Improving Automotive Efficiency through Lean Management Tools: A Case Study
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32807
Improving Automotive Efficiency through Lean Management Tools: A Case Study

Authors: Raed EL-Khalil, Hussein Zeaiter

Abstract:

Managing and improving efficiency in the current highly competitive global automotive industry demands that those companies adopt leaner and more flexible systems. During the past 20 years the domestic automotive industry in North America has been focusing on establishing new management strategies in order to meet market demands. The lean management process also known as Toyota Manufacturing Process (TPS) or lean manufacturing encompasses tools and techniques that were established in order to provide the best quality product with the fastest lead time at the lowest cost. The following paper presents a study that focused on improving labor efficiency at one of the Big Three (Ford, GM, Chrysler LLC) domestic automotive facility in North America. The objective of the study was to utilize several lean management tools in order to optimize the efficiency and utilization levels at the “Pre- Marriage” chassis area in a truck manufacturing and assembly facility. Utilizing three different lean tools (i.e. Standardization of work, 7 Wastes, and 5S) this research was able to improve efficiency by 51%, utilization by 246%, and reduce operations by 14%. The return on investment calculated based on the improvements made was 284%.

Keywords: Lean Manufacturing, Standardized Work, Operation Efficiency and Utilization, Operations Management.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1099316

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5413

References:


[1] The Wall Street Journal, “Auto Sales”, Retrieved from http://online.wsj.com/mdc/public/page/2_3022- autosales.html#autosalesD. 2012.
[2] J. P. Womack, J. Daniel, and D. Roos, The machine that changed the world, New York: Rawson Associates, 1990.
[3] AlixPartner, “Lingering Low Employment Nationally, Demographic Shifts, Potential Contagion from Europe Present Big Challenges to the Auto Industry”, Retrieved from http://www.alixpartners.com, 2012.
[4] R. EL-Khalil, K. Taraman, and S. Taraman, “Body shop flexibility: Impact of framing system on overall performance”, Asian International Journal of Science and Technology, Vol. 3 No. 2, pp. 110-128, 2010.
[5] R. EL-Khalil, “Simulation Analysis for managing and improving productivity: a case study of an automotive company”, Journal of Manufacturing Technology Management, Vol. 26 No. 1, pp. 112-135, 2015.
[6] J. Liker, The Toyota way: 14 management principles from the world’s greatest manufacturer, New York: McGraw Hill, 2004.
[7] Matsui. Y, “An empirical analysis of just-in-time production in Japanese manufacturing companies”, International Journal of Production Economics, Vol. 108 No. 1, pp. 153–164, 2007.
[8] McKinsey and Company, Lean Implementation at the US automotive companies, Retrieved from http://www.mckinsey.com/insights, 2014.
[9] C. Chen, A.L. Bergenwall, and R.E. White, “TPS’s process design in American automotive plants and its effects on the triple bottom line and sustainability”, International Journal of Production Economics, Vol. 140 No. 2, pp. 374-384, 2012.
[10] S. Bhasin, and P. Burcher, “Lean viewed as a philosophy”, Journal of Manufacturing and technology management, Vol. 17 No.1, pp. 56-72, 2006.
[11] J. Cabadas, J. River Rouge: Ford's Industrial Colossus, Motor Books International, St Paul, MN, 2004.
[12] R. EL-Khalil, and M. Farah, “Lean Management adoption level in Middle Eastern Manufacturing Facilities”, The Business Review, Cambridge, Vol. 2, No 2, pp 158-167, 2013.
[13] R. EL-Khalil, “Managing and Improving Robot Spot Welding Efficiency: A benchmarking Study”, Benchmarking: An International Journal, Vol. 21, No. 3, pp 344-363, 2014.
[14] D. Mehri, “The darker side of lean: an insider’s perspective on the realities of the Toyota production system”, Academy of Management Perspectives, Vol. 20 No. 2, pp. 21–42, 2006.
[15] K. Newsome, “The women can be moved to fill in the gaps: new production concepts, gender and suppliers”, Gender, Work, & Organization, Vol. 10 No. 3, pp. 320–341, 2003.
[16] M. Hughes, “A true rap for work measurement”. Industrial Engineer, Vol. 44 No. 10, pp. 213-226, 2012.
[17] R. El-Khalil, “Auto zone: Pour on the efficiency by applying work study analysis to car production”, Industrial Engineer Journal, Vol. 43 No. 11, pp. 30-34, 2011.
[18] H. Wittenber, “Kaizen the many ways of getting better”, Assembly Autonomation, Vol. 14 No. 4, pp. 12-17, 1994.
[19] T. Whitmore, “Standardized work: Document your process and make problems visible”, Manufacturing Engineering, Vol. 140 No. 5, pp. 171- 179, 2008.
[20] B. Münstermann, A. Eckhardt, and T. Weitzel, “The performance impact of business process standardization: An empirical evaluation of the recruitment process”, Business Process Management Journal, Vol. 16 No.1, pp 29- 56, 2010.
[21] K. Wuellenweber, D. Beimborn, T. Weitzel, and W. Koenig, “The impact of process standardization on business process outsourcing success”, Information Systems Frontiers, Vol. 10 No. 2, pp. 211-24, 2008.
[22] S. Vinodh, “Standardized work for noncyclical processes”, International Journal of Production Research, Vol. 49 No. 21, pp. 6589-6590, 2011.
[23] J.K. Liker, “Becoming lean: Inside stories of U.S. manufacturers”, Oregon: Productivity Press, 1998.
[24] M. Kocakulah, J. Brown, and T. Joshua, “Lean Manufacturing principles and their Application”, Cost Management Magazine. Vol. 22 No. 3, pp. 112-138, 2008.
[25] L. Wilson, “How to implement lean manufacturing”, New York, NY: McGraw-Hill, 2010.
[26] J.A. Farris, E.M. van Aken, T.L. Doolen, and J. Worley, “Critical success factors for human resource outcomes in Kaizen events: an empirical study”, International Journal of Production Econ.omics, Vol. 117 No. 2, pp. 42-65, 2009.
[27] W.M. Feld, How to implement lean manufacturing tools, techniques, and how to use them, Boca Raton: St Lucie Press, 2010.