Evaluating Contractors in Construction Projects by Multi-Criteria Decision Making and Supply Chain Approach
Authors: Sara Najiazarpour, Mahsa Najiazarpour
Abstract:
There are many problems in contracting projects and their performance. At each project stage and due to different reasons, these problems affect cost, time, and quality. Hence, in order to increase the efficiency and performance in all levels of the chain and with supply chain management approach, there will be a coordination from the beginning of a project to the end of project (handover of project). Contractor selection is the foremost part of construction projects which in this multi-criteria decision-making, the best contractor is determined by expert judgment, different variables, and their priorities. In this paper for selecting the best contractor, numerous criteria were collected by asking from adept experts and then among them, 16 criteria with highest frequency were considered for questionnaire. This questionnaire was distributed between experts. Cronbach's alpha coefficient was used and then based on Borda function important criteria were selected which was categorized in four main criteria as follows: Environmental factors and physical equipment, past performance and technical expertise, affordability and standards. Then with PROMTHEE method, the criteria were normalized and monitored, finally the best alternative was selected. A case study had been done, and the best contractor was selected based on all criteria and their priorities.
Keywords: Evaluation and selecting contractors, project development, supply chain management, multi-criteria decision-making.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 84References:
[1] S. Chapra and P. -Meindl, Supply chain management. Pearson Education, 2001.
[2] M. Ghazanfari and M. Fathalah, Comprehensive approach to supply chain management. University of Science and Technology - Publications Center, 1386.
[3] D. Waters, Logistics: an introduction to supply chain management. Palgrave Macmillan, 2003.
[4] Y. Zare Mehrjardi -H.Momeni-Sh.Barghi, “Evaluation and selection of contractors in petrochemical projects" journal of business administration research, vol. 2, no. 3 pp. 32– 59, 2010.
[5] Y. M.-Z. N. Azimi-A.Pouya, “Identify and evaluate the effective indicators in Choose a Contractor to finance water and wastewater company Mashhad,” Sixth Int. Conf. Iran. Oper. Res. Soc., 2013.
[6] Benarroche, The Construction Bidding Process Explained, 2023
[7] Selection Criteria for Contractors, 2018, https://ask-ehs.com/blog/selection-criteria-for-contractors/
[8] K. Shaw, R. Shankar, S. S. Yadav, and L. S. Thakur, “Supplier selection using fuzzy AHP and fuzzy multi-objective linear programming for developing low carbon supply chain,” Expert Syst. Appl., vol. 39, no. 9, pp. 8182–8192, 2012.
[9] Y.-J. Chen, “Structured methodology for supplier selection and evaluation in a supply chain,” Inf. Sci. (Ny)., vol. 181, no. 9, pp. 1651–1670, 2011.
[10] P. Liu and X. Zhang, “Research on the supplier selection of a supply chain based on entropy weight and improved ELECTRE-III method,” Int. J. Prod. Res., vol. 49, no. 3, pp. 637–646, 2011.
[11] D. Kannan, R. Khodaverdi, L. Olfat, A. Jafarian, and A. Diabat, “Integrated fuzzy multi criteria decision making method and multi-objective programming approach for supplier selection and order allocation in a green supply chain,” J. Clean. Prod., vol. 47, pp. 355– 367, 2013.
[12] L. Shen, L. Olfat, K. Govindan, R. Khodaverdi, and A. Diabat, “A fuzzy multi criteria approach for evaluating green supplier’s performance in green supply chain with linguistic preferences,” Resour. Conserv. Recycl., vol. 74, pp. 170–179, 2013.
[13] G. Wang, S. H. Huang, and J. P. Dismukes, “Product-driven supply chain selection using integrated multi-criteria decision-making methodology,” Int. J. Prod. Econ., vol. 91, no. 1, pp. 1–15, Sep. 2004.
[14] C.-T. Chen, C.-T. Lin, and S.-F. Huang, “A fuzzy approach for supplier evaluation and selection in supply chain management,” Int. J. Prod. Econ., vol. 102, no. 2, pp. 289–301, Aug. 2006.
[15] R. P. Nydick, Robert L.Hill, “Using the Analytic Hierarchy Process to Structure the Supplier Selection Proc ...,” Int. J. Purch. Mater. Manag., vol. 28, no. 2, p. pg. 31-36, 1992.
[16] W. Xia and Z. Wu, “Supplier selection with multiple criteria in volume discount environments,” Omega, vol. 35, no. 5, pp. 494–504, 2007.
[17] F. E. Boran, S. Genç, M. Kurt, and D. Akay, “A multi-criteria intuitionistic fuzzy group decision making for supplier selection with {TOPSIS} method,” Expert Syst. Appl., vol. 36, no. 8, pp. 11363–11368, 2009.
[18] G. H. Hong, S. C. Park, D. S. Jang, and H. M. Rho, “An effective supplier selection method for constructing a competitive supply-relationship,” Expert Syst. Appl., vol. 28, no. 4, pp. 629–639, 2005.
[19] C. O. Swift, “Preferences for single sourcing and supplier selection criteria,” J. Bus. Res., vol. 32, no. 2, pp. 105–111, 1995.