Search results for: Shen Jian
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 123

Search results for: Shen Jian

3 Thailand Throne Hall Architecture in the Grand Palace in the Early Days of Ratthanakosin Era

Authors: Somchai Seviset, Lin Jian Qun

Abstract:

Amarindra-vinitchai-mahaisuraya Bhiman throne hall is one of the most significant throne halls in the grand palace in the Ratthanakosin city situated in Bangkok, Thailand. This is the first group of throne halls built in order to serve as a place for meetings, performing state affairs and royal duties until the present time. The structure and pattern of architectural design including the decoration and interior design of the throne hall obviously exhibits and convey the status of the king under the context of Thai society in the early period of Ratthanakosin era. According to the tradition of ruling the kingdom in absolute monarchy which had been in place since Ayutthaya era (A.D.1350-1767), the king was deemed as Deva Raja, the highest power and authority over the kingdom and as the greatest emperor of the universe (Chakkravatin). The architectural design adopted the concept of “Prasada" or Viman which served as the dwelling place of the gods and was presented in the form of “Thai traditional architecture" For the interior design of the throne hall, it had been adopted to be the heaven and the centre of the Universe in line with the cosmological beliefs of ancient people described in scripture Tribhumikatha (Tri Bhumi) written by Phra Maha Thamma Raja (Phraya Lithai) of the Sukhothai era (A.D.1347-1368). According to this belief, the throne hall had been designed to represent mount Meru, the central of the universe. On the top end of Mount Meru is situated the Viman and dwelling place of Indra who is the king of gods according to the idea of Deva Raja (the king god Avatar). At the same time, Indra also existed as the king of the universe simultaneously.

Keywords: Amarindra-vinitchai-mahaisuraya Bhiman throne hall, throne hall architecture, grand palace, Thai traditional architecture, Ratthanakosin era

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2514
2 Computer Modeling and Plant-Wide Dynamic Simulation for Industrial Flare Minimization

Authors: Sujing Wang, Song Wang, Jian Zhang, Qiang Xu

Abstract:

Flaring emissions during abnormal operating conditions such as plant start-ups, shut-downs, and upsets in chemical process industries (CPI) are usually significant. Flare minimization can help to save raw material and energy for CPI plants, and to improve local environmental sustainability. In this paper, a systematic methodology based on plant-wide dynamic simulation is presented for CPI plant flare minimizations under abnormal operating conditions. Since off-specification emission sources are inevitable during abnormal operating conditions, to significantly reduce flaring emission in a CPI plant, they must be either recycled to the upstream process for online reuse, or stored somewhere temporarily for future reprocessing, when the CPI plant manufacturing returns to stable operation. Thus, the off-spec products could be reused instead of being flared. This can be achieved through the identification of viable design and operational strategies during normal and abnormal operations through plant-wide dynamic scheduling, simulation, and optimization. The proposed study includes three stages of simulation works: (i) developing and validating a steady-state model of a CPI plant; (ii) transiting the obtained steady-state plant model to the dynamic modeling environment; and refining and validating the plant dynamic model; and (iii) developing flare minimization strategies for abnormal operating conditions of a CPI plant via a validated plant-wide dynamic model. This cost-effective methodology has two main merits: (i) employing large-scale dynamic modeling and simulations for industrial flare minimization, which involves various unit models for modeling hundreds of CPI plant facilities; (ii) dealing with critical abnormal operating conditions of CPI plants such as plant start-up and shut-down. Two virtual case studies on flare minimizations for start-up operation (over 50% of emission savings) and shut-down operation (over 70% of emission savings) of an ethylene plant have been employed to demonstrate the efficacy of the proposed study.

Keywords: Flare minimization, large-scale modeling and simulation, plant shut-down, plant start-up.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1731
1 Applying Participatory Design for the Reuse of Deserted Community Spaces

Authors: Wei-Chieh Yeh, Yung-Tang Shen

Abstract:

The concept of community building started in 1994 in Taiwan. After years of development, it fostered the notion of active local resident participation in community issues as co-operators, instead of minions. Participatory design gives participants more control in the decision-making process, helps to reduce the friction caused by arguments and assists in bringing different parties to consensus. This results in an increase in the efficiency of projects run in the community. Therefore, the participation of local residents is key to the success of community building. This study applied participatory design to develop plans for the reuse of deserted spaces in the community from the first stage of brainstorming for design ideas, making creative models to be employed later, through to the final stage of construction. After conducting a series of participatory designed activities, it aimed to integrate the different opinions of residents, develop a sense of belonging and reach a consensus. Besides this, it also aimed at building the residents’ awareness of their responsibilities for the environment and related issues of sustainable development. By reviewing relevant literature and understanding the history of related studies, the study formulated a theory. It took the “2012-2014 Changhua County Community Planner Counseling Program” as a case study to investigate the implementation process of participatory design. Research data are collected by document analysis, participants’ observation and in-depth interviews. After examining the three elements of “Design Participation”, “Construction Participation”, and” Follow–up Maintenance Participation” in the case, the study emerged with a promising conclusion: Maintenance works were carried out better compared to common public works. Besides this, maintenance costs were lower. Moreover, the works that residents were involved in were more creative. Most importantly, the community characteristics could be easy be recognized.

Keywords: Participatory design, Deserted spaces, Community building, Reuse.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1292