Search results for: Maksudur Rahman Khan
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 422

Search results for: Maksudur Rahman Khan

2 Economic Impact of Rana Plaza Collapse

Authors: Md. Omar Bin Harun Khan

Abstract:

The collapse of the infamous Rana Plaza, a multi-storeyed commercial building in Savar, near Dhaka, Bangladesh has brought with it a plethora of positive and negative consequences. Bangladesh being a key player in the export of clothing, found itself amidst a wave of economic upheaval following this tragic incident that resulted in numerous Bangladeshis, most of whom were factory workers. This paper compares the consequences that the country’s Ready Made Garments (RMG) sector is facing now, two years into the incident. The paper presents a comparison of statistical data from study reports and brings forward perspectives from all dimensions of Labour, Employment and Industrial Relations in Bangladesh following the event. The paper brings across the viewpoint of donor organizations and donor countries, the impacts of several initiatives taken by foreign organizations like the International Labour Organization, and local entities like the Bangladesh Garment Manufacturers and Exporters Association (BGMEA) in order to reinforce compliance and stabilize the shaky foundation that the RMG sector had found itself following the collapse. Focus of the paper remains on the stance taken by the suppliers in Bangladesh, with inputs from buying houses and factories, and also on the reaction of foreign brands. The paper also focuses on the horrific physical, mental and financial implications sustained by the victims and their families, and the consequent uproar from workers in general regarding compliance with work safety and workers’ welfare conditions. The purpose is to get across both sides of the scenario: the economic impact that suppliers / factories/ sellers/ buying houses/exporters have faced in Bangladesh as a result of complete loss of reliability on them regarding working standards; and also to cover the aftershock felt on the other end of the spectrum by the importers/ buyers, particularly the foreign entities, in terms of the sudden accountability of being affiliated with non- compliant factories. The collapse of Rana Plaza has received vast international attention and strong criticism. Nevertheless, the almost immediate strengthening of labourrights and the wholesale reform undertaken on all sides of the supply chain, evidence a move of all local and foreign stakeholders towards greater compliance and taking of precautionary steps for prevention of further disasters. The tragedy that Rana Plaza embodies served as a much-needed epiphany for the soaring RMG Sector of Bangladesh. Prompt co-operation on the part of all stakeholders and regulatory bodies now show a move towards sustainable development, which further ensures safeguarding against any future irregularities and pave the way for steady economic growth.

Keywords: Economy, employment standards, Ranaplaza, RMG.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4551
1 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: Causes of construction project delays, construction industry, construction management, power distance.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3121