Comparing Repaired and Undamaged Specimens Test Results of Post-Tensioned Beam to Column Connections
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32804
Comparing Repaired and Undamaged Specimens Test Results of Post-Tensioned Beam to Column Connections

Authors: Mustafa Kaya

Abstract:

Since, it is essential to provide homeless people by the earthquake with safe, habitable accommodation repairing medium and slight levels of damage at the connection parts should be undertaken. In order to prove that a repaired connection was sufficiently strong, a precast beam to column post tensioned connection was tested in three phases. In phase one, the middle level damage was observed at 6% drift at these connections. As a result of the extra loads applied, little damage was observed. In the last phase, the four connections tested in the first phase were repaired using epoxy resin and then retested. The results from the tests on the repaired precast and the undamaged specimens showed that the repaired specimens were sufficiently strong, thus proving that repair to damaged precast beam to column post tensioned connections can be undertaken.

Keywords: Precast beam to column connection, momentresisting connection, post-tensioned connections, repair of precast connections.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1099652

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1788

References:


[1] Earthquake and Prefabrication. Prefabrication Conference, Istanbul; 2000.
[2] Blakeley, R.W.G. and, Park, R. Seismic Resistance of Pre-stressed Concrete Beam-Column Assemblies. ACI Journal 1971; 68(9):677-692 .
[3] Blakeley, R.W.G. and, Park, R. Pre-stressed Concrete Sections with Cyclic Flexure. Journal of the Structural Division Proceedings of the American Society of Civil Engineers 1973;99(8):1717-1742.
[4] Park, R. and, Thompson, K.J. Cyclic Load Tests On Pre-stressed Beam Column Joints. PCI Journal 1997; 22 (5):84-110.
[5] Priestly, M.J.N. and, Tao, J.R. Seismic Response of Pre-cast Pre-stressed Concrete Frames With Partially Debonded Tendons. PCI Journal 1997; 38(1):58-68.
[6] Priestly, M.J.N. and, MacRae, J.R. Seismic Tests of Pre-cast Beam-tocolumn Joint Subassemblages with Unbonded Tendons. PCI Journal 1996; 41(1):64-80.
[7] Cheok, G.S. and, Lew, H.S.Performance of Pre-cast Concrete Beam-to- Column Connections Subject to Cyclic Loading. PCI Journal 1991; 36(3): 56-67.
[8] Cheok, G.S. and, Lew, H.S. Model Pre-cast Concrete Beam-to-Column Connections Subject to Cyclic Loading. PCI Journal 1993; 38(4): 80-92.
[9] Cheok, G.S., Stanton, J.F., and Seagren D. Beam-to-column Connections for Pre-cast Concrete Moment Resisting Frames. Proceedings of the Fourth Joint Technical Coordinating Committee on Pre-cast Seismic Structural Systems 1994; 90-107.
[10] Cheok, G.S., Stone, W.C., and Kunnath S. K. Seismic Response of Precast Concrete Frames with Hybrid Connections. ACI Structural Journal 1998; 95(5):527-539.
[11] Stone, W.C., Cheok, G.S. and Stanton, J.F. Performance of Hybrid Moment-Resisting Pre-cast Beam-Column Concrete Connections Subjected to Cyclic Loading. ACI Journal1995; 92(2):229-249.
[12] Stone, W.C., Cheok, G.S., and Stanton, J.F. A Hybrid Reinforced Precast Frame for Seismic Regions. PCI Journal 1997; 42(2):20-32.
[13] Priestly, M.J.N. The PRESS Program-Current Status and Proposed Plans for Phase III. PCI Journal 1996; 41(2):22-40.
[14] Palmieri, L., Sagan, E., French, C., and Kreger, M. Ductile Connections For Pre-cast Concrete Frame Systems. ACI Journal 1997;162(13):313- 355 .
[15] Nakaki, A.D., Stanton, J.F., and Sritharon, S. An Overview of the PRESSS Five-Story Pre-cast Test Building. PCI Journal 1999; 44(2):26- 39.
[16] Priestly, M.J.N., Sritharon, S., Conley, J.R., and Pampanin, S. Preliminary Results and Conclusions from the PRESSS Five-Story Precast Test Building. PCI Journal 1999; 44(6):42-67.
[17] Kaya, M. Performance Analysis of Post-tensioning Beam to Column Connections Under Cycling Loading in Prefabric Structures. Ph.D Thesis, Gazi University, Ankara; 2007.
[18] Kaya M., Arslan A., Analytical Modeling Of Post-Tensioned Precast Beam To Column Connections, Materials & Design, Materials & Design 2009, 30(2009): 3802-3811.
[19] Kaya M., Arslan A., The Effect of The Diameter of Pre-stressed Strands Providing the Post-Tensioned Beam-to-Column Connections, Materials & Design 2009, 30(7): 2604-2617.
[20] Kaya M., Arslan A., Effect of Stress Levels Applied to Pre-Stressed Strands on Post-Tensioned Beam-to-Column Connections. The Structural Design of Tall And Special Buildings 2012, 21(9), 682-698.
[21] Kaya M., Arslan A., Repair of The Damaged Post Tensioned Precast Beam to Column Connections. The Structural Design of Tall And Special Buildings 2012, 21(11), 844-854.
[22] http://www.sika.com.tr/pdf/products/1209451891_tr.pdf