B. Lee

Publications

1 How CATV Survive in the Era of Convergence?

Authors: J. Park, J. Song, B. Lee

Abstract:

The purpose of this paper is to analyze the case of the U.S. Pivot and to suggest an appropriate model including entry strategies and success factors for QPS of Cable TV. The telecommunication companies have been operating QPS including IPTV service, which enables them to cross over broadcasting areas. Due to this circumstance, the Cable TV operators are now concerned and are planning to add QPS with the mobile service. Based on the Porter's five forces model, an analytical framework has been proposed to MVNO in Cable TV industry in the United States. As a result of this study, MVNO in Cable TV industry has to have a clear killer application with their sufficient contents. Subsequently, the direction of the future Cable TV industry is proposed.

Keywords: CATV, MVNO, Pivot, QPS

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1213

Abstracts

2 Machine Learning Approach to Project Control Threshold Reliability Evaluation

Authors: H. Lee, B. Lee, Y. Kim, M. Park

Abstract:

Planning is understood as the determination of what has to be performed, how, in which sequence, when, what resources are needed, and their cost within the organization before execution. In most construction project, it is evident that the inherent nature of planning is dynamic, and initial planning is subject to be changed due to various uncertain conditions of construction project. Planners take a continuous revision process during the course of a project and until the very end of project. However, current practice lacks reliable, systematic tool for setting variance thresholds to determine when and what corrective actions to be taken. Rather it is heavily dependent on the level of experience and knowledge of the planner. Thus, this paper introduces a machine learning approach to evaluate project control threshold reliability incorporating project-specific data and presents a method to automate the process. The results have shown that the model improves the efficiency and accuracy of the monitoring process as an early warning.

Keywords: Machine Learning, Project Control, schedule, project progress monitoring

Procedia PDF Downloads 108
1 Study on Water Level Management Criteria of Reservoir Failure Alert System

Authors: B. Lee, B. H. Choi

Abstract:

The loss of safety for reservoirs brought about by climate change and facility aging leads to reservoir failures, which results in the loss of lives and property damage in downstream areas. Therefore, it is necessary to provide a reservoir failure alert system for downstream residents to detect the early signs of failure (with sensors) in real-time and perform safety management to prevent and minimize possible damage. 10 case studies were carried out to verify the water level management criteria of four levels (attention, caution, alert, serious). Peak changes in water level data were analysed. The results showed that ‘Caution’ and ‘Alert’ were closed to 33% and 66% of difference in level between flood water level and full water level. Therefore, it is adequate to use initial water level management criteria of reservoir failure alert system for the first year. Acknowledgment: This research was supported by a grant (2017-MPSS31-002) from 'Supporting Technology Development Program for Disaster Management' funded by the Ministry of the Interior and Safety(MOIS)

Keywords: Sensor, alert system, management criteria, reservoir failure

Procedia PDF Downloads 69