Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33093
A Systematic Review on the Integration of Project Management with Organizational Flows
Authors: MaurĂcio Covolan Rosito, Ricardo Melo Bastos
Abstract:
Software projects are very dynamic and require recurring adjustments of their project plans. These settings can be understood as reconfigurations in the schedule, in the resources allocation and other design elements. Yet, during the planning and execution of a software project, the integration of specific activities in the projects with the activities that take part in the organization-s common activity flow should be considered. This article presents the results from a systematic review of aspects related to software projects- dynamic reconfiguration emphasizing the integration of project management with the organizational flows. A series of studies was analyzed from the year 2000 to the present. The results of this work show that there is a diversity of techniques and strategies for dynamic reconfiguration of software projects-. However, few approaches consider the integration of software project activities with the activities that take part in the organization-s common workflow.Keywords: Dynamic Reconfiguration, Organizational workflows, Project Management, Systematic Review
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1327957
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1735References:
[1] D. Callegari, and R. Bastos, "Project Management and Software Development Processes: Integrating RUP and PMBOK", ICSEM - International Conference on Systems Engineering and Modeling, 2007.
[2] B. Lee, J. and Miller, "Multi-Project Management in Software Engineering Using Simulation Modelling", Software Quality Journal, vol. 12-1, pp. 59-82, 2004.
[3] T. Abdel-Hamid, and S. E. Madnick, "Software Project Dynamics: an Integrated Approach", Englewood Cliffs, Prentice Hall, 1991.
[4] H. Kerzner, "Project management best practice: achieving global excellence", New Jersey: John Wiley & Sons Inc, 2006.
[5] R. Pressman, "Software engineering: a practitioner's approach", McGraw-Hill, 6th edition, 2004.
[6] D. Callegari, and R. Bastos, "A Multi-Criteria Resource Selection Method for Software Projects using Fuzzy Logic", ICEIS - International Conference on Enterprise Information Systems, pp. 376-388, 2009.
[7] D. Joslin, and W. Poole, "Agent-Based Simulation For Software Project Planning", In: Proceedings of the 37th Conference on Winter Simulation, Orlando, Florida, pp.1059-1066, 2005.
[8] D. Callegari, M. Rosito, M. Blois, R. Bastos. "An Integrated Model for Managerial and Productive Activities in Software Development", In: ICEIS - 10th International Conference on Enterprise Information Systems, Spain, 8p, 2008.
[9] B. Kitchenham, "Procedures for performing systematic reviews", Joint Technical Report Software Engineering Group, Department of Computer Science, Keele University, 33p, 2004.
[10] J. Biolchini, P.G. Mian, A.C.C. Natali, and G.H. Travassos, "Systematic review in software engineering". Rio de Janeiro, 31p, 2005.
[11] Y. Chen, M. Fang, "Research on Resource Scheduling for Development Process of Complicated Product". In: Proceedings of the 9th International Conference on Computer Supported Cooperative Work. Coventry University, UK, Vol. 1, pp.229-233, 2005.
[12] A. Riha, M. Pechoucek, H. Krautwunnova, P. Charva, A. Koumpis, "Adoption of an Agent-Based Production Planning Technology in the Manufacturing Industry", In: 12th International Workshop on Database and Expert Systems Applications, pp. 640-646, 2001.
[13] C.L. Zhao, X.G. Ming, X.H. Wang, and D. Li, "A Framework of Supplier Involved Collaborative Project Management", 1st International Conference on Information Science and Engineering, pp. 4130-4135, 2009.
[14] T. Aye, and K. Tun, "A Collaborative Mobile Agent-based Workflow System". In: 6th Asia-Pacific Symposium on Information and Telecommunication Technologies, pp 59-65, 2005.
[15] D. Delen, P. Benjamin, and M. Erraguntla, "An Integrated Toolkit for Enterprise Modeling and Analysis", In: Proceedings of the 1999 Winter Simulation Conference, pp. 289-297, 1999.
[16] D. Diwakar, and S. Diwakar, "CINWEGS-An Integrated Web and Grid Services Framework for Collaborative Solutions", In: 4th International Conference on Next Generation Web Services Practices, pp. 21-27, 2008.
[17] J. Grudin, "Managerial Use and Emerging Norms: Effects of Activity Patterns on Software Design and Deployment", In: Proceedings of the 37th Hawaii International Conference on System Sciences, pp. 1-10, J. 2004.
[18] P. Jalote, A. Palit, P. Kurien, V.T. and Peethamber, "Timeboxing: a process model for iterative software development", Journal of Systems and Software, vol.70, 1-2, pp.117-127, 2004.
[19] J. C. de Almeida Biolchini, P. G. Mian, A. C. C. Natali, T. U. Conte, and G. H. Travassos,"Scientific research ontology to support systematic review in software engineering", Adv. Eng. Inform., 21(2):133-151, 2007.
[20] J. P. Higgins and S. Green, editors. "Cochrane Handbook for Systematic Reviews of Interventions Version 5.0.1
[updated September 2008]", The Cochrane Collaboration, 2008.
[21] Project Management Institute, "PMBOK - A Guide to the Project Management Body of Knowledge" Newtown Square, PA: Project Management Institute, 4th edition, 2008.
[22] K. Schwalbe, "Information Technology Project Management", Thomson Learning, 2nd edition, 2002.
[23] J. Lee and N. Lee. "Least modification principle for case-based reasoning: a software project planning experience". In Expert Systems with Applications, volume 30, Issue 2, pp 190-202, 2006.
[24] I. Sommerville, "Software engineering", Addison-Wesley, 8th edition, 2006.