Production Scheduling Improvements in an Automotive Sector Company
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Production Scheduling Improvements in an Automotive Sector Company

Authors: Govind Sharan Dangayach, Himanshu Bhatt

Abstract:

The paper attempts to overcome the fluctuations occurring in demand of the components in an automotive sector company. Resource and time being the strict constraints, the production is not able to match the pace of the fluctuating demand. So, we introduce some production schedules that help in meeting out the required demand. The merits and demerits of the approaches are also highlighted.

Keywords: Production scheduling, Demand rise, Capacity constrained resource (CCR), Overtime.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1088938

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1908

References:


[1] Schneider Jeff G., Boyan Justin A., Moore Andrew W., “Value function based production scheduling” The Robotics Institute and Computer Science Department, Carnegie Mellon University, Pittsburgh, PA 15213.
[2] Elkinsa Debra A., Huanga Ningjian, Alden Jeffrey M., (2004), “Agile manufacturing systems in the automotive industry”, Int. J. Production Economics 91, 201–214.
[3] Narsimhan Seetharama L., McLeavy Dennis W., Billington Peter J., (1995), “Production planning and inventory control”, Prentice hall of India, 2nd edition.
[4] Goldratt E.M., Cox J., “The Goal”, (1984), Croton-on-Husdon, N.Y: North River Press.
[5] Goldratt E.M., Cox J., “The Racel”, (1986), Croton-on-Husdon, N.Y: North River Press.
[6] Umble M.M. and Srikanth M.L. (1990), “Synchronous Manufacturing”, Cincinnati: South-Western.
[7] Goldratt E.M., (1990), “What is this thing called Theory of Constraints”, Croton-on-Husdon, N.Y: North River Press.