Project Selection by Using Fuzzy AHP and TOPSIS Technique

Authors: S. Mahmoodzadeh, J. Shahrabi, M. Pariazar, M. S. Zaeri

Abstract:

In this article, by using fuzzy AHP and TOPSIS technique we propose a new method for project selection problem. After reviewing four common methods of comparing alternatives investment (net present value, rate of return, benefit cost analysis and payback period) we use them as criteria in AHP tree. In this methodology by utilizing improved Analytical Hierarchy Process by Fuzzy set theory, first we try to calculate weight of each criterion. Then by implementing TOPSIS algorithm, assessment of projects has been done. Obtained results have been tested in a numerical example.

Keywords: Fuzzy AHP, Project Selection, TOPSIS Technique.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1327748

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 6607

References:


[1] J. Meredith, S. Mantle, " Project Management: A Managerial Approach", fourth ed. Wiley, New York, 2000.
[2] N. Danila, "Strategic evaluation and solution of R&D projects", R&D Management 19, 47-62, 1999.
[3] A. Shpak, D. Zaporojan, "Working out R&D program via multicriteria analysis", Computer Science of Moldova 4 (2 (11)), 239-259, 1996.
[4] A. Mehrez, Z. Sinuany-Stern, "An interactive approach to project selection", Journal of Operational Research Society 34, 621-626, 1983.
[5] R. Khorramshahgole, H. M. Steiner, "Resource analysis in project evaluation", A multicriteria approach. Journal of Operational Research Society 95 (2), 795-803, 1998.
[6] P. K. Dey, M. T. Tabucanon, S. O. Ogunlana, "Hierarchical approach to project planning", Applied Mathematical Modelling 20, 683-698, 1996.
[7] P. Chu, Y. Hsu, M. Fehling, "A decision support system for project portfolio selection", Computer in Industry 32 (2), 141-149, 1996.
[8] G. Lockett, M. Stratford, "Ranking of research projects, experiments with two methods", Omega 15, 395-400, 1987.
[9] P. Regan, S. Holtzman, "R&D decision advisor: An interactive approach to normative decision system model construction", European Journal of Operational Research 84 (1), 1995.
[10] F. Ghasemzadeh, N. P. Archer, P. Iyogun, "A zero-one model for project portfolio selection and scheduling", Journal of Operational Research Society 50 (7), 745-755, 1999.
[11] F. Ghasemzadeh, N. P. Archer, "Project portfolio selection through decision support", Decision Support Systems 29, 73-88, 2000.
[12] P. K. Dey, S. S. Gupta, "Feasibility analysis of crosscountry pipeline projects: A quantitative approach", Project Management Journal 32 (4), 50-58, 2001.
[13] Mian, S. A., Christine, N.D., 1999. Decision-making over the project life cycle: An analytical hierarchy approach. Project Management Journal 30 (1), 40-52.
[14] C. H. Loch, S. Kavadias, "Dynamic portfolio selection of NPD programs using marginal returns", Management Science 48 (10), 1227-1241, 2002.
[15] R. Eugene, P. K. Dey, "The role of environmental factors in industrial site selection activities: A case of limestone quarry expansion in Barbados", Impact Assessment and Project Appraisal 23 (2), 2005.
[16] S. Hariharan, P. K. Dey, A. Y. Kumar, H. Moseley, " A new tool for measurement of process-based performance of multispecialty tertiary care hospital", International Journal of Health Care Quality Assurance 17 (6), 302-312. 116-133, 2004.
[17] T. L. Saaty, "The analytic hierarchy process", New York: McGraw- Hill; 1980.
[18] L. Zadeh, "Fuzzy sets", information control, vol 8, pp.338-53, 1965.
[19] C. Kahraman, U. Cebeci, Z. Ulukan "Multi-criteria supplier selection using fuzzy AHP", Logistic information Management. Volume 16. Number 6. pp. 382-394, 2003.
[20] D. Y. Chang,d, "Extent analysis and synthetic decision", Optimization Techniques and Application, vol (1) . p. 352, 1992.
[21] D. L. Olson, "Comparison of weights in TOPSIS models", Mathematical and Computer Modeling, 40, (7) 21-727, 2004.