors: Rajab Abdullah Hokoma
Abstract:
Manufacturing, production and service industries within Libya have struggled with many problems during the past two decades due to many difficulties. These problems have created a negative impact on the productivity and utilization of many industries around the country. This paper studies the implementation levels of the manufacturing control systems known as Manufacturing Resource Planning (MRPII) being adapted within some Libyan industries. A survey methodology has been applied for this research, based on the survey analysis, the results pointed out that the system within these industries has a modest strategy towards most of the areas that are considered as being very crucial in implementing these systems successfully. The findings also show a variation within these implementation levels with a respect to the key-elements that related to MRPII, giving the highest levels in the emphasise on financial data accuracy. The paper has also identified limitations within the investigated manufacturing and managerial areas and has pointed to where senior managers should take immediate actions in order to achieve effective implementation of MRPII within their business area.
Keywords: Control, Industry, Manufacturing, Survey, System
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1070179
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1753References:
[1] World Report International, England, What is the historical background of the Libyan Cement Company, (Online), available from: www.worldreport-ind.com/libya.,2004.
[2] Hokoma Rajab, Mohammed K. Khan & Khalid Hussain (2007), Investigation of the Senior Management Strategy Towards Implementing Manufacturing, Planning and Control Techniques/Philosophies Within the Libya Cement Industry: A Case Study, Proceeding of the 23rd ISPE International Conference on CAD/CAM, Robotics and Factories of the Future, Bogotá, Colombia.
[3] Hokoma Rajab, Mohammed Khan & Khalid Hussain (2008), "An Investigation of Total Quality Management Implementation Status for the Oil & Gas Industry within Libya ", MEQA, 2nd Annual Congress, Dubai, UAE.
[4] Hokoma Rajab, Khan K., Hussain K., & Bindra S., (2006), Strategic Impact of JIT Technique For Reducing The Storage & Eliminating The Waste Within Petroleum Industry, Proceeding of the Ninth Mediterranean Petroleum Conference and Exhibition, Tripoli, Libya.
[5] Hokoma Rajab, Khan K., Hussain K., (2006), "The Current Status of MRPII Implementation in Some Key Manufacturing Industries Within Libya: A Survey Investigation ", Proceeding of the 22nd International Conference on CAD/CAM, Robotics and Factories of the Future, India.
[6] Hokoma Rajab, Mohammed Khan & Khalid Hussain (2010), "The present status of quality and manufacturing management techniques and philosophies within the Libyan iron and steel industry" The TQM Journal, Volume 22, No. 2. pp. 209-221.
[7] Hokoma Rajab, Ibrahim Aburawey & Hala Amaigl, (2010), "Investigating The Implementation Status of Manufacturing Systems for the Libyan Cement Industry: A Case Study.", International Conference on Intelligent Control Systems Engineering, ICICSE 2010, Penang, Malaysia.
[8] Hokoma Rajab, Mohammed Khan & Khalid Hussain (2008), "Investigation into the Various Implementation Stages of Manufacturing and Quality Techniques/Philosophies Within the Libyan Cement Industry" Journal of Manufacturing Technology Management, Volume 19, No. 7. pp. 893-906.
[9] Abdulssalam Rifai, Rajab Hokoma, Mansor Esbiga, & Hala Omer (2006), The Strategy Applied Towards Implementing JIT and MRPII Planning and Control Techniques within Libyan Construction and Cement Industries, (ICTM), Kuala Lumpur, Malaysia.
[10] Hokoma Rajab, Mohammed Khan & Khalid Hussain (2008), The Present Implementation Status of Manufacturing Resource Planning (MRPII) System Within The Libyan Textile, Plastic & Wood Industries: A Case Study, Proceeding of the 24th ISPE International Conference on CAD/CAM, Robotics and Factories of the Future, Tokyo, Japan.
[11] Hokoma Rajab, Tughar M., Rifai A., Edaayf R. & Bindra S., (2007), Strategic Impact of JIT Technique for Construction Industry, Proceeding of the Second International Engineering Conference on Construction and development, Gaza, Palestine.
[12] Hokoma Rajab, Mohammed K. Khan, & Khalid Hussain (2006), "The Current Status of MRPII Implementation in Some Key Manufacturing Industries within Libya: A Survey Investigation,", Proceedings of the 22nd International Conference, Narosa Publishing House, New Delhi, India.
[13] Hokoma Rajab, (2010), An Investigation of Total Quality Management Implementation Status For The Libyan Cement Industry: A Case Study,MEQA,4th Annual Congress, Dubai, UAE.
[14] Pallaant J., (2005), SPSS Survival Manual, Second Edition, McGraw- Hill Education, Open University Press, UK.
[15] Hokoma Rajab & El-Buzadi Ali, (2009), An Investigation of TQM implementation status within the Libyan Electronic Industry, Quality Conference-2009, Tripoli, Libya.