Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32759
A Study of Methods for Preservation of River Banks in order to Reduce Sediments

Authors: Emad Hazbkhah. Abdolreza Zahiri, Hossein Ghorbanizade Kharazi

Abstract:

Reducing river sediments through path correction and preservation of river walls leads to considerable reduction of sedimentation at the pumping stations. Path correction and preservation of walls is not limited to one particular method but, depending on various conditions, a combination of several methods can be employed. In this article, we try to review and evaluate methods for preservation of river banks in order to reduce sediments.

Keywords: Erosion , River Banks , Sediments

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1081257

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1578

References:


[1] Standards of Water Engineering "Regulations of Hydraulic Pumping Stations Water Drawing Installations for Irrigation and Trenches" Ministry of Power. 1987
[2] M ,Fazeli. "Regulations and Basics of Designing Pumping Stations and Water Drawing Installations" Educational pamphlet, short term course, Shahid Abbaspour College of Water and Electrical Industry, 2002.
[3] National Company for Water and Soil Services. "Regulations and Technical Standards of Pressure Irrigation Methods" The Chief Department for the Development of Pressure Irrigation Methods,1999.
[4] Y. M Chiew, B. W. Melville Local scour around bridge piers.J. of Hydraulic Research, IAHR, 25, 15-26, 1987.
[5] F. R Clarke . The Action of Submerged Jets on Movable Material.Ph.D. Dissertation. Imperial College, London, U.K , 1962.
[6] X Dou,Numerical Simulation of Three-Dimensional Flow Field and Local Scour at Bridge Crossings. Ph.D. Dissertation. University of Mississippi, Oxford, MS, U.S.A , 1997 .
[7] YEN CHIN-LIEN, LAI JIHN-SUNG "Modeling of 3D Flow and Scouring around Circular Piers" Proc. Natl. Sci. Counc. ROC(A) Vol. 25, No. 1,. pp. 17-26 , 2001