Search results for: FuzzyCapital Budgeting
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 19

Search results for: FuzzyCapital Budgeting

19 Application of 0-1 Fuzzy Programming in Optimum Project Selection

Authors: S. Sadi-Nezhad, K. Khalili Damghani, N. Pilevari

Abstract:

In this article, a mathematical programming model for choosing an optimum portfolio of investments is developed. The investments are considered as investment projects. The uncertainties of the real world are associated through fuzzy concepts for coefficients of the proposed model (i. e. initial investment costs, profits, resource requirement, and total available budget). Model has been coded by using LINGO 11.0 solver. The results of a full analysis of optimistic and pessimistic derivative models are promising for selecting an optimum portfolio of projects in presence of uncertainty.

Keywords: Fuzzy Programming, Fuzzy Knapsack, FuzzyCapital Budgeting, Fuzzy Project Selection

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1677
18 A Comparison of Exact and Heuristic Approaches to Capital Budgeting

Authors: Jindřiška Šedová, Miloš Šeda

Abstract:

This paper summarizes and compares approaches to solving the knapsack problem and its known application in capital budgeting. The first approach uses deterministic methods and can be applied to small-size tasks with a single constraint. We can also apply commercial software systems such as the GAMS modelling system. However, because of NP-completeness of the problem, more complex problem instances must be solved by means of heuristic techniques to achieve an approximation of the exact solution in a reasonable amount of time. We show the problem representation and parameter settings for a genetic algorithm framework.

Keywords: Capital budgeting, knapsack problem, GAMS, heuristic method, genetic algorithm.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1692
17 The Application of Real Options to Capital Budgeting

Authors: George Yungchih Wang

Abstract:

Real options theory suggests that managerial flexibility embedded within irreversible investments can account for a significant value in project valuation. Although the argument has become the dominant focus of capital investment theory over decades, yet recent survey literature in capital budgeting indicates that corporate practitioners still do not explicitly apply real options in investment decisions. In this paper, we explore how real options decision criteria can be transformed into equivalent capital budgeting criteria under the consideration of uncertainty, assuming that underlying stochastic process follows a geometric Brownian motion (GBM), a mixed diffusion-jump (MX), or a mean-reverting process (MR). These equivalent valuation techniques can be readily decomposed into conventional investment rules and “option impacts", the latter of which describe the impacts on optimal investment rules with the option value considered. Based on numerical analysis and Monte Carlo simulation, three major findings are derived. First, it is shown that real options could be successfully integrated into the mindset of conventional capital budgeting. Second, the inclusion of option impacts tends to delay investment. It is indicated that the delay effect is the most significant under a GBM process and the least significant under a MR process. Third, it is optimal to adopt the new capital budgeting criteria in investment decision-making and adopting a suboptimal investment rule without considering real options could lead to a substantial loss in value.

Keywords: real options, capital budgeting, geometric Brownianmotion, mixed diffusion-jump, mean-reverting process

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2713
16 Constructing a Fuzzy Net Present Value Method to Evaluating the BOT Sport Facilities

Authors: Huei-Fu Lu

Abstract:

This paper is to develop a fuzzy net present value (FNPV) method by taking vague cash flow and imprecise required rate of return into account for evaluating the value of the Build-Operate-Transfer (BOT) sport facilities. In order to clearly manifest a more realistic capital budgeting model based on the classical net present value (NPV) method, some uncertain financial elements in NPV formula will be fuzzified as triangular fuzzy numbers. Through the conscientious manipulation of fuzzy set theory, we will find that the proposed FNPV model is a more explicit extension of classical (crisp) model and could be more practicable for the financial managers to capture the essence of capital budgeting of sport facilities than non-fuzzy model.

Keywords: Fuzzy sets; Capital budgeting, Sport facility, Net present value (NPV), Build-Operate-Transfer (BOT) scheme

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1990
15 Government of Ghana’s Budget: An Assessment of Its Compliance with Fundamental Budgeting Principles

Authors: Mohammed Sani Abdulai

Abstract:

Public sector budgeting, all over the world, is underpinned by some universally accepted principles of sound budget management such as budget unity, universality, annuality, and a balanced budget. These traditional principles, though fundamental, had, in recent years, been augmented by the more modern principles of budgeting within fiscal objective, alignment with medium-term strategic plans as well as the observance of such related concepts as transparency, openness and accessibility. In this paper, we have endeavored to shed light, from literature and practice, on the meaning and purposes of such fundamental budgeting principles. We have also assessed the extent to which the Government of Ghana’s budget complies with the four traditional principles of budget unity, universality, annuality, and a balanced budget and the three out of the ten modern principles of budgetary governance of Organisation for Economic Co-operation and Development (OECD). We did so by using a qualitative method of review and analysis of existing documents and the performance assessment reports on Ghana’s Public Financial Management (PFM) measured using such frameworks as the Public Expenditure and Financial Accountability (PEFA), the Open Budget Survey (OBS) and its Index (OBI), the reports and action plans of Open Government Partnership (OGP) and the Global Initiative for Fiscal Transparency (GIFT). Other performance assessment reports that were relied on included, but not limited to, the Joint Evaluation Report of PFM in Ghana, 2001-2010, and the Joint Evaluation of Budget Support to Ghana, 2005-2015. We have, through this paper, brought to the fore the lessons that could be learned on how those budgetary principles undergird the Government of Ghana’s budget formulation, execution, accounting, control, and oversight. These lessons include, but are not limited to, the need for both scholars and practitioners in the PFM space to be aware of the impact of those principles on public sector budgeting.

Keywords: Annulaity, Balanced Budget, Budget Unity, Budgetary Principles, OECD’s Principles on Budgetary Governance, Open Budget Index, Public Expenditure and Financial Accountability, Universality.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 578
14 Analysis of Cost Estimation and Payment Systems for Consultant Contracts in the US, Japan, China and the UK

Authors: Shih-Hsu Wang, Yuan-Yuan Cheng, Ming-Tsung Lee, Wei-Chih Wang

Abstract:

Determining reasonable fees is the main objective of designing the cost estimation and payment systems for consultant contracts. However, project clients utilize different cost estimation and payment systems because of their varying views on the reasonableness of consultant fees. This study reviews the cost estimation and payment systems of consultant contracts for five countries, including the US (Washington State Department of Transportation), Japan (Ministry of Land, Infrastructure, Transport and Tourism), China (Engineering Design Charging Standard) and UK (Her Majesty's Treasure). Specifically, this work investigates the budgeting process, contractor selection method, contractual price negotiation process, cost review, and cost-control concept of the systems used in these countries. The main finding indicates that that project client-s view on whether the fee is high will affect the way he controls it. In the US, the fee is commonly considered to be high. As a result, stringent auditing system (low flexibility given to the consultant) is then applied. In the UK, the fee is viewed to be low by comparing it to the total life-cycle project cost. Thus, a system that has high flexibility in budgeting and cost reviewing is given to the consultant. In terms of the flexibility allowed for the consultant, the systems applied in Japan and China fall between those of the US and UK. Both the US and UK systems are helpful in determining a reasonable fee. However, in the US system, rigid auditing standards must be established and additional cost-audit manpower is required. In the UK system, sufficient historical cost data should be needed to evaluate the reasonableness of the consultant-s proposed fee

Keywords: Consultant Services, Cost Estimation and Payment System, Payment Flexibility, Cost-control Concept

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1635
13 Activity-Based Costing in the Hospitality Industry: A Case Study in a Hotel

Authors: Bita Mashayekhi, Mohammad Ara

Abstract:

The purpose of this study is to provide some empirical evidence about implementing Activity-Based Costing (ABC) in the hospitality industry in Iran. For this purpose, we consider the Tabriz International Hotel as our sample hotel and then gather the relevant data from its cost accounting system in 2012. Then, we use ABC as our costing method and compare the cost of each service unit with that cost which had been extracted for the traditional costing method. The results show a different cost per unit for two methods. Also, because of its more precise and detailed provided information, an ABC system facilitates the decision-making process for managers on decisions related to profitability analysis, budgeting, pricing, and so on.

Keywords: Activity-based costing, activity, cost driver, hospitality industry.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5136
12 Principal Role and School Structure

Authors: Behnaz Mohajeran, Alireza Ghaleei

Abstract:

This main purpose of the study reported here was to investigate the extent to which the form of school governance (particularly decision-making) had an impact upon the effectiveness of the school with reference to parental involvement, planning and budgeting, professional development of teachers, school facilities and resources, and student outcomes. Particular attention was given to decision-making within the governance arrangements. The study was based on four case studies of high schools in New South Wales, Australia including one government school, one independent Christian community school, one independent Catholic school, and one Catholic systemic school. The focus of the research was principals, teachers, parents, and students of four schools with varying governance structures. To gain a greater insight into the issues, the researchers collected information by questionnaire, semi-structured interview, and review of school key documents. This study found that it was not so much structure but the centrality of the school Principal and the way that the Principal perceived his/her roles in relation to others that impacted most on school governance.

Keywords: governance structure, principal role, schooleffectiveness, stakeholder involvement

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2710
11 Developing Road Performance Measurement System with Evaluation Instrument

Authors: Kati Kõrbe Kaare, Kristjan Kuhi, Ott Koppel

Abstract:

Transportation authorities need to provide the services and facilities that are critical to every country-s well-being and development. Management of the road network is becoming increasingly challenging as demands increase and resources are limited. Public sector institutions are integrating performance information into budgeting, managing and reporting via implementing performance measurement systems. In the face of growing challenges, performance measurement of road networks is attracting growing interest in many countries. The large scale of public investments makes the maintenance and development of road networks an area where such systems are an important assessment tool. Transportation agencies have been using performance measurement and modeling as part of pavement and bridge management systems. Recently the focus has been on extending the process to applications in road construction and maintenance systems, operations and safety programs, and administrative structures and procedures. To eliminate failure and dysfunctional consequences the importance of obtaining objective data and implementing evaluation instrument where necessary is presented in this paper

Keywords: Key performance indicators, performance measurement system, evaluation, system architecture.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1946
10 Profitability and Budgeting of Kenaf Cultivation and Fiber Production in Kelantan Districts

Authors: Hamdon A. Abdelrhman

Abstract:

The purpose of the analysis is estimation of viability and profitability of kenaf plant farming in Kelantan State. The monetary information was gathered through interviewing kenaf growers as well group discussion. In addition, the production statistics were collected from Kenaf factory administrative group. The monetary data were analyzed using the Precision financial Calculator. For kenaf production per hectare three scenarios of productivity were adopted, they were 15, 12 and ten; the research results exposed that, when kenaf productivity was 15 ton and the agronomist received financial supports from kenaf administration, the margin profit reached up to 37% which is almost dual profitability that is expected without government support. The financial analysis explains that, the adopted scenarios of the productivity are feasible when Benefit Cost Ratio (BCR) was used as financial indicator. Nonetheless, the kenaf productivity of 15 ton is the superlative viable among the others and payback period is 5 years which equals to middle period time to return the invested amount back. The study concluded that for the farmer to increase the productivity of kenaf per hectare the well farming practices as well as continuously farmers financial support are highly needed.

Keywords: Margin profit, farming practices, financial analysis, kenaf cultivation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 409
9 Examination of Pre-Tender Budgeting Techniques for Mechanical and Electrical Services in Malaysia

Authors: Ganiyu Amuda Yusuf, Sarajul Fikri Mohamed

Abstract:

The procurement and cost management approach adopted for mechanical and electrical (M&E) services in Malaysian construction industry have been criticized for its inefficiency. The study examined early cost estimating practices adopted for mechanical and electrical services (M&E) in Malaysia so as to understand the level of compliance of the current techniques with best practices. The methodology adopted for the study is a review of bidding documents used on both completed and on – going building projects awarded between 2008 – 2010 under 9th Malaysian Plan. The analysis revealed that, M&E services cost cannot be reliably estimated at pre-contract stage; the bidding techniques adopted for M&E services failed to provide uniform basis for contractors to submit tender; detailed measurement of items were not made which could complicate post contract cost control and financial management. The paper concluded that, there is need to follow a structured approach in determining the pre-contract cost estimate for M&E services which will serve as a virile tool for post contract cost control.

Keywords: Cost Management, Mechanical and Electrical Services, Procurement, Standard Method of Measurement

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1855
8 Building Information Modeling-Based Approach for Automatic Quantity Take-off and Cost Estimation

Authors: Lo Kar Yin, Law Ka Mei

Abstract:

Architectural, engineering, construction and operations (AECO) industry practitioners have been well adapting to the dynamic construction market from the fundamental training of its disciplines. As further triggered by the pandemic since 2019, great steps are taken in virtual environment and the best collaboration is strived with project teams without boundaries. With adoption of Building Information Modeling-based approach and qualitative analysis, this paper is to review quantity take-off (QTO) and cost estimation process through modeling techniques in liaison with suppliers, fabricators, subcontractors, contractors, designers, consultants and services providers in the construction industry value chain for automatic project cost budgeting, project cost control and cost evaluation on design options of in-situ reinforced-concrete construction and Modular Integrated Construction (MiC) at design stage, variation of works and cash flow/spending analysis at construction stage as far as practicable, with a view to sharing the findings for enhancing mutual trust and co-operation among AECO industry practitioners. It is to foster development through a common prototype of design and build project delivery method in NEC4 Engineering and Construction Contract (ECC) Options A and C.

Keywords: Building Information Modeling, cost estimation, quantity take-off, modeling techniques.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 613
7 Moving from Rule-based to Principle-based in Public Sector: Preparers' Perspective

Authors: Roshayani Arshad, Normah Omar, Siti Fatimah Awang

Abstract:

The move from cash accounting to accrual accounting, or rule-based to principle-based accounting, by many governments is part of an ongoing efforts in promoting a more business-like and performance-focused public sector. Using questionnaire responses from preparers of financial statements of public universities in Malaysia, this study examines the implementation challenges and benefits of principle-based accounting. Results from these responses suggest that most respondents perceived significant costs would be incurred in relation to staff training and recruitment of staffs with relevant technical knowledge. In addition, most respondents also perceived that there will be significant changes in the current accounting system and structure in order to comply with the principle-based accounting requirements. However, most respondents perceived that these changes might not result in significant benefits for management purposes, for example, financial management, budgeting and allocation of resources. Nevertheless, most respondents perceived that principle-based accounting information would facilitate the monitoring function of the board. The general perception is that adoption of principle-based accounting information is not significantly useful than rule-based accounting information is expected to change over time as preparers of the financial statements gradually understand and appreciate the benefits of principle-based accounting information. This infers that the perceived usefulness of different accounting system is a function of familiarity by the preparers.

Keywords: Accrual accounting, principle-based accounting, public sector, rule-based accounting.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2900
6 A Framework for University Social Responsibility and Sustainability: The Case of South Valley University, Egypt

Authors: Alaa Tag Eldin Mohamed

Abstract:

The environmental, cultural, social, and technological changes have led higher education institutes to question their traditional roles. Many declarations and frameworks highlight the importance of fulfilling social responsibility of higher education institutes. The study aims at developing a framework of university social responsibility and sustainability (USR&S) with focus on South Valley University (SVU) as a case study of Egyptian Universities. The study used meetings with 12 vice deans of community services and environmental affairs on social responsibility and environmental issues. The proposed framework integrates social responsibility with strategic management through the establishment and maintenance of the vision, mission, values, goals and management systems; elaboration of policies; provision of actions; evaluation of services and development of social collaboration with stakeholders to meet current and future needs of the community and environment. The framework links between different stakeholders internally and externally using communication and reporting tools. The results show that SVU integrates social responsibility and sustainability in its strategic plans. It has policies and actions however fragmented and lack of appropriate structure and budgeting. The proposed framework could be valuable for researchers and decision makers of the Egyptian Universities. The study proposed recommendations and highlighted building on the results and conducting future research.

Keywords: Corporate social responsibility (CSR), South Valley University, Sustainable University, university social responsibility and sustainability (USR&S).

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4046
5 Government of Ghana’s Budget: Its Functions, Coverage, Classification, and Integration with Chart of Accounts

Authors: Mohammed Sani Abdulai

Abstract:

Government budgets are the primary instruments for formulating and implementing a country’s fiscal policy objectives, development priorities, and the overall socio-economic aspirations of its people. Thus, in this paper, the author examined the Government of Ghana’s budgets with respect to their functions, coverage, classifications, and integration with the country’s chart of accounts. The author did so by amalgamating the research findings of extant literature with (a) the operational and procedural guidelines underpinning the formulation and execution of the government’s budgets; (b) the recommendations made by various development partners and thinktanks on reforming the country’s budgeting processes and procedures; and (c) the lessons Ghana could learn from the budget reform efforts of other countries. By way of research findings, the paper showed that the Government of Ghana’s budgets in terms of function are both eclectic and multidimensional. On coverage, the paper showed that the country’s budgets duly cover the revenues and expenditures of the general government (i.e., both the central and sub-national governments). Finally, on classifications, the paper noted with delight the Government of Ghana’s effort in providing classificatory codes to both its national development agenda and such international development goals as the AU’s Agenda 2063 and the UN’s Sustainable Development Goals. However, the paper found some significant lapses that require a complete overhaul and structuring on the integrations of its budget classifications with its chart of accounts. Thus, the paper concluded with a detailed examination of the challenges confronting the country’s current chart of accounts and recommendations for addressing them.

Keywords: Budget, budgetary transactions, budgetary governance, Chart of Accounts, classification, composition, coverage, Public Financial Management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 429
4 Absence of Leave and Job Morality in the ICU

Authors: Li-Ping Hsiao, Feng-Chuan Pan

Abstract:

Leave of absence is important in maintaining a good status of human resource quality. Allowing the employees temporarily free from the routine assignments can vitalize the workers- morality and productivity. This is particularly critical to secure a satisfactory service quality for healthcare professionals of which were typically featured with labor intensive and complicated works to perform. As one of the veteran hospitals that were found and operated by the Veteran Department of Taiwan, the nursing staff of the case hospital was squeezed to an extreme minimum level under the pressure of a tight budgeting. Leave of absence on schedule became extremely difficult, especially for the intensive care units (ICU), in which required close monitoring over the cared patients, and that had more easily driven the ICU nurses nervous. Even worse, the deferred leaves were more than 10 days at any time in the ICU because of a fluctuating occupancy. As a result, these had brought a bad setback to this particular nursing team, and consequently defeated the job performance and service quality. To solve this problem and accordingly to strengthen their morality, a project team was organized across different departments specific for this. Sufficient information regarding jobs and positions requirements, labor resources, and actual working hours in detail were collected and analyzed in the team meetings. Several alternatives were finalized. These included job rotating, job combination, leave on impromptu and cross-departmental redeployment. Consequently, the deferred leave days sharply reduced 70% to a level of 3 or less days. This improvement had not only provided good shelter for the ICU nurses that improved their job performance and patient safety but also encouraged the nurses active participating of a project and learned the skills of solving problems with colleagues.

Keywords: Information, job rotating, human resource, intensive care unit.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1477
3 Critical Success Factors Influencing Construction Project Performance for Different Objectives: Procurement Phase

Authors: Samart Homthong, Wutthipong Moungnoi

Abstract:

Critical success factors (CSFs) and the criteria to measure project success have received much attention over the decades and are among the most widely researched topics in the context of project management. However, although there have been extensive studies on the subject by different researchers, to date, there has been little agreement on the CSFs. The aim of this study is to identify the CSFs that influence the performance of construction projects, and determine their relative importance for different objectives across five stages in the project life cycle. A considerable literature review was conducted that resulted in the identification of 179 individual factors. These factors were then grouped into nine major categories. A questionnaire survey was used to collect data from three groups of respondents: client representatives, consultants, and contractors. Out of 164 questionnaires distributed, 93 were returned, yielding a response rate of 56.7%. Using the mean score, relative importance index, and weighted average method, the top 10 critical factors for each category were identified. The agreement of survey respondents on those categorised factors were analysed using Spearman’s rank correlation. A one-way analysis of variance was then performed to determine whether the mean scores among the various groups of respondents were statistically significant. The findings indicate the most CSFs in each category in procurement phase are: proper procurement programming of materials (time), stability in the price of materials (cost), and determining quality in the construction (quality). They are then followed by safety equipment acquisition and maintenance (health and safety), budgeting allowed in a contractual arrangement for implementing environmental management activities (environment), completeness of drawing documents (productivity), accurate measurement and pricing of bill of quantities (risk management), adequate communication among the project team (human resource), and adequate cost control measures (client satisfaction). An understanding of CSFs would help all interested parties in the construction industry to improve project performance. Furthermore, the results of this study would help construction professionals and practitioners take proactive measures for effective project management.

Keywords: Critical success factors, procurement phase, project life cycle, project performance.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2166
2 2Taiwan Public Corporation's Participation in the Mechanism of Payment for Environmental Services

Authors: Wan-Yu Liu, Chun-Cheng Lin

Abstract:

The Taiwan government has started to promote the “Plain Landscape Afforestation and Greening Program" since 2002. A key task of the program was the payment for environmental services (PES), entitled the “Plain Landscape Afforestation Policy" (PLAP), which was certificated by the Executive Yuan on August 31, 2001 and enacted on January 1, 2002. According to the policy, it is estimated that the total area of afforestation will be 25,100 hectares by December 31, 2007. Until the end of 2007, the policy had been enacted for six years in total and the actual area of afforestation was 8,919.18 hectares. Among them, Taiwan Sugar Corporation (TSC) was accounted for 7,960 hectares (with 2,450.83 hectares as public service area) which occupied 86.22% of the total afforestation area; the private farmland promoted by local governments was accounted for 869.18 hectares which occupied 9.75% of the total afforestation area. Based on the above, we observe that most of the afforestation area in this policy is executed by TSC, and the achievement ratio by TSC is better than by others. It implies that the success of the PLAP is seriously related to the execution of TSC. The objective of this study is to analyze the relevant policy planning of TSC-s participation in the PLAP, suggest complementary measures, and draw up effective adjustment mechanisms, so as to improve the effectiveness of executing the policy. Our main conclusions and suggestions are summarized as follows: 1. The main reason for TSC-s participation in the PLAP is based on their passive cooperation with the central government or company policy. Prior to TSC-s participation in the PLAP, their lands were mainly used for growing sugarcane. 2. The main factors of TSC-s consideration on the selection of tree species are based on the suitability of land and species. The largest proportion of tree species is allocated to economic forests, and the lack of technical instruction was the main problem during afforestation. Moreover, the method of improving TSC-s future development in leisure agriculture and landscape business becomes a key topic. 3. TSC has developed short and long-term plans on participating in the PLAP for the future. However, there is no great willingness or incentive on budgeting for such detailed planning. 4. Most people from TSC interviewed consider the requirements on PLAP unreasonable. Among them, an unreasonable requirement on the number of trees accounted for the greatest proportion; furthermore, most interviewees suggested that the government should continue to provide incentives even after 20 years. 5. Since the government shares the same goals as TSC, there should be sufficient cooperation and communication that support the technical instruction and reduction of afforestation cost, which will also help to improve effectiveness of the policy.

Keywords: Payment for environmental services (PES), afforestation subsidy, Taiwan Sugar Corporation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1930
1 Taiwan Sugar Corporation's Participation in the Mechanism of Payment for Environmental Services (PES)

Authors: Wan-Yu Liu

Abstract:

The Taiwan government has started to promote the “Plain Landscape Afforestation and Greening Program" since 2002. A key task of the program was the payment for environmental services (PES), entitled the “Plain Landscape Afforestation Policy" (PLAP), which was certificated by the Executive Yuan on August 31, 2001 and enacted on January 1, 2002. According to the policy, it is estimated that the total area of afforestation will be 25,100 hectares by December 31, 2007. Until the end of 2007, the policy had been enacted for six years in total and the actual area of afforestation was 8,919.18 hectares. Among them, Taiwan Sugar Corporation (TSC) was accounted for 7,960 hectares (with 2,450.83 hectares as public service area) which occupied 86.22% of the total afforestation area; the private farmland promoted by local governments was accounted for 869.18 hectares which occupied 9.75% of the total afforestation area. Based on the above, we observe that most of the afforestation area in this policy is executed by TSC, and the achievement ratio by TSC is better than by others. It implies that the success of the PLAP is seriously related to the execution of TSC. The objective of this study is to analyze the relevant policy planning of TSC's participation in the PLAP, suggest complementary measures, and draw up effective adjustment mechanisms, so as to improve the effectiveness of executing the policy. Our main conclusions and suggestions are summarized as follows: 1. The main reason for TSC’s participation in the PLAP is based on their passive cooperation with the central government or company policy. Prior to TSC’s participation in the PLAP, their lands were mainly used for growing sugarcane. 2. The main factors of TSC's consideration on the selection of tree species are based on the suitability of land and species. The largest proportion of tree species is allocated to economic forests, and the lack of technical instruction was the main problem during afforestation. Moreover, the method of improving TSC’s future development in leisure agriculture and landscape business becomes a key topic. 3. TSC has developed short and long-term plans on participating in the PLAP for the future. However, there is no great willingness or incentive on budgeting for such detailed planning. 4. Most people from TSC interviewed consider the requirements on PLAP unreasonable. Among them, an unreasonable requirement on the number of trees accounted for the greatest proportion; furthermore, most interviewees suggested that the government should continue to provide incentives even after 20 years. 5. Since the government shares the same goals as TSC, there should be sufficient cooperation and communication that support the technical instruction and reduction of afforestation cost, which will also help to improve effectiveness of the policy.

Keywords: Payment for environmental services, afforestation subsidy, Taiwan sugar corporation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1525