Reliability of Intra-Logistics Systems – Simulating Performance Availability
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Reliability of Intra-Logistics Systems – Simulating Performance Availability

Authors: Steffen Schieweck, Johannes Dregger, Sascha Kaczmarek, Michael ten Hompel

Abstract:

Logistics distributors face the issue of having to provide increasing service levels while being forced to reduce costs at the same time. Same-day delivery, quick order processing and rapidly growing ranges of articles are only some of the prevailing challenges. One key aspect of the performance of an intra-logistics system is how often and in which amplitude congestions and dysfunctions affect the processing operations. By gaining knowledge of the so called ‘performance availability’ of such a system during the planning stage, oversizing and wasting can be reduced whereas planning transparency is increased. State of the art for the determination of this KPI is simulation studies. However, their structure and therefore their results may vary unforeseeably. This article proposes a concept for the establishment of ‘certified’ and hence reliable and comparable simulation models.

Keywords: Intra-logistics, performance availability, simulation, warehousing.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1337932

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2412

References:


[1] M. ten Hompel; T. Schmidt; L. Nagel, Materialflusssysteme: Förderund Lagertechnik (VDI-Book). New York: Springer-Verlag, 2007, pp. 3- 4
[2] M. ten Hompel, V. Heidenblut, Taschenlexikon Logistik (VDI-Book). New York: Springer-Verlag, 2006, p. 134
[3] Availability of transport and storage systems including subsystems and elements, VDI-guideline 3581, 2004.
[4] Anwendung der Verfügbarkeitsrechnung für Förder- und Lagersysteme, VDI-guideline 3649, 1992.
[5] E. N. Jung, M. ten Hompel, „Analytische Stauprognose in Stetigfördersystemen im Rahmen der Systemplanung,“ Logistics Journal: Proceedings, vol. 09, no.1, 2013.
[6] M. Maier, “Prognose der Leistungsverfügbarkeit während der Planung,“ Logistics Journal: Proceedings, vol. 06, no.1, 2010.
[7] Reliability for intralogistics – Performance availability, VDI-guideline 4486, 2012.
[8] A.-K. Wittenstein, Bedarfssynchrone Leistungsverfügbarkeit in der kundenspezifischen Produktentwicklung, Dissertation, Stuttgart University, 2007, pp. 33-35
[9] M. Maier, Praxisgerechte Abnahmeprozeduren für intralogistische Systeme unter Berücksichtigung der Zuverlässigkeits-und Verfügbarkeitstheorie. Dissertation, Tübingen University, 2012
[10] R. Conway, W. L. Maxwell; L. W. Miller, Theory of scheduling, Reading, Mass: Addison-Wesley, 1967, ch. 11, pp. 229-239.
[11] T. C. E. Cheng and M. C. Gupta, “Survey of scheduling research involving due date determination decisions,” European Journal of Operational Research, vol. 28, no. 2, pp. 156-166, 1989.
[12] V. Gordon, J.-M. Proth, C. Chu, “A survey of the state-of-the-art of common due date assignment and scheduling research,” European Journal of Operational Research, vol. 139, no. 1, pp. 1-25, 2002.
[13] A. Baykasoglu, M. Göcken, Z. D. Unutmaz, „New approaches to due date assignment in job shops,“ European Journal of Operational Research, vol. 187, no. 1, pp. 31-45, 2008.
[14] V. Vinod, R. Sridharan, “Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system,” International Journal of Production Economics, vol. 129, no.1, pp. 127-146, 2011.
[15] T. C. E. Cheng, “An algorithm for the CON due-date determination and sequencing problem,” Computers & Operations Research, vol. 14, no. 6, pp. 537-542, 1987.