Process and Supply-Chain Optimization for Testing and Verification of Formation Tester/Pressure-While- Drilling Tools
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33104
Process and Supply-Chain Optimization for Testing and Verification of Formation Tester/Pressure-While- Drilling Tools

Authors: Vivek V, Hafeez Syed, Darren W Terrell, Harit Naik, Halliburton

Abstract:

Applying a rigorous process to optimize the elements of a supply-chain network resulted in reduction of the waiting time for a service provider and customer. Different sources of downtime of hydraulic pressure controller/calibrator (HPC) were causing interruptions in the operations. The process examined all the issues to drive greater efficiencies. The issues included inherent design issues with HPC pump, contamination of the HPC with impurities, and the lead time required for annual calibration in the USA. HPC is used for mandatory testing/verification of formation tester/pressure measurement/logging-while drilling tools by oilfield service providers, including Halliburton. After market study andanalysis, it was concluded that the current HPC model is best suited in the oilfield industry. To use theexisting HPC model effectively, design andcontamination issues were addressed through design and process improvements. An optimum network is proposed after comparing different supply-chain models for calibration lead-time reduction.

Keywords: Hydraulic Pressure Controller/Calibrator, M/LWD, Pressure, FTWD

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1335002

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1453

References:


[1] Sunil Chopra,Peter Meindl, Dharam Vir Kalra Supply Chain management, Strategy, Planning and Operation,Presntince Hall,2008.ch 4,ch 6.