Lack of BIM Training: Investigating Practical Solutions for the State of Kuwait
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Lack of BIM Training: Investigating Practical Solutions for the State of Kuwait

Authors: Noor M. Abdulfattah, Ahmed M. Khalafallah, Nabil A. Kartam

Abstract:

Despite the evident benefits of building information modeling (BIM) to the construction industry, it faces significant implementation challenges in the State of Kuwait. This study investigates the awareness of construction stakeholders of BIM implementation challenges, and identifies various solutions to overcome these challenges. Specifically, the main objectives of this study are to: (1) characterize the barriers that deter utilization of BIM, (2) examine the awareness of engineers, architects, and construction stakeholders of these barriers, and (3) identify practical solutions to facilitate BIM utilization. A questionnaire survey was designed to collect data on the aforementioned objectives from local companies and senior BIM experts. It was found that engineers are highly aware of BIM implementation barriers. In addition, it was concluded from the questionnaire that the biggest barrier is the lack of BIM training. Based on expert feedback, the study concluded with a number of recommendations on how to overcome the barriers of BIM utilization. This should prove useful to the construction industry stakeholders and can lead to significant changes to design and construction practices.

Keywords: Building information modeling, construction, challenges, information technology.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1131846

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2483

References:


[1] Wang, L., and Leite, F. (2014). Process-Oriented Approach of Teaching Building Information Modeling in Construction Management. J. Prof. Issues Eng. Educ. Pract. Journal of Professional Issues in Engineering Education and Practice,140(4), 04014004.
[2] Eastman, C. M., Teicholz, P., Sacks, R., and Liston, K. (2008). BIM handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors, Wiley, Hoboken, NJ, USA.
[3] Krygiel E., and Nies B. (2008). Green BIM: Successful Sustainable Design with Building Information Modeling. New York: Wiley Publishing. P25-51.
[4] Ahn, Y., Kwak, Y., and Suk, S. (2015). "Contractors’ Transformation Strategies for Adopting Building Information Modeling." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000390, 05015005.
[5] Jigsawcad Corporation. (2009). Building Information Modeling (BIM) and its Return on Investment. Available: http://www.jigsawcad.com/articles/october- 2008/building-information-modelling-(bim)-and-its-return-on-investment.aspx. (Accessed October 1, 2015).
[6] Hamm J. (2008). Transforming Construction Industry Performance through the application of revolutionary virtual design and construction technologies, and the essential role for education in this happen. Jenko Cad Education Consultancy: UK.Available: http://ctiweb.cf.ac.uk/news/events/beecon2006/pdf/P17_Jenny_Hamm.pdf.
[7] Leondes, C. T.. (2005). “Intelligent Knowledge-Based Systems: Business and Technology in the New Millennium.” USA: Kluwer Academic Publishers.
[8] Kymmell W. (2008). Building Information Modeling: Planning and construction managing construction projects with 4D CAD and Simulation. USA: McGraw- Hill Companies. P1-87.
[9] Howell I., Batcheler B. (2008). Building Information Modeling Two Years Later – Huge Potential, Some Success and Several Limitations. USA. Available: http://www.laiserin.com/features/bim/newforma_bim.pdf.
[10] Yan, H., Damian, P. (2008). “Benefits and Barriers of Building Information Modeling.” Department of Civil and Building Engineering, Loughborough University, UK.
[11] Quirk, V. (2012). A Brief History of BIM. Retrieved February 16, 2016, from http://www.archdaily.com/302490/a-brief-history-of-bim.
[12] Kia, S. (2013). Review of Building Information Modeling (BIM) Software Packages Based on Assets Management. In Introduction to Building Information Modeling (BIM) (pp. 101-139). Amirkabir University of Technology.
[13] Winch, G. (2002). “Managing Construction Projects: An Information Processing Approach.” Oxford: Blackwell Science.
[14] Kessinger, K. (2008). Recognizing the benefits of Building Information Modeling. Available:http://www.constructionsoftwarereview.com/blog/2008/09/05/recognizing-thebenefits-of-building-information-modeling. (Accessed September 6, 2015).
[15] McNell et al., 2009. Building Information Modeling. Retrieved from http://www.infocomm.org/cps/rde/xbcr/infocomm/Brochure_BIM.pdf.
[16] Productivity Benefits of BIM. (n.d.). Retrieved from http://www.mbie.govt.nz/about/whats-happening/news/document-image-library/nz-bim-productivity-benefits.pdf.
[17] Aranda-Mena, G., Crawford, J., Chevez, A., & Froese, T. (2009). Building information modeling demystified: does it make business sense to adopt BIM? International Journal on Managing Projects in business, 2(3), 419-434.
[18] Talebi, S. (n.d.). “Exploring Advantages and Challenges of Adaptation and Implementation of Bim in Project Life Cycle.” Retrieved from http://usir.salford.ac.uk/32275/3/S_Talebi_-_Exploring_Advantages_and_Challenges_of_Adaptation_and_Implementation_of_BIM_in_Project_Life_Cycle_(1).pdf.
[19] Karppinen, A., Törrönen, A., Lennox, M., Peltomäki, M., Lehto, M., Maalahti, J., et al. (2012). Common BIM Requirements 2012: Series 13: Use of models in construction. Retrieved from Building Smart Finland: http://www.en.buildingsmart.kotisivukone.com/3 (Accessed November 25, 2015).
[20] Koushki, P. A., Al-rashid, K. & Kartam, N. (2005) “Delays and cost increases in the construction of private residential projects in Kuwait.” Department of Civil Engineering, Kuwait University. Retrieved from http://www.tamu.edu/faculty/choudhury/articles/22.pdf.
[21] Mann, P. S., "Statistics for Business and Economics", John Wiley & Sons, Inc., 1995.