Search results for: public sector projects.
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2148

Search results for: public sector projects.

2148 Analysis on the Decision-Making Model of Private Sector Companies in PPP Projects

Authors: Xueqin Shan, Chuanming Wu, Wenhua Hou, Xiaosu Ye

Abstract:

Successful public-private-partnership (PPP) implementation can not be achieved without the active participation of private sector companies. This paper examines the decision-making of private sector companies in public works delivered by the PPP model on the basis of social responsibility theory. It proposes that private sector companies should indentify objectives of entering into PPP projects, and shoulder relevant social responsibilities, while a minimum return should also be guaranteed in their favor, so as to compensate for their assumed risk and support them to take on responsibilities in the future. The paper also gives a calculation regarding the appropriate scale and reasonable degree of private sector involvement in PPP projects through the cost-benefit analysis in a specific case study, with the purpose to guide the private sector companies to create a cooperation environment resembling “symbiosis" and facilitate the smooth implementation of public works delivered by the PPP model.

Keywords: Social Responsibility Theory, Cost-benefit Analysis, PPP Projects, Private Sector Companies, Decision-making Modell

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1486
2147 Public-Private Partnership Projects in Canada: A Case Study Approach

Authors: Samuel Carpintero

Abstract:

Public-private partnerships (PPP) arrangements have been extensively used in Canada, where the participation of private companies in financing and managing infrastructure projects has increased significantly in the last decade, particularly in the transportation sector. This paper analyses the evolution of the PPP market for transportation projects in Canada and examines the participation of Spanish developers in this market, which have been particularly successful in winning PPP contracts during the last decade.

Keywords: PPP, concession, infrastructure, construction.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2583
2146 Key Issues in Transfer Stage of BOT Project: Experience from China

Authors: Wang Liguang, Zhang Xueqing

Abstract:

The build-operate-transfer (BOT) project delivery system has provided effective routes to mobilize private sector funds, innovative technologies, management skills and operational efficiencies for public infrastructure development and have been widely used in China during the last 20 years. Many BOT projects in China will be smoothly transferred to the government soon and the transfer stage, which is considered as the last stage, must be studied carefully and handled well to achieve the overall success of BOT projects. There will be many issues faced by both the public sector and private sector in the transfer stage of BOT projects, including project post-assessment, technology and documents transfer, personal training and staff transition, etc. and sometimes additional legislation is needed for future operation and management of facilities. However, most previous studies focused on the bidding, financing, and building and operation stages instead of transfer stage. This research identifies nine key issues in the transfer stage of BOT projects through a comprehensive study on three cases in China, and the expert interview and expert discussion meetings are held to validate the key issues and give detail analysis. A proposed framework of transfer management is prepared based on the experiences derived and lessons drawn from the case studies and expert interview and discussions, which is expected to improve the transfer management of BOT projects in practice.

Keywords: BOT project, key issues, transfer management transfer stage.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 988
2145 Public Private Partnership for Infrastructure Projects: Mapping the Key Risks

Authors: Julinda Keçi

Abstract:

In many countries, governments have been promoting the involvement of private sector entities to enter into long-term agreements for the development and delivery of large infrastructure projects, with a focus on overcoming the limitations upon public fund of the traditional approach. The involvement of private sector through public private partnerships (PPP) brings in new capital investments, value for money and additional risks to handle. Worldwide research studies have shown that an objective, systematic, reliable and useroriented risk assessment process and an optimal allocation mechanism among different stakeholders is crucial to the successful completion. In this framework, this paper, which is the first stage of a research study, aims to identify the main risks for the delivery of PPP projects. A review of cross-countries research projects and case studies was performed to map the key risks affecting PPP infrastructure delivery. The matrix of mapping offers a summary of the frequency of factors, clustered in eleven categories: construction, design, economic, legal, market, natural, operation, political, project finance, project selection and relationship. Results will highlight the most critical risk factors, and will hopefully assist the project managers in directing the managerial attention in the further stages of risk allocation.

Keywords: Construction, infrastructure, public private partnerships, risks.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3471
2144 Adoptability Issues of GPS in Public Sector in Pakistan

Authors: Asim Tanvir, Numera Rafaqat

Abstract:

This study discusses the stumbling blocks stifling the adoption of GPS technology in the public sector of Pakistan. This study has been carried out in order to describe the value of GPS technology and its adoption at various public sector organisations in Pakistan. Sample size for the research conducted was 200; personnel working in public sector having age above 29 years were surveyed. Data collected for this research has been quantitatively analysed with the help of SPSS. Regression analysis, correlation and cross tabulation were the techniques used to determine the strength of relationship between key variables. Findings of this research indicate that main hurdles in GPS adoption in the public sector of Pakistan are lack of awareness about GPS among masses in general and the stakeholders in particular, lack of initiative on part of government in promoting new technologies, unavailability of GPS infrastructure in Pakistan and prohibitions on map availability because of security reasons.

Keywords: Adoptability issues, Growth of GPS, GPSinfrastructure, Public sectors in Pakistan

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1702
2143 Procurement for Management Services in Delivery of Public Construction Projects in Poland

Authors: A. Leśniak, E. Plebankiewicz, K. Zima

Abstract:

Construction projects can be implemented under various contractual and organizational systems. They can be divided into two groups: systems without the managing company where the Client manages the process, and systems with the managing company, where management is entrusted to an external company. In the public sector of the Polish market there are two ways of delivery of construction projects with the participation of the manager: one is to assign operations to another party, the so called Project Supervisor, whilst the other results from the application of FIDIC conditions of contract, which entail appointment of the Engineer. The decision is to be made by the Client and depends on various factors. On the public procurement market in Poland the selection of construction project manager boils down to awarding the contract for such a service. The selection can be done by one of eight public procurement procedures identified by the procurement law. The paper provides the analysis of 96 contracts for services awarded in 2011, which employed construction management. The study aimed to investigate the methods and criteria for selecting managers, applied in practice by the Polish public Clients.

Keywords: construction management, construction services, methods and criteria of tender selection, public procurement

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1730
2142 Trust and Reliability for Public Sector Data

Authors: Klaus Stranacher, Vesna Krnjic, Thomas Zefferer

Abstract:

The public sector holds large amounts of data of various areas such as social affairs, economy, or tourism. Various initiatives such as Open Government Data or the EU Directive on public sector information aim to make these data available for public and private service providers. Requirements for the provision of public sector data are defined by legal and organizational frameworks. Surprisingly, the defined requirements hardly cover security aspects such as integrity or authenticity. In this paper we discuss the importance of these missing requirements and present a concept to assure the integrity and authenticity of provided data based on electronic signatures. We show that our concept is perfectly suitable for the provisioning of unaltered data. We also show that our concept can also be extended to data that needs to be anonymized before provisioning by incorporating redactable signatures. Our proposed concept enhances trust and reliability of provided public sector data.

Keywords: Trusted Public Sector Data, Integrity, Authenticity, Reliability, Redactable Signatures.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1721
2141 Attributes of Ethical Leadership and Ethical Guidelines in Malaysian Public Sector

Authors: M. Norazamina, A. Azizah, Y. Najihah Marha, A. Suraya

Abstract:

Malaysian Public Sector departments or agencies are responsible to provide efficient public services with zero corruption. However, corruption continues to occur due to the absence of ethical leadership and well-execution of ethical guidelines. Thus, the objective of this paper is to explore the attributes of ethical leadership and ethical guidelines. This study employs a qualitative research by analyzing data from interviews with key informers of public sector using conceptual content analysis (NVivo11). The study reveals eight attributes of ethical leadership which are role model, attachment, ethical support, knowledgeable, discipline, leaders’ spirituality encouragement, virtue values and shared values. Meanwhile, five attributes (guidelines, communication, check and balance, concern on stakeholders and compliance) of ethical guidelines are identified. These identified attributes should become the ethical identity and ethical direction of Malaysian Public Sector. This could enhance the public trust as well as the international community trust towards the public sector.

Keywords: Check and balance, ethical guidelines, ethical leadership, public sector, spirituality encouragement .

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1582
2140 A Model for Application of Knowledge Management in Public Organizations in Iran

Authors: Salavati, Adel, Ebadi Shaghayegh

Abstract:

This study examines knowledge management in the public organizations in Iran. The purpose of this article is to provide a conceptual framework for application of knowledge management in public organizations. The study indicates that an increasing tendency for implementation of knowledge management in organizations is emerging. Nonetheless knowledge management in public organizations is toddler and little has been done to bring the subject to use in the public sector. The globalization of change and popularization of some values like participation, citizen-orientation and knowledge-orientation in the new theories of public administration requires that the knowledge management is considered and attend to in the public sector. This study holds that a knowledge management framework for public organizations is different from this in the public sector, because public sector is stakeholder-dependent while the private is shareholder-dependent. Based on the research, we provide a conceptual model. The model proposed involves three factors: Organizational, knowledge citizens and contextual factors. The study results indicate these factors affect on knowledge management in public organizations in Iran.

Keywords: Knowledge management, public organizations in Iran, model of knowledge management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2047
2139 Risks and Mitigation Measures in Build-Operate-Transfer Projects

Authors: Syed Kamarul Bakri Syed Ahmad Bokharey, Kalaikumar Vallyutham, Narayanan Sambu Potty, Nabilah Abu Bakar

Abstract:

Infrastructure investments are important in developing countries, it will not only help to foster the economic growth of a nation, but it will also act as a platform in which new forms of partnership and collaboration can be developed mainly in East Asian countries. Since the last two decades, many infrastructure projects had been completed through build-operate-transfer (BOT) type of procurement. The developments of BOT have attracted participation of local and foreign private sector investor to secure funding and to deliver projects on time, within the budget and to the required specifications. Private sectors are preferred by the government in East Asia to participate in BOT projects due to lack of public funding. The finding has resulted that the private sector or promoter of the BOT projects is exposed to multiple risks which have been discussed in this paper. Effective risk management methods and good managerial skills are required in ensuring the success of the project. The review indicated that mitigation measures should be employed by the promoter throughout the concession period and support from the host government is also required in ensuring the success of the BOT project.

Keywords: BOT project, risks management, concessionaire, consortium.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 8144
2138 Implementation of Building Information Modeling in Turkish Government Sector Projects

Authors: Mohammad Lemar Zalmai, Mustafa Nabi Kocakaya, Cemil Akcay, Ekrem Manisali

Abstract:

In recent years, the Building Information Modeling (BIM) approach has been developed expeditiously. As people see the benefits of this approach, it has begun to be used widely in construction projects and some countries made it mandatory to get more benefits from it. To promote the implementation of BIM in construction projects, it will be helpful to get some relevant information from surveys and interviews. The purpose of this study is to research the current adoption and implementation of BIM in public projects in Turkey. This study specified the challenges of BIM implementation in Turkey and proposed some solutions to overcome them. In this context, the challenges for BIM implementation and the factors that affect the BIM usage are determined based on previous academic researches and expert opinions by conducting interviews and questionnaire surveys. Several methods are used to process information in order to obtain weights of different factors to make BIM widespread in Turkey. This study concluded interviews' and questionnaire surveys' outcomes and proposed some suggestions to promote the implementation of BIM in Turkey. We believe research findings will be a good reference for boosting BIM implementation in Turkey.

Keywords: Building Information Modeling, BIM, BIM implementations, Turkish construction industry, Turkish government sector projects.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 737
2137 Risk Allocation in Public-Private Partnership (PPP) Projects for Wastewater Treatment Plants

Authors: Samuel Capintero, Ole H. Petersen

Abstract:

This paper examines the utilization of public-private partnerships for the building and operation of wastewater treatment plants. Our research focuses on risk allocation in this kind of projects. Our analysis builds on more than hundred wastewater treatment plants built and operated through PPP projects in Aragon (Spain). The paper illustrates the consequences of an inadequate management of construction risk and an unsuitable transfer of demand risk in wastewater treatment plants. It also shows that the involvement of many public bodies at local, regional and national level further increases the complexity of this kind of projects and make time delays more likely.

Keywords: Wastewater, treatment plants, PPP, construction.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2226
2136 A Study of the Costs and Benefits of Smart City Projects Including the Scenario of Public-Private Partnerships

Authors: Patrick T. I. Lam, Wenjing Yang

Abstract:

A smart city project embraces benefits and costs which can be classified under direct and indirect categories. Externalities come into the picture, but they are often difficult to quantify. Despite this barrier, policy makers need to carry out cost-benefit analysis to justify the huge investments needed to make a city smart. The recent trend is towards the engagement of the private sector to utilize their resources and expertise, especially in the Information and Communication Technology (ICT) areas, where innovations blossom. This study focuses on the identification of costs (on a life cycle basis) and benefits associated with smart city project developments based on a comprehensive literature review and case studies, where public-private partnerships would warrant consideration, the related costs and benefits are highlighted. The findings will be useful for policy makers of cities.

Keywords: Costs and benefits, identification, public-private partnerships, smart city projects.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1639
2135 Barriers of Productivity in Public Sector Automotive Manufacturing Industry of Pakistan

Authors: S. Z. Sarwar, N. Ehsan , I, Mirza, J. L. Piracha, M. Azeem, A. Ishaque

Abstract:

The public sector losses are the major cause of stagnant growth of Pakistan. Public sector automotive manufacturing industry is one of the major contributors of these losses. This research has been carried out in order to identify the major barriers of productivity of this industry and suggest measures for improvement. This qualitative and quantitative research consisted of informal interviews, discussions augmented by closed ended questionnaire. Three major manufacturing units were chosen for this research and responses from 103 employees were collected. It was found out in this research that numerous productivity flaws exist in the system which requires immediate attention. Besides highlighting flaws this research also suggests corrective actions and areas for future research to overcome these problems.

Keywords: Automotive manufacturing industry, barriers ofproductivity, Public sector losses.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1831
2134 Crowdfunding for Saudi Arabia Green Projects

Authors: Saleh Komies, Mona Alharbi, Razan Alhayyani, Mozah Almulhim, Roseanne Khawaja, Ahmed Alradhi

Abstract:

One of the proposed solutions that face some challenges is encouraging sustainable energy consumption across Saudi Arabia through crowdfunding platforms. To address these challenges, we need to determine the level of awareness of crowdfunding and green projects, as well as the preferences and willingness of Saudis to utilize crowdfunding as an alternative funding source for green projects in Saudi Arabia. In this study, we aim to determine the influence of environmental awareness and concern on the propensity to crowdfund green projects. The survey is being conducted as part of environmental initiatives to assess public perceptions and opinions on crowdfunding green projects in Saudi Arabia. A total of 450 responses to an online questionnaire distributed via convenience and snowball sampling were utilized for data analysis. The survey reveals that Saudis have a low understanding of crowdfunding concepts and a relatively high understanding of implementing green projects. The public is interested in crowdfunding green projects if there is a return on investment.

Keywords: Crowdfunding, green projects, renewable energy, Saudi Arabia, solar farms, wind resources.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 170
2133 Assessment of Investment Programs in Agriculture in Georgia

Authors: M. Chavleishvili

Abstract:

The paper presents the analysis of the current situation of agricultural development in Georgia. The investment environment that supports development of the agricultural sector is evaluated and the key priorities are identified. The analysis of the projects already implemented with state and EU support, as well as those that are being currently implemented is presented. The policy and the programs supporting development of agricultural sector are analyzed. Based on an analysis of the evaluations of experts and the primary accounting documents, the outcomes of investment programs, their advantages and disadvantages, are studied. Through identifying investment programs in the agricultural sector of Georgia, corresponding conclusions are made, based on which some recommendations are developed.

Keywords: Agriculture, investments, investment programs, projects.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1367
2132 Mega Projects and Governmentality

Authors: Sophie Sturup

Abstract:

Mega urban transport projects (MUTPs) are increasingly being used in urban environments to ameliorate the problem of congestion. However, a number of problems with regard to mega projects have been identified. In particular the seemingly institutionalised over estimation of economic benefits and persistent cost over runs, could mean that the wrong projects are selected, and that the projects that are selected cost more than they should. Studies to date have produced a number of solutions to these problems, perhaps most notably, the various methods for the inclusion of the private sector in project provision. However the problems have shown significant intractability in the face of these solutions. This paper provides a detailed examination of some of the problems facing mega projects and then examines Foucault-s theory of 'governmentality' as a possible frame of analysis which might shed light on the intractability of the problems that have been identified, through an identification of the art of government in which MUTPs occur.

Keywords: Michel Foucault, Governmentality, Mega projects, Transport.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2424
2131 Fundamentals of Performance Management in the World of Public Service Organisations

Authors: Daniella Kucsma

Abstract:

The examination of the Public Service Organization’s performance evaluation includes several steps that help public organizations to develop a more efficient system. Public sector organizations have different characteristics than the competitive sector, so it can be stated that other/new elements become more important in their performance processes. The literature in this area is diverse, so highlighting an indicator system can be useful for introducing a system, but it is also worthwhile to measure the specific elements of the organization. In the case of a public service organization, due to the service obligation, it is usually possible to talk about a high number of users, so compliance is more difficult. For the organization, it is an important target to place great emphasis on the increase of service standards and the development of related processes. In this research, the health sector is given a prominent role, as it is a sensitive area where both organizational and individual performance is important for all participants. As a primary step, the content of the strategy is decisive, as this is important for the efficient structure of the process. When designing any system, it is important to review the expectations of the stakeholders, as this is primary when considering the design. The goal of this paper is to build the foundations of a performance management and indexing framework that can help a hospital to provide effective feedback and a direction that is important in assessing and developing a service and can become a management philosophy.

Keywords: health sector, public sector, performance management, strategy

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 462
2130 Public-Private Partnership Transportation Projects: An Exploratory Study

Authors: Medya Fathi

Abstract:

When public transportation projects were delivered through design-bid-build and later design-build, governments found a serious issue: inadequate funding. With population growth, governments began to develop new arrangements in which the private sectors were involved to cut the financial burden. This arrangement, Public-Private Partnership (PPP), has its own risks; however, performance outputs can motivate or discourage its use. On top of such output are time and budget, which can be affected by the type of project delivery methods. Project completion within or ahead of schedule as well as within or under budget is among any owner’s objectives. With a higher application of PPP in the highway industry in the US and insufficient research, the current study addresses the schedule and cost performance of PPP highway projects and determines which one outperforms the other. To meet this objective, after collecting performance data of all PPP projects, schedule growth and cost growth are calculated, and finally, statistical analysis is conducted to evaluate the PPP performance. The results show that PPP highway projects on average have saved time and cost; however, the main benefit is a faster delivery rather than an under-budget completion. This study can provide better insights to understand PPP highways’ performance and assist practitioners in applying PPP for transportation projects with the opportunity to save time and cost.

Keywords: Cost, delivery method, highway, public-private partnership, schedule, transportation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 389
2129 Public Economic Efficiency and Case-Based Reasoning: A Theoretical Framework to Police Performance

Authors: Javier Parra-Domínguez, Juan Manuel Corchado

Abstract:

At present, public efficiency is a concept that intends to maximize return on public investment focus on minimizing the use of resources and maximizing the outputs. The concept takes into account statistical criteria drawn up according to techniques such as DEA (Data Envelopment Analysis). The purpose of the current work is to consider, more precisely, the theoretical application of CBR (Case-Based Reasoning) from economics and computer science, as a preliminary step to improving the efficiency of law enforcement agencies (public sector). With the aim of increasing the efficiency of the public sector, we have entered into a phase whose main objective is the implementation of new technologies. Our main conclusion is that the application of computer techniques, such as CBR, has become key to the efficiency of the public sector, which continues to require economic valuation based on methodologies such as DEA. As a theoretical result and conclusion, the incorporation of CBR systems will reduce the number of inputs and increase, theoretically, the number of outputs generated based on previous computer knowledge.

Keywords: Case-based reasoning, knowledge, police, public efficiency.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 549
2128 Enhancement of Accountability within the South African Public Sector: Knowledge Gained from the Case of a National Commissioner of the South African Police Service

Authors: Yasmin Nanabhay

Abstract:

The paper scrutinizes the literature on accountability and non-accountability, and then presents an analysis of a South African case which demonstrated consequences of a lack of accountability. Ethical conduct displayed by members of the public sector is integral to creating a sustainable democratic government, which upholds the constitutional tenets of accountability, transparency and professional ethicality. Furthermore, a true constitutional democracy emphasises and advocates the notion of service leadership that nurtures public participation and engages with citizens in a positive manner. Ethical conduct and accountability in the public sector earns public trust; hence these are key principles in good governance. Yet, in the years since the advent of democracy in South Africa, the government has been plagued by rampant corruption and mal-administration by public officials and politicians in leadership positions. The control measures passed by government in an attempt to ensure ethicality and accountability within the public sector include codes of ethics, rules of conduct and the enactment of legislation. These are intended to shape the mindset of members of the public sector, with the ultimate aim of an efficient, effective, ethical, responsive and accountable public service. The purpose of the paper is to analyse control systems and accountability within the public sector and to present reasons for non-accountability by means of a selected case study. The selected case study is the corruption trial of Jackie Selebi, who served as National Commissioner of the South African Police Service but was dismissed from the post. The reasons for non-accountability in the public sector as well as recommendations based on the findings to enhance accountability will be undertaken. The case study demonstrates the experience and impact of corruption and/or mal-administration, as a result of a lack of accountability, which has contributed to the increasing loss of confidence in political leadership in the country as elsewhere in the world. The literature is applied to the erstwhile National Commissioner of the South African Police Service and President of Interpol, as a case study of non-accountability.

Keywords: Public sector, public accountability, internal control, oversight mechanisms, non-compliance, corruption, mal-administration.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 699
2127 Big Data: Concepts, Technologies and Applications in the Public Sector

Authors: A. Alexandru, C. A. Alexandru, D. Coardos, E. Tudora

Abstract:

Big Data (BD) is associated with a new generation of technologies and architectures which can harness the value of extremely large volumes of very varied data through real time processing and analysis. It involves changes in (1) data types, (2) accumulation speed, and (3) data volume. This paper presents the main concepts related to the BD paradigm, and introduces architectures and technologies for BD and BD sets. The integration of BD with the Hadoop Framework is also underlined. BD has attracted a lot of attention in the public sector due to the newly emerging technologies that allow the availability of network access. The volume of different types of data has exponentially increased. Some applications of BD in the public sector in Romania are briefly presented.

Keywords: Big data, big data Analytics, Hadoop framework, cloud computing.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2262
2126 A Comparative Study of Insurance Policies Worldwide in Public Private Partnerships

Authors: Guanqun Shi, Xueqing Zhang

Abstract:

The frequent occurrence of failures in PPP projects which caused great loss has raised attention from the government as well as the concessionaire. PPPs are complex arrangements for its long operation period and multiple players. Many types of risks in PPP projects may cause the project fail. The insurance is an important tool to transfer the risks. Through a comparison and analysis of international government PPP guidelines and contracts as well as the case studies worldwide, we have identified eight main insurance principles, discussed thirteen insurance types in different stages. An overall procedure would be established to improve the practices in PPP projects.

Keywords: Public-private partnerships, insurance, contract, risk.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 800
2125 The Neglected Elements of Implementing Strategic Succession Management in Public Organizations

Authors: François Chiocchio, Mahshid Gharibpour

Abstract:

Regardless of the extent to which succession management is implemented in the private sector, it is still overlooked in the public sector. Traditional succession management is evolving providing a better alignment between business strategies and HR strategies. Succession management brings sustainable effectiveness for succession programs through career path development, knowledge and skill transfer, job retention, as well as high-potential candidates’ empowerment for upcoming vacancies. By way of a systematic literature review, we bring into focus strategic succession management in public organizations and discuss best ways of implementation. 

Keywords: Succession management, strategic succession management, public organization, succession management model.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1579
2124 Client Satisfaction: Does Private or Public Health Sector Make a Difference? Results from Secondary Data Analysis in Sindh, Pakistan

Authors: Wajiha Javed, Arsalan Jabbar, Nelofer Mehboob, Muhammad Tafseer, Zahid Memon

Abstract:

Introduction: Researchers globally have strived to explore diverse factors that augment the continuation and uptake of family planning methods. Clients’ satisfaction is one of the core determinants facilitating continuation of family planning methods. There is a major debate yet scanty evidence to contrast public and private sectors with respect to client satisfaction. The objective of this study is to compare quality-of-care provided by public and private sectors of Pakistan through a client satisfaction lens. Methods: We used Pakistan Demographic Heath Survey 2012-13 dataset on 3133 women. Ten different multivariate models were made. to explore the relationship between client satisfaction and dependent outcome after adjusting for all known confounding factors and results are presented as OR and AOR (95% CI). Results: Multivariate analyses showed that clients were less satisfied in contraceptive provision from private sector as compared to public sector (AOR 0.92, 95% CI 0.63-1.68) even though the result was not statistically significant. Clients were more satisfied from private sector as compared to the public sector with respect to other determinants of quality-of-care follow-up care (AOR 3.29, 95% CI 1.95-5.55), infection prevention (AOR 2.41, 95% CI 1.60-3.62), counseling services (AOR 2.01, 95% CI 1.27-3.18, timely treatment (AOR 3.37, 95% CI 2.20-5.15), attitude of staff (AOR 2.23, 95% CI 1.50-3.33), punctuality of staff (AOR 2.28, 95% CI 1.92-4.13), timely referring (AOR 2.34, 95% CI 1.63-3.35), staff cooperation (AOR 1.75, 95% CI 1.22-2.51) and complications handling (AOR 2.27, 95% CI 1.56-3.29). Discussion: Public sector has successfully attained substantial satisfaction levels with respect to provision of contraceptives, but it contrasts previous literature from a multi country studies. Our study though in is concordance with a study from Tanzania where public sector was more likely to offer family planning services to clients as compared to private facilities. Conclusion: In majority of the developing countries, public sector is more involved in FP service provision; however, in Pakistan clients’ satisfaction in private sector is more, which opens doors for public-private partnerships and collaboration in the near future. 

Keywords: Client satisfaction, Family Planning, Public private partnership, Quality of care

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1965
2123 Decision-Making Criteria of PPP Projects: Stakeholder Theoretic Perspective

Authors: Xueqin Shan, Wenhua Hou, Xiaosu Ye, Chuanming Wu

Abstract:

Any decision-making is based on certain theory. Taking the public rental housing in Chongqing municipality as an example, this essay states that the stakeholder theory can provide innovative criteria and evaluation methods for Public Private Partnership (PPP) projects. It gives an analysis of how to choose decision-making criteria for different stakeholders in the PPP model and what measures to take to meet the criteria to form “symbiotic" decision-making mode through contracts and to boost the application of PPP model in large-scale public programs in China.

Keywords: PPP, Stakeholder Theory, Stakeholders, Decision- making Criteria

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2370
2122 Insiders’ Perspectives of Countering Public Sector Corruption in Nigeria: Identifying and Targeting Its Nature, Characteristics and Fundamental Causes

Authors: Musa Bala Zakari, Mark Button

Abstract:

This paper explores the extent, nature, and characteristics of public sector corruption in Nigeria and the enhancement of the major anti-corruption initiatives (reforms), thereby providing insight into the types, forms and causes of corruption in Nigeria. This paper argues that attempts to devise and suggest effective anti-corruption reforms to control systemic corruption in Nigeria require identifying the most prevalent types of corruption targeted and tackling the fundamental country specific causes. It analyses two types of public sector corruption as it relates to Nigeria and the workings of its inefficient governance system. This paper concludes with the imperative of a collective action against corruption supported by considerable amount of domestic political will existing in a favourable policy context. In undertaking this, the paper draws upon publicly available documents, case laws review and semi-structured interviews conducted with various personnel working in the field of corruption in the dedicated anticorruption agencies, academics, and practitioners from other relevant institutions of accountability.

Keywords: Corruption, development, good governance, public sector.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 583
2121 PPP in Light Rail Transit Systems in Spain

Authors: S. Carpintero, R. Barcham

Abstract:

Light rail systems have proliferated in Spain in the last decade, following a tendency that is common not only in other European countries but also in other parts of the world. This paper reviews the benefits of light rail systems, both related to environmental issues and mobility issues. It analyses the evolution of light rail projects in Spain and shows that light rail systems in this country have evolved towards an extensive use of public-private partnerships. The analysis of the Spanish projects, however, does not contribute any conclusive evidence about whether public-private partnerships have been more efficient than publicly owned enterprises in building and operating light rail systems.

Keywords: Light rail systems, public-private partnerships, BOT.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3225
2120 Operational Risks for Highway Projects in Malaysia

Authors: Farid Ezanee Mohamed Ghazali

Abstract:

The Malaysia Highway Authority (MHA) was established by the Government in 1980 for the purpose of designing, constructing and maintaining toll highways in Malaysia that include the North-South Expressway and the Penang Bridge, which were procured using the publicly-funded traditional procurement. However following a recession in the mid 80-s, the operations of these tolledhighways had been privatized to ensure that their operational services continue through private financing as a result of long-term concession agreement concurred between the Malaysian Government and private operators. The change in the contract strategy for highway projects in Malaysia would have a great tendency to dictate a significant risk exposure towards the key parties involved, particularly the Malaysian Government as project principal, unless operational risks are clearly identified and managed via appropriate mitigation measures prior to a contract signing. This research identifies potential operational risks that have a possibility to occur in highway projects in Malaysia from the perspective of public sector clients. Since this research focuses on the operational risks for highway projects in Malaysia, the initial results acquired from literature review on the operational risks of highway projects in some Asian countries are then justified by a number of key individuals from the MHA through interviews. As a result, among key operational risks that have possibility to occur in the highway projects in Malaysia include initial toll-tariff decided by the Government, traffic congestion, change of road network and overloaded freight transportation, which could cause damage to the road surface and hence affecting the operation of a particular highway.

Keywords: Malaysia, operating highway project, operational risk.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3501
2119 Concept to Enhance the Project Success and Promote the Implementation of Success Factors in Infrastructure Projects

Authors: A. Elbaz, K. Spang

Abstract:

Infrastructure projects are often subjected to delays and cost overruns and mistakenly described as unsuccessful projects. These projects have many peculiarities such as public attention, impact on the environment, subjected to special regulations, etc. They also deal with several stakeholders with different motivations and face unique risks. With this in mind we need to reconsider our approach to manage them, define their success factors and implement these success factors. Infrastructure projects are not only lacking a unified meaning of project success or a definition of success factors, but also a clear method to implement these factors. This paper investigates this gap and introduces a concept to implement success factors in an efficient way, taking into consideration the specific characteristics of infrastructure projects. This concept consists of six enablers such as project organization, project team, project management workflow, contract management, communication and knowledge transfer and project documentations. These enablers allow other success factors to be efficiently implemented in projects. In conclusion, this paper provides project managers as well as company managers with a tool to define and implement success factors efficiently in their projects, along with upgrading their assets for the coming projects. This tool consists of processes and validated checklists to ensure the best use of company resources and knowledge. Due to the special features of infrastructure projects this tool will be tested in the German infrastructure market. However, it is meant to be adaptable to other markets and industries.

Keywords: Infrastructure projects, enablers, project success, success factors, transportation projects.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 906