Integrating Big Island Layout with Pull System for Production Optimization
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33126
Integrating Big Island Layout with Pull System for Production Optimization

Authors: M. H. M. Rusli, A. Jaffar, M. T. Ali, S. Muhamud @ Kayat

Abstract:

Lean manufacturing is a production philosophy made popular by Toyota Motor Corporation (TMC). It is globally known as the Toyota Production System (TPS) and has the ultimate aim of reducing cost by thoroughly eliminating wastes or muda. TPS embraces the Just-in-time (JIT) manufacturing; achieving cost reduction through lead time reduction. JIT manufacturing can be achieved by implementing Pull system in the production. Furthermore, TPS aims to improve productivity and creating continuous flow in the production by arranging the machines and processes in cellular configurations. This is called as Cellular Manufacturing Systems (CMS). This paper studies on integrating the CMS with the Pull system to establish a Big Island-Pull system production for High Mix Low Volume (HMLV) products in an automotive component industry. The paper will use the build-in JIT system steps adapted from TMC to create the Pull system production and also create a shojinka line which, according to takt time, has the flexibility to adapt to demand changes simply by adding and taking out manpower. This will lead to optimization in production.

Keywords: Big Island layout, Lean manufacturing, Material and Information Flow Chart, Pull system production, TPS.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1082411

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2593

References:


[1] Allen, J., Robinson, C., and Stewart, D. (2001), Lean Manufacturing: A plant floor guide, Dearborn, Michigan: Society of Manufacturing Engineers.
[2] Liker, J.K. (1998). Becoming lean, Portland, OR: Productivity Press.
[3] Shahrukh A. Irani (1999), Handbook of Cellular Manufacturing Systems: Wiley-Interscience.
[4] Tapping, D., Luyster, T., & Shuker, T. (2002). Value stream management: Eight steps to planning, mapping, and sustaining lean improvements. New York, NY: Productivity Press.
[5] Toyota Institute, Toyota Motor Corporation (2001) The Toyota Way 2001.
[6] Womack, J.P. and Jones, D.T. (2003), Lean Thinking: Banish waste and create wealth in your organization. New York: Free Press.
[7] Serope Kalpakjian and Steven Schmid, Manufacturing engineering and technology, 5th edition, Prentice Hall, 2006.