Numerical Modeling of Artisanal and Small-Scale Mining of Coltan in the African Great Lakes Region
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33093
Numerical Modeling of Artisanal and Small-Scale Mining of Coltan in the African Great Lakes Region

Authors: Sergio Perez Rodriguez

Abstract:

Findings of a production model of Artisanal and Small-Scale Mining (ASM) of coltan ore by an average Democratic Republic of Congo (DRC) mineworker are presented in this paper. These can be used as a reference for a similar characterization of the daily labor of counterparts from other countries in the Africa's Great Lakes region. To that end, the Fundamental Equation of Mineral Production has been applied in this paper, considering a miner's average daily output of coltan, estimated in the base of gross statistical data gathered from reputable sources. Results indicate daily yields of individual miners in the order of 300 g of coltan ore, with hourly peaks of production in the range of 30 to 40 g of the mineral. Yields are expected to be in the order of 5 g or less during the least productive hours. These outputs are expected to be achieved during the halves of the eight to 10 hours of daily working sessions that these artisanal laborers can attend during the mining season.

Keywords: Coltan, mineral production, Production to Reserve ratio, artisanal mining, small-scale mining, ASM, human work, Great Lakes region, Democratic Republic of Congo.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 194

References:


[1] Shen, L., & Gunson, A. J. The role of artisanal and small-scale mining in China’s economy. Journal of Cleaner Production, 2006, 14: 427-435.
[2] Yang, J, Oeqvist, L. S. State of the art on the recovery of refractory metals from primary resources. MSP-REFRAM - D3.2; Euratom, Brussels, 2016, pp. 1-112.
[3] U.S. House of Representatives. Dodd-Frank Five Years Later: What Have We Learned from Conflict Minerals Reporting? U.S. Government Publishing Office, Washington, 2015, pp. 1-405.
[4] Ojewale, O. (2022). Fixing the Problem. Addressing the enablers of coltan smuggling in the DRC requires holistic solutions. https://www.theafricareport.com/203796/addressing-the-enablers-of-coltan-smuggling-in-the-drc-requires-holistic-solutions/ (Accessed on 04 Nov. 2022)
[5] Schütte, P. & Naher, U. Tantalum supply from artisanal and small-scale mining: A mineral economic evaluation of coltan production and trade dynamics in Africa’s Great Lakes region. Resources Policy, 2020, 69, 101896.
[6] Weyns, Y., Hoex L., Matthysen K. Analysis of the interactive map of artisanal mining areas in eastern DR Congo. 2015 update. IPIS: Antwerp, 2016, pp. 1-41
[7] Iguma Wakenge, C. Stadium Coltan. Artisanal Mining, Reforms and Social Change in Eastern Democratic Republic of Congo. PhD Thesis, Wageningen University, Wageningen, 2017, pp. 1-210.
[8] Ministere des Mines. Mining statistics in the first half of 2022, tin sector. https://mines-rdc.cd/fr/archives/1011 (Accessed on 04 Nov. 2022)
[9] Bookhagen, B. Metallic Resources in Smartphones. Doctoral Thesis. University of Vienna. Vienna, 2020, pp. 1-201.
[10] Mwangeka Makori, T. Artisanal Mines, Governance and Historical Generations in the Congo Copperbelt. University of Toronto, Toronto, 2019, pp. 1-285.
[11] Hayes, K & Burge, R. Coltan Mining in the Democratic Republic of Congo: How tantalum-using industries can commit to the reconstruction of the DRC. Fauna & Flora International, Cambridge, 2003. Pp' 1-64.
[12] Pérez Rodriguez, S. Methodology and Equations of Mineral Production Forecast. Part I. Crude Oil in the UK and Gold in Nevada, USA. Prediction of Late Stages of Production. Open Journal of Geology, 2013a, 3: 352-360. doi.org/10.4236/ojg.2013.35040.
[13] Pérez Rodriguez, S. Methodology and Equations of Mineral Production Forecast. Part II. The Fundamental Equation. Crude Oil Production in USA. Open Journal of Geology, 2013b, 3: 384-395. d2.org/10.4236/ojg.2013.36044.
[14] Pérez Rodriguez, S. Numerical Modelling of Artisanal and Small-scale Mining Production. International Journal on Emerging Technologies, 2021, 12(2): 213-220
[15] Pérez Rodriguez, S. Modeling and forecasting complex patterns of mineral production. Gold mining in Canada. Cogent Engineering, 2020, 7(1), 1-16. https://doi.org/10.1080/23311916.2020.1724849.
[16] Fritz, M., McQuilken, J., Collins, N., & Weldegiorgis, F. Global Trends in Artisanal and Small-Scale Mining (ASM): A Review of Key Numbers and Issues. IISD, Winnipeg, 2018, pp. 1-81
[17] Jaillon A., Jorns, A., de Brier G., Geray M. (2020). How much does a miner earn? Assessment of miner’s revenue; basic needs study in the DRC https://ipisresearch.be/publication/much-miner-earn-assessment-miners-revenue-basic-needs-study-drc/(Accessed 06 Nov. 2022)
[18] Pencavel, J. The Productivity of Working Hours. The Economic Journal, 2015, 125 (589): 2052-2076.
[19] Collewet M., & Sauermann J. Working Hours and Productivity, IZA DP No. 10722. IZA Institute of Labor Economics, Bonn, 2017, pp. 1-35.
[20] Claerbout, J., Muir, F. (2008). “Hubbert math”. Sepstanford.edu. http://sepwww.stanford.edu/sep/jon/hubbert.pdf (Accessed 06 Nov. 2022)
[21] 21. Yung, M. (2016). Fatigue at the Workplace: Measurement and Temporal Development. UWSpace. http://hdl.handle.net/10012/10119
[22] 22. Yung, M., Kolus, A., Wells, R., Neumann, W. P. Examining the fatigue-quality relationship in manufacturing. Applied Ergonomics. 2020, 82, 102919. https://doi.org/10.1016/j.apergo.2019.102919
[23] Cavuoto, L., Megahed, F. (2016). Understanding Fatigue and the Implications for Worker Safety. ASSE-16-734. ASSE Professional Development Conference and Exposition. ASSE-EST. Atlanta, Georgia, USA.
[24] Jowitt, S.M., Mudd, G.M. & Thompson, J.F.H. Future availability of non-renewable metal resources and the influence of environmental, social, and governance conflicts on metal production. Communications Earth & Environment, 2020, 1, 13. https://doi.org/10.1038/s43247-020-0011-0
[25] Rötzer N. and Schmidt M. Decreasing Metal Ore Grades—Is the Fear of Resource Depletion Justified? Resources, 2018, 7, 88; doi:10.3390/resources7040088
[26] Mohr, S. H., Evans, G. M. Combined generalized Hubbert-Bass model approach to include disruptions when predicting future oil production. Natural Resources, 2010, 1(1): 28-33.
[27] Hentschel, T., Hruschka, F., Priester, M. Artisanal and Small-Scale Mining. Challenges and Opportunities. IIED London, 2002, pp. 1-67.