Integrated Water Management for Lafarge Cement-Jordan
Authors: Azzam Hamaideh, Abbas Al-Omari, Michael Sturm
Abstract:
This study aims at implementing integrated water resources management principles to the Lafarge Cement Jordan at Al-Fuhais plant. This was accomplished by conducting water audits at all water consuming units in the plant. Based on the findings of the water audit, an action plan to improve water use efficiency in the plant was proposed. The main elements of which are installing water saving devices, re-use of the treated wastewater, water harvesting, raising the awareness of the employees, and linking the plant to the water demand management unit at the Ministry of Water and Irrigation.
The analysis showed that by implementing the proposed action plan, it is expected that the industrial water demand can be satisfied from non-conventional resources including treated wastewater and harvested water. As a consequence, fresh water can be used to increase the supply to Al-Fuhais city which is expected to reflect positively on the relationship between the factory and the city.
Keywords: Integrated water resources management, non-conventional water resources, water awareness, water demand management, water harvesting, water saving devices.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1088196
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2613References:
[1] Abdulla, A. , Eshtawi, T. and Assaf, H. 2009. Assessment of the Impact of Potential Climate Change on theWater Balance of a Semi-arid Watershed. Water Resources Management, 23:2051–2068.
[2] Jridi A (2005) The development of Jordanian Jordan River Basin: the main historical steps. French
[3] IRIN, (2009), Integrated Regional Information Networks retrieved October 30, 2009 from www.irinnews.org/report.aspx?ReportId=86250
[4] MWI, (2009), Water Policy, retrieved November 24 from www.mwi.gov.jo/English/MWI/WaterStrategicPolices/Pages/WaterPolic y.aspx
[5] Jordan Chamber of Industry (JCI) (2007) study on the Jordanian Industrial in 2007 page: 4.
[6] Jordan Chamber of industry (JCI) (2008), report of administrative board in 2008 page: 8.
[7] MWI (2007), Water budget” retrieved November 21, 2009 from www.watersexpert.se/Jordan%202007.htm
[8] MWI (2004), National Water Master Plan.
[9] Lafarge group (2008). Sustainability Report, pp: 5-10, retrieved October 30, 2009 from www.lafarge.com