Modeling the Uncertainty of the Remanufacturing Process for Consideration of Extended Producer Responsibility (EPR)
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Modeling the Uncertainty of the Remanufacturing Process for Consideration of Extended Producer Responsibility (EPR)

Authors: Michael R. Johnson, Ian P. McCarthy

Abstract:

There is a growing body of evidence to support the proposition of product take back for remanufacturing particularly within the context of Extended Producer Responsibility (EPR). Remanufacturing however presents challenges unlike that of traditional manufacturing environments due to its high levels of uncertainty which may further distract organizations from considering its potential benefits. This paper presents a novel modeling approach for evaluating the uncertainty of part failures within the remanufacturing process and its impact on economic and environmental performance measures. This paper presents both the theoretical modeling approach and an example of its use in application.

Keywords: Remanufacturing, Demanufacturing, Extended Producer Responsibility, Sustainability, Uncertainty.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1062346

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1744

References:


[1] Jain, V.,"Editorial: Special issue on supply chain management and reverse logistics,"International Journal of Production Research, 50 (5), pp.1239-1242, 2012.
[2] Gunasekaran, A. andSpalanzani, A. "Sustainability of manufacturing and services: Investigations for research and applications,"International Journal of Production Economics, doi:10.1016/j.ijpe.2011.05.011
[3] D. Guide Jr., "Production planning and control for remanufacturing: industry practice and research needs," Journal of Operations Management, 18, pp.467-483, 2000.
[4] Johnson , M. and Wang, M., "Economical evaluation of disassembly operations for recycling, remanufacturing and reuse,"International Journal of Production Research, 36, pp.3227-3252, 1998.
[5] Karakayalı, I., Emir-Farinas, H. andAkçalı, E., "Pricing and recovery planning for demanufacturing operations with multiple used products and multiple reusable components,"Computers & Industrial Engineering, 59, pp.55-63, 2010.
[6] Corbett, C.J. and Kleindorfer, P.R., "Environmental management and operationsmanagement,"Production and Operations Management, 10 (2), pp.107-111, 2001.
[7] Martin, P., Guide, V.D.R., Craighead, C.W., "Supply Chain Sourcing in Remanufacturing Operations: An Empirical Investigation of Remake Versus Buy," Decision Sciences, 41, (2), May, 2010.
[8] Directive 2002/96/EC of the European Parliament and Council of 27 January 2003 on waste electrical and electronic equipment (WEEE), Official Journal of the European Union, 13.2.2003.
[9] Azadivar, F. and Ordoobadi, S. "A Simulation Model to Justify Remanufacturing Policies," Proceedings of the 2010 Winter Simulation Conference, Dec, 2010, Baltimore, USA.
[10] V. D. R. Guide, and R. Srivastava, "An evaluation of order release strategies in a remanufacturing environment," Computers & Operations Research, 24, pp.37-47, Jan, 1997.
[11] Teunter, R.H. and Flapper, S.D. "Optimal core acquisition and remanufacturing policies under uncertain corequality fractions," European Journal of Operational Research, 210, pp.241-248, 2011.
[12] C. B. Li, Y. Tang, and C. C. Li, "A GERT-based Analytical Methodfor Remanufacturing Process Routing," Proceedings of IEEE 7th International Conference on Automation Science and Engineering, Trieste, Italy, pp.462-467, Aug, 2011.
[13] Tang, Y. "Uncertainty Management in Remanufacturing: A Review," 8th IEEE International Conference on Automation Science and Engineering, Aug, 2012, Seoul, Korea.
[14] Shu, L. H. and Flowers, W. C. "Application of a Design for Remanufacture Framework to the Selection of Product Life-Cycle Fastening and Joining Methods,"Robotics and Computer Integrated Manufacturing, 15, (3), pp.179-190, 1999.
[15] K. Inderfurth, "Impact of uncertainties on recovery behavior in aremanufacturing environment: A numerical analysis," International Journal of Physical Distribution and Logistics Management, 35, (5),pp. 318-336, 2005.
[16] Ferrer,G.,"Yieldinformationandsupplierresponsivenessinremanufacturin g operations," EuropeanJournalofOperationalResearch, 149, pp.540- 556, 2003.
[17] Ketzenberg,M.E.,VanderLaan,E.A.,and Teunter,R.H., "The value of information in reverselogistics,"ERIM ReportSeriesReferenceNoERS- 2004-053-LIS, 2004.
[18] Ferrer, G., and Ketzenberg, M. E. "Value of information inr emanufacturingcomplex products,"IIETransactions, 36, pp.265-277, 2004.
[19] Zikopoulos, C. andTagaras, G. "On the attractiveness of sorting beforedisassembly inaremanufacturingfacility,"IIE Transactions,40, pp.313-323, 2004.
[20] Johnson, M.R. and McCarthy, I.P. "Remanufacturing Optimization within the context ofExtended Producer Responsibility," 2nd International Conference on Operations Research and Statistics, April, 2012, Bali, Indonesia.