Wind Energy Status in Turkey
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Wind Energy Status in Turkey

Authors: Mustafa Engin Başoğlu, Bekir Çakir

Abstract:

Since large part of electricity is generated by using fossil based resources, energy is an important agenda for countries. In this context, renewable energy sources are alternative to conventional sources due to the depletion of fossil resources, increasing awareness of climate change and global warming concerns. Solar, wind and hydropower energy are the main renewable energy sources. Among of them, since installed capacity of wind power has increased approximately eight times between 2008 - November of 2014, wind energy is a promising source for Turkey. Furthermore, signing of Kyoto Protocol can be accepted as a milestone for Turkey's energy policy. Turkish Government has announced Vision 2023 (energy targets by 2023) in 2010-2014 Strategic Plan prepared by Ministry of Energy and Natural Resources (MENR). Energy targets in this plan can be summarized as follows: Share of renewable energy sources in electricity generation is 30% of total electricity generation by 2023. Installed capacity of wind energy will be 20 GW by 2023. Other renewable energy sources such as solar, hydropower and geothermal are encouraged with new incentive mechanisms. Dependence on foreign energy is reduced for sustainability and energy security. On the other hand, since Turkey is surrounded by three coastal areas, wind energy potential is convenient for wind power application. As of November of 2014, total installed capacity of wind power plants is 3.51 GW and a lot of wind power plants are under construction with capacity 1.16 GW. Turkish government also encourages the locally manufactured equipments. In this context, one of the projects funded by private sector, universities and TUBİTAK names as MILRES is an important project aimed to promote the use wind energy in electricity generation. Within this project, wind turbine with 500 kW power has been produced and will be installed at the beginning of the 2015. After that, by using the experience obtained from the first phase of the project, a wind turbine with 2.5 MW power will be manufactured in an industrial scale.

Keywords: Wind energy, wind speed, Vision 2023, MILRES (national wind energy system), wind energy potential, Turkey.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1098019

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3275

References:


[1] C. İlkiliç, İ. Türkbay, “Determination and utilization of wind energy potential for Turkey,” Renewable and Sustainable Energy Reviews., vol. 14, 2010, pp. 2202-2207.
[2] B. Yaniktepe, M.M. Savrun, T. Koroglu, “Current status of wind energy and wind energy policy in Turkey,” Energy Conversion and Management, vol. 72, 2013, pp. 103-110.
[3] TEIAS, Turkish Electricity Transmission Company.
[4] M. Melikoğlu, “Vision 2023: Feasibility analysis of Turkey’s renewable energy projection,” Renewable Energy, vol. 50, 2013, pp. 570-575.
[5] 2010-2014 National Strategic Plan, Ministry of Energy and Natural Resources (MENR).
[6] Renewable Energy&Sustainable Environmental Technologies, Repuclic of Turkey Prime Ministry Investment Support and Promotion Agency, http://www.invest.gov.tr(Available: 22.07.2014).
[7] TEIAS,http://www.teias.gov.tr/ElektrikUretimPlani.aspx (Available: 22.07.2014).
[8] C. İlkiliç, “Wind energy and assessment of wind energy potential in Turkey,” Renewable and Sustainable Energy Reviews., vol. 16, 2012, pp. 1165-1173.
[9] Turkish Wind Energy Statistics Report, July 2014, Turkish Wind Energy Association, http://www.tureb.com.tr (Available: 5.8.2014)
[10] Renewables 2014 Global Status Report, , http://www.ren21.net/ren21activities/globalstatusreport.aspx
[11] H. Benli, “Potential of renewable energy in electrical energy production and sustainable energy development of Turkey: Performance and policies,” Renewable Energy, vol. 50, 2013, pp. 33-46.
[12] M. Çapik, A.O. Yılmaz, İ. Çavuşoğlu, “Present situation and potential role of renewable energy in Turkey,” Renewable Energy, vol. 46, 2012, pp. 1-13.
[13] Ş. N. Engin, “TUBİTAK Marmara Araştırma Merkez Enerji Enstitüsü Rüzgar Enerjisi Çalışma Alanları ve MILRES Projesi, ” İzmir Rüzgar Sempozyumu ve Sergisi, İzmir, 23-24 December 2011.
[14] M. Ay, “Support Program for Research and Development Projects of Public Institutions (1007 Program) and National wind energy systems development project (MILRES), ” TUBİTAK, November 2014.
[15] H. A. Şimşek, N. Şimşek, “Recent incentives for renewable energy in Turkey,” Energy Policy, vol. 63, 2013, pp. 521-530.