Applying Lean Principles, Tools and Techniques in Set Parts Supply Implementation
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33093
Applying Lean Principles, Tools and Techniques in Set Parts Supply Implementation

Authors: Suhartini M. Jainury, Rizauddin Ramli, Mohd Nizam A. Rahman

Abstract:

Lean, which was initially developed by Toyota, is widely implemented in other companies to improve competitiveness. This research is an attempt to identify the adoption of lean in the production system of Malaysian car manufacturer, Proton using case study approach. To gain the in-depth information regarding lean implementation, an activity on the assembly line called Set Parts Supply (SPS) was studied. The result indicates that by using lean principles, tools and techniques in the implementation of SPS enabled to achieve the goals on safety, quality, cost, delivery and morale. The implementation increased the size of the workspace, improved the quality of assembly and the delivery of parts supply, reduced the manpower, achieved cost savings on electricity and also increased the motivation of manpower in respect of attendance at work. A framework of SPS implementation is suggested as a contribution for lean practices in production system.

Keywords: Assembly line, lean manufacturing, production, parts supply.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1061703

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5644

References:


[1] T. Melton, "The Benefits of Lean Manufacturing: What Lean Thinking has to Offer the Process Industries," Chemical Engineering Research and Design, vol. 83, no. 6, pp. 662-673, 2005.
[2] S. Bhim, S. K. Garg, S. K. Sharma, and G. Chandandeep, "Lean implementation and its benefits to production industry," International Journal of Lean Six Sigma, vol. 1, no. 2, pp. 157-168, 2010.
[3] J. K. Liker, The Toyota Way. New York: McGraw-Hill, 2004.
[4] R. Shah and P. T. Ward, "Defining and developing measures of lean production," Journal of Operations Management, vol. 25, no. 4, pp. 785- 805, 2007.
[5] R. J. Schonberger, "Japanese production management: An evolution-- With mixed success," Journal of Operations Management, vol. 25, no. 2, pp. 403-419, 2007.
[6] N. Nordin, B. M. Deros, and D. A. Wahab, "A Survey on Lean Manufacturing Implementation in Malaysian Automotive Industry," International Journal of Innovation, Management and Technology, vol. 1, no. 4, pp. 374-380, 2010.
[7] Y. Monden, Toyota Production System: An Integrated Approach to Just In Time, Fourth ed. New York: CRC Press, 2011, pp. 271-274.
[8] T. Nomura, "Set Parts Supply System in Guangzhou Toyota
[in Japanese]," Bulletin of the Kagoshima Prefectural Jr. College. Cultural and social science, vol. 59, no. pp. 17-29, 2008.
[9] Y.-c. Wang, L.-f. Wang, Z.-y. Xu, and G. Yang, "IE is the accelerator of economic growth mode transformation of autonomous vehicle," in 17Th International Conference Industrial Engineering and Engineering Management (IE&EM), 2010, pp. 759-765.
[10] S. Deechongkit and R. Srinon, "Three Alternatives Approaches of Material Supply in Assembly Line: A Comparative Study," presented at the Asia Pacific Industrial Engineering & Management System, Kitakyushu, Japan, 2009.
[11] H. Noguchi, "A new mixed flow production line for multiple automotive models at Tsutsumi plant (in Japanese)," Factory Management, vol. 51, no. 1, pp. 16-33, 2005.
[12] A. Smalley. (2009, 1 December). Toyota's New Material-Handling System Shows TPS's Flexibility. Available: http://www.leaninstituut.nl/publications/1106/ToyotaNewMaterialHandl ingSystem.pdf
[13] R. K. Yin, Case Study Research: Design and Methods, 4th ed. Thousand Oaks, CA: Sage Publications, 2009, pp. 8-23.
[14] R. Abdullah, K. Jusoff, Z. Ahmad, and Y. Takahashi, "The Japanese Influence in Malaysian Automotive Industry: Human Resources Management and Development Practices," Management Science and Engineering, vol. 3, no. 4, pp. 59-70, 2009.
[15] S. Leshem and V. Trafford, "Overlooking the conceptual framework," Innovations in Education and Teaching International, vol. 44, no. 1, pp. 93-105, 2007.
[16] B. M. Deros, S. r. M. Yusof, and A. M. Salleh, "A benchmarking implementation framework for automotive manufacturing SMEs," Benchmarking: An International Journal, vol. 13, no. 4, pp. 396-430, 2006.
[17] S. Bhasin, "Lean and performance measurement," Journal of Manufacturing Technology Management, vol. 19, no. 5, pp. 670-684, 2008.
[18] V. Ramesh and R. Kodali, "A decision framework for maximising lean manufacturing performance," International Journal of Production Research, vol. 50, no. 8, pp. 2234-2251, 2011.
[19] R. Gapp, R. Fisher, and K. Kobayashi, "Implementing 5S within a Japanese context: an integrated management system," Management Decision, vol. 46, no. 4, pp. 565-579, 2008.
[20] D. Seth and D. Tripathi, "Relationship between TQM and TPM implementation factors and business performance of manufacturing industry in Indian context," International Journal of Quality & Reliability Management, vol. 22, no. 3, pp. 256-277, 2005.
[21] R. Shah and P. T. Ward, "Lean manufacturing: context, practice bundles, and performance," Journal of Operations Management, vol. 21, no. 2, pp. 129-149, 2003.
[22] I. P. S. Ahuja and J. S. Khamba, "Total productive maintenance: literature review and directions," International Journal of Quality & Reliability Management, vol. 25, no. 7, pp. 709-756, 2008.
[23] Y. Sugimori, K. Kusunoki, F. Cho, and S. Uchikawa, "Toyota production system and kanban system materialization of just-in-time and respect-for-human system," International Journal of Production Research, vol. 15, no. 6, pp. 553-564, 1977.
[24] S. Sakakibara, B. B. Flynn, R. G. Schroeder, and W. T. Morris, "The Impact of Just-in-Time Manufacturing and Its Infrastructure on Manufacturing Performance," Management Science, vol. 43, no. 9, pp. 1246-1257, 1997.
[25] A. H├╝ttmeir, S. de Treville, A. van Ackere, L. Monnier, and J. Prenninger, "Trading off between heijunka and just-in-sequence," International Journal of Production Economics, vol. 118, no. 2, pp. 501- 507, 2009.
[26] P. G. Ranky, "Eighteen "monozukuri-focused" assembly line design and visual factory management principles with DENSO industrial examples," Assembly Automation, vol. 27, no. 1, pp. 12-16, 2007.