Contractor Selection in Saudi Arabia
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Contractor Selection in Saudi Arabia

Authors: M. A. Bajaber, M. A. Taha

Abstract:

Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few number of researches. The selection strategy is not perfect and considered as the reason behind irresponsible contractors. As a response, this research was conducted to review the contractor selection strategies as an integral part of a long advanced research to develop a good selection model. Many techniques can be used to form a selection strategy; multi criteria for optimizing decision, prequalification to discover contractor-s responsibility, bidding process for competition, third party guarantee to enhance the selection, and fuzzy techniques for ambiguities and incomplete information.

Keywords: Bidding, Construction industry, Contractor selection, Saudi Arabia.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1082710

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3144

References:


[1] AlJarallah M., "Construction industry in Saudi Arabia", J.C.E.M., V109 (4), 1983.
[2] Sirajaddin A. and Bajaber M., Claims and Arbitration in Engineering Contracts, 1st Ed. (Arabic), IS.9786030043156, 2010.
[3] Russell J. S., Constructor Prequalification: Choosing the Best Constructor and Avoiding Constructor Failure, 1996.
[4] AlSobiei O. S., Arditi D., and Polat G., "Predicting the risk of contractor default in Saudi Arabia utilizing ANN and GA techniques", C.M.E., V23, PP423-430, May 2005.
[5] Hanfi A. , A contractor: Hanfi Establishment for Trading and Contracting, "A Future guarantee for project continuous and default avoidance", a paper submitted for Defaulted Project Management Symposium, Eighth Annual Meeting of Saudi Society for Civil Engineering, Jeddah, 2012.
[6] Brahmin S. Y., secretary general of Makah development institution, "The Default of some construction projects in Makah provience", a paper submitted for Defaulted Project Management Symposium, Eighth Annual Meeting of Saudi Society for Civil Engineering, Jeddah, 2012.
[7] Harasani H. A., a contracting committee member in chamber of commerce at Makah, "Contracting defaults: analysis and solutions" a paper submitted for Defaulted Project Management Symposium, Eighth Annual Meeting of Saudi Society for Civil Engineering, Jeddah, 2012.
[8] Saunders M. Lewis P., and Thornhill A., Research Methods for Business Students, Third Edition, 2003.
[9] Fellows R. and Liu A., Research Methods for Construction, Blackwell Publishing Company, Second Edition, 2003.
[10] Alabidien, H., "Assessment of the structural safety of concrete buildings", 2nd Saudi Engineers Conference, V5, PP2821-2854, King Fahad University of Petroleum and Minerals (KFUPM), Dhahran, Nov. 1985.
[11] Fatani, M., "Construction supervision: past experience", 2nd Saudi Engineers Conference, V5, PP2855-2878, University of Petroleum and Minerals, Dhahran, Nov 1985.
[12] Alhazmi, M. H., "Causes of delay in large building projects", M.Thesis, (KFUPM), Dhahran, 1987.
[13] Bubshait A. and Al-Gobali K., "Factors considered in contractor prequalification in Saudi Arabia, the 4th Saudi Engineering Conference, V1, Nov1995.
[14] Al Tubayyeb, S. A., "Improving Construction Contract Administration Utilizing Multi-Attribute Statist. Analysis on Bid Stage Inform.", PHD dissertation, University of California at Berkeley, 1989.
[15] Bubshait A. and Al-Gobali K., "Contractor prequalification in Saudi Arabia", J.M.E., V12(2), 1996.
[16] Ashworth A., Pre-Contract Studies, Development Economics, Tendering and Estimating, Longman - Harlow, 1996.
[17] Griffith A., Knight A., King A., Best Practice for Design and Build Projects, 1st Ed., 2003.
[18] Alsugair, A., "Framework for evaluating bids of construction contractors", J.M.E., V15 (2), PP72-78, 1999.
[19] Baqais A. S., "Contractors prequalification: a requirement for avoiding the bad performance", AlEqtisadia Newspaper, No.6066, 21May 2010.
[20] Alsugair A. and Abuthnain M., "Assessment of the government contractor classification system in Saudi Arabia", Advanced Materials Research, V250-253, PP345-355, 2011.
[21] Collins, Collins English Dictionaries, http://www.collinsdictionary.com/ dictionary-/english/qualification, May 2012.
[22] Yawei Li, Xiangtian Nie, and Shouyu Chen, "Fuzzy Approach to Prequalifying Construction Contractors", J. Constr. Engrg. and Mgmt, V133(1), PP40-49, Jan2007.
[23] Holt G. D., Olomolaiye P. O., and Harris F. C., "Evaluating prequalification criteria in contractor selection", build. Environ, V29 (4), PP437–448.
[ISI], 1994.
[24] Chen S., Fuzzy System Decision-Making Theory and its Application, University of Technology Press, Dalian, China, 1994.
[25] Cheng C. H., and Lin Y., "Evaluating the best main battle tank using fuzzy decision theory with linguistic criteria evaluation", Eur. J. Oper. Res., V142 (1), PP174–186, 2002.
[26] Jaselskis E. and Russell J., “An Efficiency structured approach for selection of most promising construction contractors”, Project Management Institute (PMI), V22 (4), PP31-38, 1991.
[27] Singh D. and Tiong R. L. K., "A Fuzzy decision framework for contractor selection", J.C.E.M., V131 (1), PP62-70, Jan 2005.
[28] Stevens J. and AlDulaijan S., "Contractor financing, public works in Saudi Arabia", J.C.E.M., V115 (1), 1989.
[29] Russel J. and Skibniewski M, "Decision criteria in construction prequalification", J.M.E., V4 (2), App 1988.