Material requirement planning Related Publications

3 Dynamic Safety-Stock Calculation

Authors: Julian Becker, Wiebke Hartmann, Sebastian Bertsch, Johannes Nywlt, Matthias Schmidt

Abstract:

In order to ensure a high service level industrial enterprises have to maintain safety-stock that directly influences the economic efficiency at the same time. This paper analyses established mathematical methods to calculate safety-stock. Therefore, the performance measured in stock and service level is appraised and the limits of several methods are depicted. Afterwards, a new dynamic approach is presented to gain an extensive method to calculate safety-stock that also takes the knowledge of future volatility into account.

Keywords: Material requirement planning, Inventory dimensioning, safety-stock calculation

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 6428
2 Reduce the Complexity of Material Requirement Planning on Excel by an Algorithm

Authors: Sumitra Nuanmeesri, Kanate Ploydanai

Abstract:

Many companies have excel, it is economy and well perform to use in material requirement planning (MRP) on excel. For several products, it, however, is complex problem to link the relationship between the tables of products because the relationship depends on bill of material (BOM). This paper presents algorithm to create MRP on excel, and links relationship between tables. The study reveals MRP that is created by the algorithm which is easier and faster than MRP that created by human. By this technique, MRP on excel might be good ways to improve a productivity of companies.

Keywords: Algorithm, spreadsheet, Material requirement planning

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2933
1 An Algorithm of Finite Capacity Material Requirement Planning System for Multi-stage Assembly Flow Shop

Authors: T. Wuttipornpun, U. Wangrakdiskul, W. Songserm

Abstract:

This paper aims to develop an algorithm of finite capacity material requirement planning (FCMRP) system for a multistage assembly flow shop. The developed FCMRP system has two main stages. The first stage is to allocate operations to the first and second priority work centers and also determine the sequence of the operations on each work center. The second stage is to determine the optimal start time of each operation by using a linear programming model. Real data from a factory is used to analyze and evaluate the effectiveness of the proposed FCMRP system and also to guarantee a practical solution to the user. There are five performance measures, namely, the total tardiness, the number of tardy orders, the total earliness, the number of early orders, and the average flow-time. The proposed FCMRP system offers an adjustable solution which is a compromised solution among the conflicting performance measures. The user can adjust the weight of each performance measure to obtain the desired performance. The result shows that the combination of FCMRP NP3 and EDD outperforms other combinations in term of overall performance index. The calculation time for the proposed FCMRP system is about 10 minutes which is practical for the planners of the factory.

Keywords: Linear Programming, application in industry, permutation, Material requirement planning, Finite capacity

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2009