A Comparison of Deterministic and Probabilistic Methods for Determining the Required Amount of Spinning Reserve
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32799
A Comparison of Deterministic and Probabilistic Methods for Determining the Required Amount of Spinning Reserve

Authors: A. Ehsani, A. Karimizadeh, H. Fallahi, A. Jalali

Abstract:

In an electric power system, spinning reserve requirements can be determined by using deterministic and/or probabilistic measures. Although deterministic methods are usual in many systems, application of probabilistic methods becomes increasingly important in the new environment of the electric power utility industry. This is because of the increased uncertainty associated with competition. In this paper 1) a new probabilistic method is presented which considers the reliability of transmission system in a simplified manner and 2) deterministic and probabilistic methods are compared. The studied methods are applied to the Roy Billinton Test System (RBTS).

Keywords: Reliability, Spinning Reserve, Risk, Transmission, Unit Commitment.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1329615

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1987

References:


[1] A. J. Wood and B. F. Wollenberg, Power Generation, Operation, and Control, 2nd Ed. New York: John Wiley & Sons, 1996.
[2] R. Billinton and R.N. Allan, Reliability Evaluation of Engineering Systems - Concepts and Techniques, 2nd Ed. New York: Plenum Press, 1992.
[3] R. Billinton and R.N. Allan, Reliability Evaluation of Power Systems, 2nd Ed. New York: Plenum Press, 1996.
[4] R. Billinton and M. Fotuhi-Firuzabad, "A reliability framework for generating unit commitment," Electr. Power Syst. Research, vol. 56, pp. 81-88, 2000.
[5] M. Fotuhi-Firuzabad, R. Billinton and M. E. Khan, "Extending unit commitment health analysis to include transmission considerations," Electr. Power Syst. Research, vol. 50, pp. 35-42, 1999.
[6] M. Fotuhi-Firuzabad and R. Billinton, "A mathematical framework for unit commitment and operating reserve assessment in electric power systems," in Proc. of the 14th Power System Computation Conference on Power Engineering., Jun. 2002.
[7] R. Billinton, S. Kumar, N. Chowdhury, K. Chu, K. Debnath, L. Goel, E. Khan, P. Kos, G. Nourbakhsh and J. Oteng-Adjei, "A Reliability Test System for Educational Purposes - Basic Data," IEEE Trans. Power Systems, vol. 4, pp. 1238-1244, Aug. 1989.
[8] H. Saadat, Power System Analysis, 1st Ed. Singapore: McGraw-Hill, 1999.