13 Shotcrete Performance Optimisation and Audit Using 3D Laser Scanning

Authors: Carlos Gonzalez, Neil Slatcher, Marcus Properzi, Kan Seah

Abstract:

In many underground mining operations, shotcrete is used for permanent rock support. Shotcrete thickness is a critical measure of the success of this process. 3D Laser Mapping, in conjunction with Jetcrete, has developed a 3D laser scanning system specifically for measuring the thickness of shotcrete. The system is mounted on the shotcrete spraying machine and measures the rock faces before and after spraying. The calculated difference between the two 3D surface models is measured as the thickness of the sprayed concrete. Typical work patterns for the shotcrete process required a rapid and automatic system. The scanning takes place immediately before and after the application of the shotcrete so no convergence takes place in the interval between scans. Automatic alignment of scans without targets was implemented which allows for the possibility of movement of the spraying machine between scans. Case studies are presented where accuracy tests are undertaken and automatic audit reports are calculated. The use of 3D imaging data for the calculation of shotcrete thickness is an important tool for geotechnical engineers and contract managers, and this could become the new state-of-the-art methodology for the mining industry.

Keywords: 3D imaging, shotcrete, surface model, tunnel stability

Procedia PDF Downloads 264
12 An Approach for Determination of Shotcrete Thickness in Underground Structures

Authors: Mohammad Mohammadi, Mojtaba Askari, Mohammad Farouq Hossaini

Abstract:

An intrinsic property of rock mass known as rock bolt supporting factor (RSF) or rock bolting capability of rock mass was developed and used for explanation of the mechanism of rock bolting practice. Based on the theory of RSF, numeral values can be assigned to each given rock mass to show the capability of that rock mass to be reinforced by rock bolting. For determination of shotcrete thickness, both safety and cost must be taken into account. The present paper introduces a scientific approach for determination of the necessary shotcrete thickness in underground structures for support purposes using the concept of rock bolt supporting factor (RSF). The proposed approach makes the outcome of shotcrete design one step more accurate than before. The actual dataset of 500 meters of Alborz Tunnel length is used as an example of the application of the approach.

Keywords: rock bolt supporting factor (RSF), shotcrete design, underground excavation, Alborz Tunnel

Procedia PDF Downloads 279
11 Understanding the Role of Alkali-Free Accelerators in Wet-Mix Shotcrete

Authors: Ezgi Yurdakul, Klaus-Alexander Rieder, Richard Sibbick

Abstract:

Most of the shotcrete projects require compliance with meeting a specified early-age strength target (e.g., reaching 1 MPa in 1 hour) that is selected based on the underground conditions. To meet the desired early-age performance characteristics, accelerators are commonly used as they increase early-age strength development rate and accelerate the setting thereby reducing sagging and rebound. The selection of accelerator type and its dosage is made by the setting time and strength required for the shotcrete application. While alkaline and alkali-free accelerators are the two main types used in wet-mix shotcrete; alkali-free admixtures increasingly substitute the alkaline accelerators to improve the performance and working safety. This paper aims to evaluate the impact of alkali-free accelerators in wet-mix on various tests including set time, early and later-age compressive strength, boiled absorption, and electrical resistivity. Furthermore, the comparison between accelerated and non-accelerated samples will be made to demonstrate the interaction between cement and accelerators. Scanning electron microscopy (SEM), fluorescent resin impregnated thin section and cut and polished surface images will be used to understand the microstructure characterization of mixes in the presence of accelerators.

Keywords: accelerators, chemical admixtures, shotcrete, sprayed concrete

Procedia PDF Downloads 138
10 Development of the Accelerator Applied to an Early Stage High-Strength Shotcrete

Authors: Ayanori Sugiyama, Takahisa Hanei, Yasuhide Higo

Abstract:

Domestic demand for the construction of tunnels has been increasing in recent years in Japan. To meet this demand, various construction materials and construction methods have been developed to attain higher strength, reduction of negative impact on the environment and improvement for working conditions. In this report, we would like to introduce the newly developed shotcrete with superior hardening properties which were tested through the actual machine scale and its workability and strength development were evaluated. As a result, this new tunnel construction method was found to achieve higher workability and quicker strength development in only a couple of minutes.

Keywords: accelerator, shotcrete, tunnel, high-strength

Procedia PDF Downloads 274
9 Recent Studies on Strengthening of Reinforced Concrete Members by Ferrocement

Authors: E. Lam, Z. D. Yang, B. Li, I. Ho, T. Wong, V. Wong

Abstract:

This paper reports some of the recent studies on strengthening of reinforced concrete members by ferrocement. Using mortar in ferrocement with high tensile strength, tensile properties of (high performance) ferrocement can be enhanced. In the proposed strengthening strategy, defective concrete cover of structural members is replaced by ferrocement so as to increase the load carrying capacity. This has been successfully applied to strengthen columns and beam-column joints. To facilitate the ease of application of the proposed strengthening strategy, mortar in ferrocement is applied through dry spray shotcrete.

Keywords: ferrocement, high performance ferrocement, dry, spray shotcrete, column, beam-column joint, strengthening

Procedia PDF Downloads 406
8 Modelling for Roof Failure Analysis in an Underground Cave

Authors: M. Belén Prendes-Gero, Celestino González-Nicieza, M. Inmaculada Alvarez-Fernández

Abstract:

Roof collapse is one of the problems with a higher frequency in most of the mines of all countries, even now. There are many reasons that may cause the roof to collapse, namely the mine stress activities in the mining process, the lack of vigilance and carelessness or the complexity of the geological structure and irregular operations. This work is the result of the analysis of one accident produced in the “Mary” coal exploitation located in northern Spain. In this accident, the roof of a crossroad of excavated galleries to exploit the “Morena” Layer, 700 m deep, collapsed. In the paper, the work done by the forensic team to determine the causes of the incident, its conclusions and recommendations are collected. Initially, the available documentation (geology, geotechnics, mining, etc.) and accident area were reviewed. After that, laboratory and on-site tests were carried out to characterize the behaviour of the rock materials and the support used (metal frames and shotcrete). With this information, different hypotheses of failure were simulated to find the one that best fits reality. For this work, the software of finite differences in three dimensions, FLAC 3D, was employed. The results of the study confirmed that the detachment was originated as a consequence of one sliding in the layer wall, due to the large roof span present in the place of the accident, and probably triggered as a consequence of the existence of a protection pillar insufficient. The results allowed to establish some corrective measures avoiding future risks. For example, the dimensions of the protection zones that must be remained unexploited and their interaction with the crossing areas between galleries, or the use of more adequate supports for these conditions, in which the significant deformations may discourage the use of rigid supports such as shotcrete. At last, a grid of seismic control was proposed as a predictive system. Its efficiency was tested along the investigation period employing three control equipment that detected new incidents (although smaller) in other similar areas of the mine. These new incidents show that the use of explosives produces vibrations which are a new risk factor to analyse in a next future.

Keywords: forensic analysis, hypothesis modelling, roof failure, seismic monitoring

Procedia PDF Downloads 88
7 Tunnelling Concepts in Overstressed Weak Rocks

Authors: Entfellner Manuel, Wannenmacher Helmut, Reisenbauer Josef, Schubert Wulf

Abstract:

When tunnelling in overstressed weak rocks ("squeezing ground"), two basic design approaches are available: the resistance principle, and the yielding principle. The resistance principle relies on rigid support systems to withstand the ground pressure. Alternatively, the yielding principle prioritizes controlled deformation, allowing the ground to deform without compromising tunnel integrity. This paper highlights the beneficial factors of the yielding principle for conventionally excavated tunnels in overstressed weak rocks. Especially the application of a ductile shotcrete lining with yielding elements is analysed in detail. Construction costs, safety, short- and long-term stabilities are discussed.

Keywords: squeezing ground, yielding principle, yielding element, conventional tunneling

Procedia PDF Downloads 31
6 Controlled Deconstruction and Rehabilitation of Fire Damaged Structure

Authors: Javed Y. Uppal

Abstract:

In this paper, a case study of a 13 storied multi storied main headquarters building of the Lahore Development Authority Lahore Pakistan has been presented, the 9th floor of which caught fire due to short circuiting and the flare spread through air-conditioning ducts to top three floors, and the building remained under fire for 15 hours before it was quenched. Some columns at the upper 3 floors started crumbling down, which were immediately propped. A visual inspection of site was first carried out, followed by onsite material tests and lab tests for residual strengths, which led to the decision of removal of the top 3 floors in a planned sequence of diamond cutting of middle strips, column strips, and shear walls, in panels and their lifting up by overhead cranes. The waffle slabs were stitched and jacketed with low viscosity polymer layer. The damaged bars were supplemented. The cracked columns were jacketed as well. The validity of rehabilitation procedure was established by load deflection behavior tests and long term performance observation over a period of 5 years. The paper concludes that the procedures adopted could be recommended for such events.

Keywords: fire damage, shotcrete, waffle slabs, delamination, drying cracking, jacketing

Procedia PDF Downloads 83
5 Uses for Closed Coal Mines: Construction of Underground Pumped Storage Hydropower Plants

Authors: Javier Menéndez, Jorge Loredo

Abstract:

Large scale energy storage systems (LSESS) such as pumped-storage hydro-power (PSH) are required in the current energy transition towards a low carbon economy by using green energies that produce low levels of greenhouse gas (GHG) emissions. Coal mines are currently being closed in the European Union and their underground facilities may be used to build PSH plants. However, the development of this projects requires the excavation of a network of tunnels and a large cavern that would be used as a powerhouse to install the Francis turbine and motor-generator. The technical feasibility to excavate the powerhouse cavern has been analyzed in the North of Spain. Three-dimensional numerical models have been conducted to analyze the stability considering shale and sandstone rock mass. Total displacements and thickness of plastic zones were examined considering different support systems. Systematic grouted rock bolts and fibre reinforced shotcrete were applied at the cavern walls and roof. The results obtained show that the construction of the powerhouse is feasible applying proper support systems.

Keywords: closed mines, mine water, numerical model, pumped-storage, renewable energies

Procedia PDF Downloads 61
4 Evaluation of Deformation for Deep Excavations in the Greater Vancouver Area Through Case Studies

Authors: Boris Kolev, Matt Kokan, Mohammad Deriszadeh, Farshid Bateni

Abstract:

Due to the increasing demand for real estate and the need for efficient land utilization in Greater Vancouver, developers have been increasingly considering the construction of high-rise structures with multiple below-grade parking. The temporary excavations required to allow for the construction of underground levels have recently reached up to 40 meters in depth. One of the challenges with deep excavations is the prediction of wall displacements and ground settlements due to their effect on the integrity of City utilities, infrastructure, and adjacent buildings. A large database of survey monitoring data has been collected for deep excavations in various soil conditions and shoring systems. The majority of the data collected is for tie-back anchors and shotcrete lagging systems. The data were categorized, analyzed and the results were evaluated to find a relationship between the most dominant parameters controlling the displacement, such as depth of excavation, soil properties, and the tie-back anchor loading and arrangement. For a select number of deep excavations, finite element modeling was considered for analyses. The lateral displacements from the simulation results were compared to the recorded survey monitoring data. The study concludes with a discussion and comparison of the available empirical and numerical modeling methodologies for evaluating lateral displacements in deep excavations.

Keywords: deep excavations, lateral displacements, numerical modeling, shoring walls, tieback anchors

Procedia PDF Downloads 141
3 A New Approach – A Numerical Assessment of Ground Strata Failure Potentials in Underground Mines

Authors: Omer Yeni

Abstract:

Ground strata failure or fall-of-ground is one of the underground mines' most prominent catastrophic risks. Mining companies use various methods/technics to prevent and critically control the associated risks. Some of those are safety by design, excavation methods, ground support, training, and competency, which all require quality control and assurance activities to confirm their efficiencies and performances and identify improvement opportunities through monitoring. However, many mining companies use quality control (QC) methods without quality assurance (QA), and they call it QA/QC together as a habit. From a simple definition, QC is a method of detecting defects, and QA is a method of preventing defects. Testing the final products at the end of the production line is not the way of proper QA/QC application but testing every component before assembly and the final product once completed. The installed ground support elements are some final products mining companies use to prevent ground strata failure. Testing the final product (i.e., rock bolt pull testing, shotcrete strength test, etc.) with QC methods only while those areas are already accessible; is not like testing an airplane full of passengers right after the production line or testing a car after the sale. Can only QC methods be called QA/QC? Can QA/QC activities be numerically scored for each critical control implemented to assess ground strata failure potential? Can numerical scores be used to identify Geotechnical Risk Rating (GRR) to determine the ground strata failure risk and its probability? This paper sets out to provide a specific QA/QC methodology to manage and confirm efficiencies and performances of the implemented critical controls and a numerical approach through the Geotechnical Risk Rating (GRR) process to assess ground strata failure risk to determine the gaps where proactive action is required to evaluate the probability of ground strata failures in underground mines.

Keywords: fall of ground, ground strata failure, QA/QC, underground

Procedia PDF Downloads 33
2 Coping with Geological Hazards during Construction of Hydroelectric Projects in Himalaya

Authors: B. D. Patni, Ashwani Jain, Arindom Chakraborty

Abstract:

The world’s highest mountain range has been forming since the collision of Indian Plate with Asian Plate 40-50 million years ago. The Indian subcontinent has been deeper and deeper in to the rest of Asia resulting upliftment of Himalaya & Tibetan Plateau. The complex domain has become a major challenge for construction of hydro electric projects. The Himalayas are geologically complex & seismically active. Shifting of Indian Plate northwardly and increasing the amount of stresses in the fragile domain which leads to deformation in the form of several fold, faults and upliftment. It is difficult to undergo extensive geological investigation to ascertain the geological problems to be encountered during construction. Inaccessibility of the terrain, high rock cover, unpredictable ground water condition etc. are the main constraints. The hydroelectric projects located in Himalayas have faced many geological and geo-hydrological problems while construction of surface and subsurface works. Based on the experience, efforts have been made to identify the expected geological problems during and after construction of the projects. These have been classified into surface and subsurface problems which include existence of inhomogeneous deep overburden in the river bed or buried valley, abrupt change in bed rock profile, Occurrences of fault zones/shear zones/fractured rock in dam foundation and slope instability in the abutments. The tunneling difficulties are many such as squeezing ground condition, popping, rock bursting, high temperature gradient, heavy ingress of water, existence of shear seams/shear zones and emission of obnoxious gases. However, these problems were mitigated by adopting suitable remedial measures as per site requirement. The support system includes shotcrete, wire mesh, rock bolts, steel ribs, fore-poling, pre-grouting, pipe-roofing, MAI anchors, toe wall, retaining walls, reinforced concrete dowels, drainage drifts, anchorage cum drainage shafts, soil nails, concrete cladding and shear keys. Controlled drilling & blasting, heading & benching, proper drainage network and ventilation system are other remedial measures adopted to overcome such adverse situations. The paper highlights the geological uncertainties and its remedial measures in Himalaya, based on the analysis and evaluation of 20 hydroelectric projects during construction.

Keywords: geological problems, shear seams, slope, drilling & blasting, shear zones

Procedia PDF Downloads 378
1 Slope Stabilisation of Highly Fractured Geological Strata Consisting of Mica Schist Layers While Construction of Tunnel Shaft

Authors: Saurabh Sharma

Abstract:

Introduction: The case study deals with the ground stabilisation of Nabi Karim Metro Station in Delhi, India, wherein an extremely complex geology was encountered while excavating the tunnelling shaft for launching Tunnel Boring Machine. The borelog investigation and the Seismic Refraction Technique (SRT) indicated towards the presence of an extremely hard rocky mass from a depth of 3-4 m itself, and accordingly, the Geotechnical Interpretation Report (GIR) concluded the presence of Grade-IV rock from 3m onwards and presence of Grade-III and better rock from 5-6m onwards. Accordingly, it was planned to retain the ground by providing secant piles all around the launching shaft and then excavating the shaft vertically after leaving a berm of 1.5m to prevent secant piles from getting exposed. To retain the side slopes, rock bolting with shotcreting and wire meshing were proposed, which is a normal practice in such strata. However, with the increase in depth of excavation, the rock quality kept on decreasing at an unexpected and surprising pace, with the Grade-III rock mass at 5-6 m converting to conglomerate formation at the depth of 15m. This worsening of geology from high grade rock to slushy conglomerate formation can never be predicted and came as a surprise to even the best geotechnical engineers. Since the excavation had already been cut down vertically to manage the shaft size, the execution was continued with enhanced cautions to stabilise the side slopes. But, when the shaft work was about to finish, a collapse was encountered on one side of the excavation shaft. This collapse was unexpected and surprising since all measures to stabilise the side slopes had been taken after face mapping, and the grid size, diameter, and depth of the rockbolts had already been readjusted to accommodate rock fractures. The above scenario was baffling even to the best geologists and geotechnical engineers, and it was decided that any further slope stabilisation scheme shall have to be designed in such a way to ensure safe completion of works. Accordingly, following revisions to excavation scheme were made: The excavation would be carried while maintaining a slope based on type of soil/rock. The rock bolt type was changed from SN rockbolts to Self Drilling type anchor. The grid size of the bolts changed on real time assessment. the excavation carried out by implementing a ‘Bench Release Approach’. Aggressive Real Time Instrumentation Scheme. Discussion: The above case Study again asserts vitality of correct interpretation of the geological strata and the need of real time revisions of the construction schemes based on the actual site data. The excavation is successfully being done with the above revised scheme, and further details of the Revised Slope Stabilisation Scheme, Instrumentation Schemes, Monitoring results, along with the actual site photographs, shall form the part of the final Paper.

Keywords: unconfined compressive strength (ucs), rock mass rating (rmr), rock bolts, self drilling anchors, face mapping of rock, secant pile, shotcrete