Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Just-In-Time for Reducing Inventory Costs throughout a Supply Chain: A Case Study
Authors: Faraj Farhat El Dabee, Rajab Abdullah Hokoma
Abstract:
Supply Chain Management (SCM) is the integration between manufacturer, transporter and customer in order to form one seamless chain that allows smooth flow of raw materials, information and products throughout the entire network that help in minimizing all related efforts and costs. The main objective of this paper is to develop a model that can accept a specified number of spare-parts within the supply chain, simulating its inventory operations throughout all stages in order to minimize the inventory holding costs, base-stock, safety-stock, and to find the optimum quantity of inventory levels, thereby suggesting a way forward to adapt some factors of Just-In-Time to minimizing the inventory costs throughout the entire supply chain. The model has been developed using Micro- Soft Excel & Visual Basic in order to study inventory allocations in any network of the supply chain. The application and reproducibility of this model were tested by comparing the actual system that was implemented in the case study with the results of the developed model. The findings showed that the total inventory costs of the developed model are about 50% less than the actual costs of the inventory items within the case study.Keywords: Holding Costs, Inventory, JIT, Modeling, SCM
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1063034
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3484References:
[1] R. A. Hokoma, M. K. Khan & K. Hussain, "Investigation of the senior management strategy towards implementing manufacturing, planning and control techniques and philosophies within the Libyan cement industry: a case study", Proceeding of the 23rd ISPE International Conference on CAD/CAM, Robotics and Factories of the Future, Bogota, Colombia, 2007.
[2] F. El-Dubei & R. A. Hokoma, "Minimizing inventory costs throughout the supply shain within a cement factory: A Case Study, MEQA, 4th Annual Congress, Dubai, UAE, 2010
[3] F. Grange, "Challenges in modeling demand for inventory optimization of slow-moving items". Proceeding of the 1998 winter simulation conference. Pp. 1211-1217, 1998.
[4] M. Mobbs, (2001), The mineral industry of Libya, U.S. geological survey, available at:
[Accessed 17th November 2011].
[5] R. A. Hokoma, M. Tughar, R. Abdussalam, E. Ramadan & S. Bindra, Strategic impact of JIT techniques for construction industry, Proceeding of the Second International Engineering Conference on Construction and Development, Gaza, Palestine, 2007.
[6] R. A. Hokoma, M. K. Khan & K. Hussain, Investigation into the Various Implementation Stages of Manufacturing and Quality Techniques/Philosophies Within the Libyan Cement Industry, Journal of Manufacturing Technology Management, Volume 19, No. 7. Pp. 893- 906, 2008.
[7] R. Abdulssalam, R. A. Hokoma, M. Esbiga & H. Omer., Strategy applied towards implementing JIT and MRPIUI planning and control techniques within Libyan construction and cement industries, proceedings of the international conference on technology management (ictm), Kuala Lumpur, Malaysia, 2006.
[8] R. Operta & P. Taylor, "Operations Management". 4th Edition. Mc Graw Hill, 1992.
[9] R. Handfield, I. Ernest & J. Nichols, "Introduction to supply chain management". Michigan State University, Memphis University, pp. 1- 24, 1999.
[10] S. Graves & S. Willems, "Optimizing strategic safety stock placement in supply chains". Manufacturing & service operations management, inform. Winter 2000. Pp. 68-83, 2000.
[11] F. El Dubei & M. Matoug, A simulation model for minimizing the customer inventory cost in a supply chain, periodical scientific international journal, vol. 1, no.2, pp. 14-27, 2006.
[12] S. Chopra & P. Meindl, "Supply chain management strategy, planning, and operation". Prentice Hall, Inc.; Upper Saddle River; New Jersey; pp. 3-60; 169-171; 2001.