Assessing and Improving Ramp-Up Capability
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33093
Assessing and Improving Ramp-Up Capability

Authors: Sebastian Tschöpe, Konja Knüppel, Peter Nyhuis

Abstract:

In times when product life cycles are decreasing, while market demands are increasing, manufacturing enterprises are confronted with the challenge of more frequent and more complex ramp-ups. Thus it becomes obvious that ramp-up management is going to be a topic enterprises have to focus on in the future. Since each ramp-up is unique concerning the product, the process, the technology, the circumstances and the coaction of these four factors, the knowledge of the ramp-up situation and the current ramp-up capability of the enterprise are fundamental requirements for the subsequent improvement of the ramp-up capability of the production system.

In this article a methodology is going to be presented which can be used to define typical production ramp-up situations, to identify the current ramp-up capability of a production system and to improve it with respect to a specific situation. Additionally there will be a description of the functionality of a software-tool developed based on this methodology.

Keywords: Assessment methodology, ramp-up, ramp-up capability, software-tool.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1088552

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2008

References:


[1] T. Richtey, „Wicked Problems – Social Messes“, Decision Support Modelling with Morphological Analysis, Springer-Verlag, Berlin, Heidelberg, 2011
[2] H. Schlicksupp, Morphos - Methoden systematischer Problemlösung, Vogel Buchverlag, Würzburg, 1988.
[3] Schuh, G.; Gottschalk, S.; Tücks, G.: Anlaufgerechter Entwicklungsprozess, In: VDI-Z, Jahrgang 148, Nr. 9, 2006, S. 70-81
[4] von Wangenheim, S.; Dörnemann, J.: Von der Markteintrittsstrategie zum Serienanlauf. In: Horváth, P.; Fleig, G. (Hrsg.): Integrationsmanagement für neue Produkte. Schäffler-Poeschel Verlag, Ulm, 1998, S. 299-321.
[5] Schneider, M.: Assistenzsystem zur Strategiefestlegung in der Anlaufplanung (Diss.). Verlag Praxiswissen, Dortmund, 2006.
[6] Heins, M.: Anlauffähigkeit von Montagesystemen. Dissertation, PZH Produktionstechnisches Zentrum GmbH, Garbsen, 2010
[7] Wiendahl, H.-P.; ElMaraghy, H. A.; Nyhuis, P.; Zäh, M. F.; Wiendahl, H.-H.; Duffie, N.; Kolakowski, M.: Changeable Manufacturing: Classification, Design, Operation. CIRP Annals - Manufacturing Technology, Volume 56, Issue 2, 2007, S. 783-809
[8] Katzer, A.: Der Weg zur effizienten Fabrik: Ein Praxisleitfaden zur Einführung eines funktionierenden Produktionssystems. Kurt Ott Verlag, Hersfeld-Rotenburg 2006, S. 11
[9] Nyhuis, P. (Hrsg.): Wandlungsfähige Produktionssysteme: Heute die Industrie von morgen gestalten. PZH Produktionstechnisches Zentrum Hannover GmbH, Garbsen 2008, S. 20f.
[10] Nyhuis, P.; Reinhart, G.; Abele, E.: Wandlungsfähige Produktionssysteme. Heute die Industrie von morgen gestalten. PZH Produktionstechnisches Zentrum GmbH, Garbsen, 2008.
[11] Anja M. Maier, James Moultrie, and P. John Clarkson, Assessing Organizational Capabilities: Reviewing and Guiding the Development of Maturity Grids, IEEE Transactions on Engineering Management, Vol. 59, No. 1, February 2012, p.138