Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1
Search results for: W. Parinyasart
1 Price Quoting Method for Contract Manufacturer
Authors: S. Homrossukon, W. Parinyasart
Abstract:
This is an applied research to propose the method for price quotation for a contract electronics manufacturer. It has had a precise price quoting method but such method could not quickly provide a result as the customer required. This reduces the ability of company to compete in this kind of business. In this case, the cause of long time quotation process was analyzed. A lot of product features have been demanded by customer. By checking routine processes, it was found that high fraction of quoting time was used for production time estimating which has effected to the manufacturing or production cost. Then the historical data of products including types, number of components, assembling method, and their assembling time were used to analyze the key components affecting to production time. The price quoting model then was proposed. The implementation of proposed model was able to remarkably reduce quoting time with an acceptable required precision.Keywords: Price quoting, Contract manufacturer, Stepwise technique, Best subset technique.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4431