Yoon Seok Chang

Publications

2 Performance Comparison between Conventional and Flexible Box Erecting Machines Using Dispatching Rules

Authors: Yoon Seok Chang, Min Kyu Kim, Eun Young Lee, Dong Woo Son

Abstract:

In this paper, we introduce a flexible box erecting machine (BEM) that swiftly and automatically transforms cardboard into a three dimensional box. Recently, the parcel service and home-shopping industries have grown rapidly, and there is an increasing need for various box types to ship various products. However, workers cannot fold thousands of boxes manually in a day. As such, automatic BEMs are garnering greater attention. This study takes equipment operation into consideration as well as mechanical improvements in order to design a BEM that is able to outperform its conventional counterparts. We analyzed six dispatching rules – First In First Out (FIFO), Shortest Processing Time (SPT), Earliest Due Date (EDD), Setup Avoidance, EDD + SPT, and EDD + Setup Avoidance – to determine which one was most suitable for BEM operation. Consequently, SPT and Setup Avoidance were found to be the most critical rules, followed by EDD + Setup Avoidance, EDD + SPT, EDD, and FIFO. This hierarchy was valid for both our conventional BEM and our new flexible BEM from the viewpoint of processing time. We believe that this research can contribute to flexible BEM management, which has the potential to increase productivity and convenience.

Keywords: Automation, box erecting machine, dispatching rule, setup time

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1193
1 Quality Monitoring and Dynamic Pricing in Cold Chain Management

Authors: Myo Min Aung, Yoon Seok Chang, Woo Ram Kim

Abstract:

This paper presents a cold chain monitoring system which focuses on assessment of quality and dynamic pricing information about food in cold chain. Cold chain is composed of many actors and stages; however it can be seen as a single entity since a breakdown in temperature control at any stage can impact the final quality of the product. In a cold chain, the shelf life, quality, and safety of perishable food throughout the supply chain is greatly impacted by environmental factors especially temperature. In this paper, a prototype application is implemented to retrieve timetemperature history, the current quality and the dynamic price setting according to changing quality impacted by temperature fluctuations in real-time.

Keywords: Traceability, Cold Chain, Quality, monitoring, temperature

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2656

Abstracts

1 A Performance Comparison between Conventional and Flexible Box Erecting Machines Using Dispatching Rules

Authors: Yoon Seok Chang, Min Kyu Kim, Eun Young Lee, Dong Woo Son

Abstract:

In this paper, we introduce a flexible box erecting machine (BEM) that swiftly and automatically transforms cardboard into a three dimensional box. Recently, the parcel service and home-shopping industries have grown rapidly, and there is an increasing need for various box types to ship various products. However, workers cannot fold thousands of boxes manually in a day. As such, automatic BEMs are garnering greater attention. This study takes equipment operation into consideration as well as mechanical improvements in order to design a BEM that is able to outperform its conventional counterparts. We analyzed six dispatching rules – First In First Out (FIFO), Shortest Processing Time (SPT), Earliest Due Date (EDD), Setup Avoidance, EDD + SPT, and EDD + Setup Avoidance – to determine which one was most suitable for BEM operation. Consequently, SPT and Setup Avoidance were found to be the most critical rules, followed by EDD + Setup Avoidance, EDD + SPT, EDD, and FIFO. This hierarchy was valid for both our conventional BEM and our new flexible BEM from the viewpoint of processing time. We believe that this research can contribute to flexible BEM management, which has the potential to increase productivity and convenience.

Keywords: Automation, box erecting machine, dispatching rule, setup time

Procedia PDF Downloads 248