A New Approach to Workforce Planning
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
A New Approach to Workforce Planning

Authors: M. Othman, N. Bhuiyan, G. J. Gouw

Abstract:

In today-s global and competitive market, manufacturing companies are working hard towards improving their production system performance. Most companies develop production systems that can help in cost reduction. Manufacturing systems consist of different elements including production methods, machines, processes, control and information systems. Human issues are an important part of manufacturing systems, yet most companies do not pay sufficient attention to them. In this paper, a workforce planning (WP) model is presented. A non-linear programming model is developed in order to minimize the hiring, firing, training and overtime costs. The purpose is to determine the number of workers for each worker type, the number of workers trained, and the number of overtime hours. Moreover, a decision support system (DSS) based on the proposed model is introduced using the Excel-Lingo software interfacing feature. This model will help to improve the interaction between the workers, managers and the technical systems in manufacturing.

Keywords: Decision Support System, Human Factors, Manufacturing System, Workforce Planning.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1327843

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2550

References:


[1] M. D. Byrne, and M. A. Bakir, M.A., "Production planning using a hybrid simulation-analytical approach," International Journal of Production Economics, vol. 59, no. 305-311, 1999.
[2] M. B. Aryanezhad, V. Deljoo, and S. M. J. Al-e-hashem, "Dynamic cell formation and the worker assignment problem: a new model," The International Journal of Advanced Manufacturing Technology, vol. 41, no. 3-4, pp. 329-342, 2009.
[3] B. Bidanda, P. Ariyawonggrat, K. M. Needy, B. A. Norman, and W. Tharmmaphornphilas, "Human related issues in manufacturing cell design, implementation, and operation: a review and survey," Computers & Industrial Engineering, vol. 48, no. 507-523, 2005.
[4] P. Oborski, "Man-machine interactions in advanced manufacturing systems," International Journal of Advanced Manufacturing Technology, vol. 23, no. 3-4, pp. 227-232, 2004.
[5] G. Udo and A. Ebiefung, "Human factors affecting the success of advanced manufacturing systems," Computers & Industrial Engineering, vol. 37, pp. 297-300, 1999.
[6] C. W. Clegg, et al., "An international survey of the use and effectiveness of modern manufacturing practices," Human Factors and Ergonomics in Manufacturing, vol. 12, no. 2, pp.171-191, 2002.
[7] J. A. Buzacott, "The impact of worker differences on production system output," International Journal of Ergonomics Economics, vol. 78, no. 37-44, 2002.
[8] M. Berglund, and J. Karltun, "Human, technological and organizational aspects influencing the production scheduling process," International Journal of Production Economics, vol. 110, no. 1-2, pp. 160-174, 2007.
[9] P. L. Jensen, "Human factors and ergonomics in the planning of production," International Journal of Industrial Ergonomics, vol. 29, pp. 121-131, 2002.
[10] P. Wirojanagud, E. S. Gel, J. W. Fowler, and R. Cardy, "Modeling inherent worker differences for workforce planning," International Journal of Production Research, vol. 45, no. 3, pp. 525-553, 2007.
[11] H-C. Huang, L-H. Lee, H. Song, and B. T. Eck, "SimMan-A simulation model for workforce capacity planning," Computers & Operations Research, vol. 36, no. 8, pp. 2490-2497, 2008.
[12] B. A. Norman, W. Tharmmaphornphilas, K. L. Needy, B. Bidanda, and R. C. Warner, "Worker assignment in cellular manufacturing considering technical and human skills," International Journal of Production Research vol. 40, no. 6, pp. 1479-1492, 2002.
[13] Y. Y. Lee, "Fuzzy set theory approach to aggregate production planning and inventory control," Ph.D. Dissertation. Department of I.E., Kansas State University, 1990.
[14] J. B. Mazzola, A. W. Neebe, and C. M. Rump, "Multiproduct production planning in the presence of work-force learning," European Journal of Operational Research, vol. 106, no. 2-3, pp. 336-356, 1998.
[15] R. C. Wang, and H. H. Fang, "Aggregate production planning with multiple objectives in a fuzzy environment," European Journal of Operational Research, vol. 133, pp. 521-536, 2001.
[16] J. Tang, R. Y. K. Fung, and K-L. Yung, "Fuzzy modeling and simulation for aggregate production planning," International Journal of Systems Science, vol. 34, no. 12-13, pp. 661-673, 2003.
[17] R. C. Wang, and T. F. Liang, "Application of fuzzy multi-objective linear programming to aggregate production planning," Computers & Industrial Engineering, vol. 46, pp. 17-41, 2004.
[18] L. Pradenas, and F. Pe├▒ailillo, and J. Ferland, "Aggregate production planning problem. A new algorithm," Electronic Notes in Discrete Mathematics, vol. 18, pp. 193-199, 2004.
[19] A. Jain, and U. S. Palekar, "Aggregate production planning for a continuous reconfigurable manufacturing process," Computers & Operations Research, vol. 32, no. 1213-1236, 2005.
[20] R. C. Wang, and T. F. Liang, "Applying possibilistic linear programming to aggregate production planning," International Journal of Production Economics, vol. 98, pp. 328-341, 2005.
[21] C. G. Da Silva, J. Figueira, J. Lisboa, and S. Barman, "An interactive decision support system for an aggregate production planning model based on multiple criteria mixed integer linear programming," The International Journal of Management Science, vol. 34, no. 167-177, 2006.
[22] S. Leung, and S. Chan, "A goal programming model for aggregate production planning with resource utilization constraint," Computers and Industrial Engineering, vol. 56, pp. 1053-1064, 2009.
[23] A. Jamalnia, and M. A. Soukhakian, "A hybrid fuzzy goal programming approach with different goal priorities to aggregate production planning," Computers & Industrial Engineering, vol. 56, no. 4, pp. 1474-1486, 2009.
[24] J. Tang, R. Y. K. Fung, and K-L. Yung, "Fuzzy modeling and simulation for aggregate production planning," International Journal of Systems Science, vol. 34, no. 12-13, pp. 661-673, 2003.
[25] S. C. K. Chu, "A mathematical programming approach towards optimized master production scheduling," International Journal of Production Economics, vol. 38, no. 2-3,pp. 269-279, 1995.
[26] S. J. Nam, and R. Logendran, "Aggregate production planning - A survey of models and methodologies," European Journal of Operational Research, vol. 61, no. 255-272, 1992.