Search results for: project budget and gain or loss
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 9843

Search results for: project budget and gain or loss

9663 An Assessment of Vegetable Farmers’ Perceptions about Post-harvest Loss Sources in Ghana

Authors: Kofi Kyei, Kenchi Matsui

Abstract:

Loss of vegetable products has been a major constraint in the post-harvest chain. Sources of post-harvest loss in the vegetable industry start from the time of harvesting to its handling and at the various market centers. Identifying vegetable farmers’ perceptions about post-harvest loss sources is one way of addressing this issue. In this paper, we assessed farmers’ perceptions about sources of post-harvest losses in the Ashanti Region of Ghana. We also identified the factors that influence their perceptions. To clearly understand farmers’ perceptions, we selected Sekyere-Kumawu District in the Ashanti Region. Sekyere-Kumawu District is one of the major producers of vegetables in the Region. Based on a questionnaire survey, 100 vegetable farmers growing tomato, pepper, okra, cabbage, and garden egg were purposely selected from five communities in Sekyere-Kumawu District. For farmers’ perceptions, the five points Likert scale was employed. On a scale from 1 (no loss) to 5 (extremely high loss), we processed the scores for each vegetable harvest. To clarify factors influencing farmers’ perceptions, the Pearson Correlation analysis was used. Our findings revealed that farmers perceive post-harvest loss by pest infestation as the most extreme loss. However, vegetable farmers did not perceive loss during transportation as a serious source of post-harvest loss. The Pearson Correlation analysis results further revealed that farmers’ age, gender, level of education, and years of experience had an influence on their perceptions. This paper then discusses some recommendations to minimize the post-harvest loss in the region.

Keywords: Ashanti Region, pest infestation, post-harvest loss, vegetable farmers

Procedia PDF Downloads 126
9662 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 612
9661 Phylogenetic Differential Separation of Environmental Samples

Authors: Amber C. W. Vandepoele, Michael A. Marciano

Abstract:

Biological analyses frequently focus on single organisms, however many times, the biological sample consists of more than the target organism; for example, human microbiome research targets bacterial DNA, yet most samples consist largely of human DNA. Therefore, there would be an advantage to removing these contaminating organisms. Conversely, some analyses focus on a single organism but would greatly benefit from the additional information regarding the other organismal components of the sample. Forensic analysis is one such example, wherein most forensic casework, human DNA is targeted; however, it typically exists in complex non-pristine sample substrates such as soil or unclean surfaces. These complex samples are commonly comprised of not just human tissue but also microbial and plant life, where these organisms may help gain more forensically relevant information about a specific location or interaction. This project aims to optimize a ‘phylogenetic’ differential extraction method that will separate mammalian, bacterial and plant cells in a mixed sample. This is accomplished through the use of size exclusion separation, whereby the different cell types are separated through multiple filtrations using 5 μm filters. The components are then lysed via differential enzymatic sensitivities among the cells and extracted with minimal contribution from the preceding component. This extraction method will then allow complex DNA samples to be more easily interpreted through non-targeting sequencing since the data will not be skewed toward the smaller and usually more numerous bacterial DNAs. This research project has demonstrated that this ‘phylogenetic’ differential extraction method successfully separated the epithelial and bacterial cells from each other with minimal cell loss. We will take this one step further, showing that when adding the plant cells into the mixture, they will be separated and extracted from the sample. Research is ongoing, and results are pending.

Keywords: DNA isolation, geolocation, non-human, phylogenetic separation

Procedia PDF Downloads 74
9660 Residential Building Facade Retrofit

Authors: Galit Shiff, Yael Gilad

Abstract:

The need to retrofit old buildings lies in the fact that buildings are responsible for the main energy use and CO₂ emission. Existing old structures are more dominant in their effect than new energy-efficient buildings. Nevertheless not every case of urban renewal that aims to replace old buildings with new neighbourhoods necessarily has a financial or sustainable justification. Façade design plays a vital role in the building's energy performance and the unit's comfort conditions. A retrofit façade residential methodology and feasibility applicative study has been carried out for the past four years, with two projects already fully renovated. The intention of this study is to serve as a case study for limited budget façade retrofit in Mediterranean climate urban areas. The two case study buildings are set in Israel. However, they are set in different local climatic conditions. One is in 'Sderot' in the south of the country, and one is in' Migdal Hahemek' in the north of the country. The building typology is similar. The budget of the projects is around $14,000 per unit and includes interventions at the buildings' envelope while tenants are living in. Extensive research and analysis of the existing conditions have been done. The building's components, materials and envelope sections were mapped, examined and compared to relevant updated standards. Solar radiation simulations for the buildings in their surroundings during winter and summer days were done. The energy rate of each unit, as well as the building as a whole, was calculated according to the Israeli Energy Code. The buildings’ facades were documented with the use of a thermal camera during different hours of the day. This information was superimposed with data about the electricity use and the thermal comfort that was collected from the residential units. Later in the process, similar tools were further used in order to compare the effectiveness of different design options and to evaluate the chosen solutions. Both projects showed that the most problematic units were the ones below the roof and the ones on top of the elevated entrance floor (pilotis). Old buildings tend to have poor insulation on those two horizontal surfaces which require treatment. Different radiation levels and wall sections in the two projects influenced the design strategies: In the southern project, there was an extreme difference in solar radiations levels between the main façade and the back elevation. Eventually, it was decided to invest in insulating the main south-west façade and the side façades, leaving the back north-east façade almost untouched. Lower levels of radiation in the northern project led to a different tactic: a combination of basic insulation on all façades, together with intense treatment on areas with problematic thermal behavior. While poor execution of construction details and bad installation of windows in the northern project required replacing them all, in the southern project it was found that it is more essential to shade the windows than replace them. Although the buildings and the construction typology was chosen for this study are similar, the research shows that there are large differences due to the location in different climatic zones and variation in local conditions. Therefore, in order to reach a systematic and cost-effective method of work, a more extensive catalogue database is needed. Such a catalogue will enable public housing companies in the Mediterranean climate to promote massive projects of renovating existing old buildings, drawing on minimal analysis and planning processes.

Keywords: facade, low budget, residential, retrofit

Procedia PDF Downloads 160
9659 Water Budget in High Drought-Borne Area in Jaffna District, Sri Lanka during Dry Season

Authors: R. Kandiah, K. Miyamoto

Abstract:

In Sri Lanka, the Jaffna area is a high drought affected area and depends mainly on groundwater aquifers for water needs. Water for daily activities is extracted from wells. As households manually extract water from the wells, it is not drawn from mid evening to early morning. The water inflow at night provides the maximum water level that decreases during the daytime due to extraction. The storage volume of water in wells is limited or at its lowest level during the dry season. This study analyzes the domestic water budget during the dry season in the Jaffna area. In order to evaluate the water inflow rate into wells, storage volume and extraction volume from wells over time, water pressure is measured at the bottom of three wells, which are located in coastal area denoted as well A, in nonspecific area denoted as well B, and agricultural area denoted as well C. The water quality at the wells A, B, and C, are mostly fresh, modest fresh, and saline respectively. From the monitoring, we can find that the daily inflow amount of water into the wells and daily water extraction depend on each other, that is, higher extraction yields higher inflow. And, in the dry season, the daily inflow volume and the daily extraction volume of each well are almost in balance.

Keywords: accessible volume, consumption volume, inflow rate, water budget

Procedia PDF Downloads 331
9658 Agile Project Management: A Real Application in a Multi-Project Research and Development Center

Authors: Aysegul Sarac

Abstract:

The aim of this study is to analyze the impacts of integrating agile development principles and practices, in particular to reduce project lead time in a multi-project environment. We analyze Arçelik Washing Machine R&D Center in which multiple projects are conducted by shared resources. In the first part of the study, we illustrate the current waterfall model system by using a value stream map. We define all activities starting from the first idea of the project to the customer and measure process time and lead time of projects. In the second part of the study we estimate potential improvements and select a set of these improvements to integrate agile principles. We aim to develop a future state map and analyze the impacts of integrating lean principles on project lead time. The main contribution of this study is that we analyze and integrate agile product development principles in a real multi-project system.

Keywords: agile project management, multi project system, project lead time, product development

Procedia PDF Downloads 266
9657 Manufacturing of Race Car Case Study AGH Racing

Authors: Hanna Faron, Wojciech Marcinkowski, Daniel Prusak

Abstract:

The aim of this article is to familiarize with the activity of AGH Racing scientific circle, pertaining to the international project -Formula Student, giving the opportunity to young engineers from all around the world to validate their talent and knowledge in the real world conditions, under the pressure of time, and the design requirements. Every year, the team begins the process of building a race car from the formation of human resources. In case of the public sector, to which public universities can be included, the scientific circles represent the structure uniting students with the common interests and level of determination. Due to the scientific nature of the project which simulates the market conditions, they have a chance to verify previously acquired knowledge in practice. High level of the innovation and competitiveness of participating in the project Formula Student teams, requires an intelligent organizational system, which is characterized by a high dynamics. It is connected with the necessity of separation of duties, setting priorities, selecting optimal solutions which is often a compromise between the available technology and a limited budget. Proper selection of the adequate guidelines in the design phase allows an efficient transition to the implementation stage, which is process-oriented implementation of the project. Four dynamic and three static competitions are the main verification and evaluation of year-round work and effort put into the process of building a race car. Acquired feedback flowing during the race is a very important part while monitoring the effectiveness of AGH Racing scientific circle, as well as the main criterion while determining long-term goals and all the necessary improvements in the team.

Keywords: SAE, formula student, race car, public sector, automotive industry

Procedia PDF Downloads 308
9656 Efficient Model Selection in Linear and Non-Linear Quantile Regression by Cross-Validation

Authors: Yoonsuh Jung, Steven N. MacEachern

Abstract:

Check loss function is used to define quantile regression. In the prospect of cross validation, it is also employed as a validation function when underlying truth is unknown. However, our empirical study indicates that the validation with check loss often leads to choosing an over estimated fits. In this work, we suggest a modified or L2-adjusted check loss which rounds the sharp corner in the middle of check loss. It has a large effect of guarding against over fitted model in some extent. Through various simulation settings of linear and non-linear regressions, the improvement of check loss by L2 adjustment is empirically examined. This adjustment is devised to shrink to zero as sample size grows.

Keywords: cross-validation, model selection, quantile regression, tuning parameter selection

Procedia PDF Downloads 395
9655 Increasing of Gain in Unstable Thin Disk Resonator

Authors: M. Asl. Dehghan, M. H. Daemi, S. Radmard, S. H. Nabavi

Abstract:

Thin disk lasers are engineered for efficient thermal cooling and exhibit superior performance for this task. However the disk thickness and large pumped area make the use of this gain format in a resonator difficult when constructing a single-mode laser. Choosing an unstable resonator design is beneficial for this purpose. On the other hand, the low gain medium restricts the application of unstable resonators to low magnifications and therefore to a poor beam quality. A promising idea to enable the application of unstable resonators to wide aperture, low gain lasers is to couple a fraction of the out coupled radiation back into the resonator. The output coupling gets dependent on the ratio of the back reflection and can be adjusted independently from the magnification. The excitation of the converging wave can be done by the use of an external reflector. The resonator performance is numerically predicted. First of all the threshold condition of linear, V and 2V shape resonator is investigated. Results show that the maximum magnification is 1.066 that is very low for high quality purposes. Inserting an additional reflector covers the low gain. The reflectivity and the related magnification of a 350 micron Yb:YAG disk are calculated. The theoretical model was based on the coupled Kirchhoff integrals and solved numerically by the Fox and Li algorithm. Results show that with back reflection mechanism in combination with increasing the number of beam incidents on disk, high gain and high magnification can occur.

Keywords: unstable resonators, thin disk lasers, gain, external reflector

Procedia PDF Downloads 373
9654 Effects of Eggs Storage Period and Layer Hen Age on Eggs Hatchability and Weight of Broilers of Breed Ross

Authors: Alipanah Masoud, Sheihkei Iman

Abstract:

One day old chicken quality has great deal of contributions in increasing daily weight gain as well as economical productivity of broilers production. On the other hand, eggs are kept in different times in layer hens flocks and subsequently are transported to incubation units. In order to evaluate effects of two factors layer hen age and storage period of eggs on one day old broilers weight gain during feeding, eggs for layer hen gathered on 32 weeks old (young hen) and 74 weeks old (older ones) were used. Storage period for samples was set as 1 and 9 days. Data were analysed in completely randomized design in four replicates by software SAS. Results indicated that one day old broiler chickens from young had less weight gain, although they exhibited higher weight gain during next weeks. At the same time, there was no difference between chickens from eggs stored for nine days and those from stored for one day.

Keywords: egg, chicken, hatchability, layer

Procedia PDF Downloads 365
9653 Hybrid Project Management Model Based on Lean and Agile Approach

Authors: Fatima-Zahra Eddoug, Jamal Benhra, Rajaa Benabbou

Abstract:

Several project management models exist in the literature and the most used ones are the hybrids for their multiple advantages. Our objective in this paper is to analyze the existing models, which are based on the Lean and Agile approaches and to propose a novel framework with the convenient tools that will allow efficient management of a general project. To create the desired framework, we were based essentially on 7 existing models. Only the Scrum tool among the agile tools was identified by several authors to be appropriate for project management. In contrast, multiple lean tools were proposed in different phases of the project.

Keywords: agility, hybrid project management, lean, scrum

Procedia PDF Downloads 99
9652 Empirical Study for the Project and the Project Management Dimensions Comparison between SMEs and Large Companies

Authors: Amina Oukennou, Zitouni Beidouri, Otmane Bouksour

Abstract:

Small to Medium-sized enterprises are a very important component of the economy. They are present in the whole industries all over the world. They are considered as the engine for future growth in the economy. Project management is an economical international factor impacting all types of enterprises including the SMEs. This paper has the aim of measuring the weight of using projects and project management in Moroccan SMEs in comparison with the large companies. The study is based on interviews with experts: project managers, managers, directors, and consultants. They were asked questions measuring the weight of using projects, the level of using project management, and the resources employed. Eighteen Moroccan companies from a range of industries and sizes were consulted. All the companies consider projects as a key element in their strategy. Most of them affirm the great usefulness of the approach 'project', especially for the external activities. The main differences lie in the duration and the size of used projects. Despite the commonly shared idea about the importance of the project management, the interviewed persons believe that the project management knowledge has the same importance or less than the technical knowledge. All the companies affirm the need for a simpler version of project management. The content varies from one company to another.

Keywords: project dimension, project management, small to medium-sized entreprise, Morocco

Procedia PDF Downloads 268
9651 Project Management Agile Model Based on Project Management Body of Knowledge Guideline

Authors: Mehrzad Abdi Khalife, Iraj Mahdavi

Abstract:

This paper presents the agile model for project management process. For project management process, the Project Management Body of Knowledge (PMBOK) guideline has been selected as platform. Combination of computational science and artificial intelligent methodology has been added to the guideline to transfer the standard to agile project management process. The model is the combination of practical standard, computational science and artificial intelligent. In this model, we present communication model and protocols to keep process agile. Here, we illustrate the collaboration man and machine in project management area with artificial intelligent approach.

Keywords: artificial intelligent, conceptual model, man-machine collaboration, project management, standard

Procedia PDF Downloads 297
9650 Effect of Wind and Humidity on Microwave Links in West North Libya

Authors: M. S. Agha, A. M. Eshahiry, S. A. Aldabbar, Z. M. Alshahri

Abstract:

The propagation of microwave is affected by rain and dust particles by way of signal attenuation and de-polarization. Computations of these effects require knowledge of the propagation characteristics of microwave and millimeter wave energy in the climate conditions of the studied region. This paper presents the effect of wind and humidity on wireless communication such as microwave links in the west north region of Libya (Al-Khoms), experimental procedure to study the effects mentioned above. The experimental procedure is done on three selected antennae towers (Nagaza stations, Al-Khoms center stations, Al-Khoms gateway stations) to determining of the attenuation loss per unit length and cross-polarization discrimination (XPD) change which coverage in the studied region, it is required to collect the dust particles carried out by the wind, measure the particles size distribution (PSD), calculate the concentration, and carry chemical analysis of the contents, then the dielectric constant can be calculated. The result showed that effect of the humidity and dust, the antenna height, the visibility, on the complex permittivity effects both attenuation and phase shift, there is some consideration that has to be taken into account in the communication power budget.

Keywords: attenuation, de-polarization, scattering, transmission loss

Procedia PDF Downloads 117
9649 Critical Factors Influencing Effective Communication Among Stakeholders on Construction Project Delivery in Jigawa State, Nigeria

Authors: Shazali Abdulahi

Abstract:

Project planning is the first phase in project life cycle which relates to the use of schedules such as Gantt charts to plan and subsequently report the project progress within the project environment. Likewise, project execution is the third phase in project lifecycle, is the phase where the work of the project must get done correctly and it’s the longest phase in the project lifecycle therefore, they must be effectively communicated, now today Communication has become the crucial element of every organization. During construction project delivery, information needs to be accurately and timely communicating among project stakeholders in order to realize the project objective. Effective communication among stakeholders during construction project delivery is one of the major factors that impact construction project delivery. Therefore, the aim of the research work is to examine the critical factors influencing effective communication among stakeholders on construction project delivery from the perspective of construction professionals (Architects, Builders, Quantity surveyors, and Civil engineers). A quantitative approach was adopted. This entailed the used of structured questionnaire to one (108) construction professionals in public and private organization within dutse metropolis. Frequency, mean, ranking and multiple linear regression using SPSS vision 25 software were used to analyses the data. The results show that Leadership, Trust, Communication tools, Communication skills, Stakeholders involvement, Cultural differences, and Communication technology were the most critical factors influencing effective communication among stakeholders on construction project delivery. The hypothesis revealed that, effective communication among stakeholders has significant effects on construction project delivery. This research work will profit the construction stakeholders in construction industry, by providing adequate knowledge regarding the factors influencing effective communication among stakeholders, so that necessary steps to be taken to improve project performance. Also, it will provide knowledge about the appropriate strategies to employ in order to improve communication among stakeholders.

Keywords: effetive communication, ineffective communication, stakeholders, project delivery

Procedia PDF Downloads 5
9648 The Management of Media Literacy Development for Thai Students

Authors: Supranee Wattanasin

Abstract:

The purpose of this research was to enhance student’s media literacy. The process was divided into 4 periods: the first phase was to hold the meeting for 100 representatives from various institutions in Thailand; the second phase allowed them to design activities to be used in their institutions; the third implemented activities to reach other target groups; and the last phase was to summarize results. It was found that the participants had clear understanding on media literacy. They knew well about the media. In other words, they knew the difference between creative media and bad ones. Students could use analytical process when searching for information. Thus, the project enabled the students to use analytical thinking skills in designing new activities. Therefore, they could creatively integrate Thai folk song with short movies and cartoons. To increase students’ media literacy, there should be chances for them to gain first-hand experience.

Keywords: media literacy, mechanism development, youth, project radio-television

Procedia PDF Downloads 217
9647 Seasonal and Species Variations in Incidence of Foetal Loss at the Maiduguri Abattoir in Northern Nigeria

Authors: Abdulrazaq O. Raji, Abba Mohammed, Ibrahim D. Mohammed

Abstract:

This study was conducted to investigate foetal loss among slaughtered livestock species at the Maiduguri abattoir from 2009 to 2013. Record of animals slaughtered monthly and fetuses recovered were collected from the management of the Maiduguri abattoir. Data was subjected to Analysis of Variance using the General Linear Model of SPSS 13.0 with Season, Species and their interaction as fixed factors. Average yearly slaughter at the Maiduguri abattoir was 63,225 animals with cattle, camel, goat and sheep accounting for 19737, 7374, 19281 and 17540 of the total. The corresponding number of those pregnant were 3117, 839, 2281 and 2432 out of a total of 8522 animals. Thus, cattle, camel, goat and sheep accounted for 30.87, 11.53, 30.16 and 27.44%, respectively of the animals slaughtered at the Abattoir and 35.96, 9.68, 26.31 and 28.05% of the foetal loss. The effect of season and species on foetal loss was significant (P < 0.05). The number of pregnant animals slaughtered and foetal loss were higher during wet than dry season. Similarly, foetal loss at the abattoir was higher in the month of May in respect of camel, goat and sheep, and August for cattle. Camel was the least slaughtered animal and had the least number of pregnant females. Foetal loss (%) was higher (P < 0.05) for cattle compared to other species. The interaction showed that camel was the least slaughtered species in both seasons and cattle in the wet season had the highest foetal loss.

Keywords: abattoir, foetal loss, season, species

Procedia PDF Downloads 487
9646 Efficiency, Effectiveness, and Technological Change in Armed Forces: Indonesian Case

Authors: Citra Pertiwi, Muhammad Fikruzzaman Rahawarin

Abstract:

Government of Indonesia had committed to increasing its national defense the budget up to 1,5 percent of GDP. However, the budget increase does not necessarily allocate efficiently and effectively. Using Data Envelopment Analysis (DEA), the operational units of Indonesian Armed Forces are considered as a proxy to measure those two aspects. The bootstrap technique is being used as well to reduce uncertainty in the estimation. Additionally, technological change is being measured as a nonstationary component. Nearly half of the units are being estimated as fully efficient, with less than a third is considered as effective. Longer and larger sets of data might increase the robustness of the estimation in the future.

Keywords: bootstrap, effectiveness, efficiency, DEA, military, Malmquist, technological change

Procedia PDF Downloads 267
9645 Technical and Economic Analysis Effects of Various Parameters on the Performance of Heat Recovery System on Gas Complex Turbo Generators

Authors: Hefzollah Mohammadian, Mohammad Bagher Heidari

Abstract:

This paper deals with the technical and economic effects of various parameters on the performance of heat recovery system on gas complex turbo generator. Given the importance of this issue, that is the main goal of economic efficiency and reduces costs; this project has been implemented similar plans in which the target is the implementation of specific patterns. The project will also help us in the process of gas refineries and the actual efficiency of the process after adding a system to analyze the turbine and predict potential problems and fix them and take appropriate measures according to the results of simulation analysis and results of the process gain. The results of modeling and the effect of different parameters on this line, have been done using Thermo Flow.

Keywords: turbo compressor, turbo generator, heat recovery boiler, gas turbines

Procedia PDF Downloads 265
9644 Four-dimensional (4D) Decoding Information Presented in Reports of Project Progress in Developing Countries

Authors: Vahid Khadjeh Anvary, Hamideh Karimi Yazdi

Abstract:

Generally, the tool of comparison between performance of each stage in the life of a project, is the number of project progress during that period, which in most cases is only determined as one-dimensional with referring to one of three factors (physical, time, and financial). In many projects in developing countries there are controversies on accuracy and the way of analyzing progress report of projects that hinders getting definitive and engineering conclusions on the status of project.Identifying weakness points of this kind of one-dimensional look on project and determining a reliable and engineering approach for multi-dimensional decoding information receivable from project is of great importance in project management.This can be a tool to help identification of hidden diseases of project before appearing irreversible symptoms that are usually delays or increased costs of execution. The method used in this paper is defining and evaluating a hypothetical project as an example analyzing different scenarios and numerical comparison of them along with related graphs and tables. Finally, by analyzing different possible scenarios in the project, possibility or impossibility of predicting their occurrence is examine through the evidence.

Keywords: physical progress, time progress, financial progress, delays, critical path

Procedia PDF Downloads 334
9643 Weight Gain After Total Thyroidectomy

Authors: Yong Seong Kim, Seongbin Hong, So Hun Kim, Moonsuk Nam

Abstract:

Background: Patients who undergo thyroidectomy due to thyroid cancer often complain weight gain, although they are on suppressive thyroid hormone treatment. The aim of this study is to know whether thyroid cancer patients gain the weight after thyroidectomy and weight change is dependent on estrogen state or use of rhTSH. Material and Method: We performed a retrospective chart review of subjects receiving medical care at an academic medical center. Two hundred two patients who underwent total thyroidectomy were included. As a control group, patients with thyroid nodule and euthyroidism were matched for age, gender, menopausal status. The weight changes occurring over first one year and thyroid function were assessed. Results: Mean age was 51±12 years and patients was composed with 38% of premenopausal, 15 % perimenopausal women, 37% of postmenopausal women and 20% of men. Patients with thyroid cancer gained 2.2 kg during the first year. It’ was not significantly different with control. However, weigh change in perimenopausal and post menopausal women gained more weight than control (P <0.05). Age, baseline body weight and weight gain were not correlated. Discussion: Patient who had undergone thyroidectomy gained more weight than their control, especially in peri- and postmenopausal women. Patients in this age should be monitored for their weight carefully.

Keywords: weight gain, thyroidectomy, thyroid cancer, weight chance

Procedia PDF Downloads 376
9642 Assessing Project Performance through Work Sampling and Earned Value Analysis

Authors: Shobha Ramalingam

Abstract:

The majority of the infrastructure projects are affected by time overrun, resulting in project delays and subsequently cost overruns. Time overrun may vary from a few months to as high as five or more years, placing the project viability at risk. One of the probable reasons noted in the literature for this outcome in projects is due to poor productivity. Researchers contend that productivity in construction has only marginally increased over the years. While studies in the literature have extensively focused on time and cost parameters in projects, there are limited studies that integrate time and cost with productivity to assess project performance. To this end, a study was conducted to understand the project delay factors concerning cost, time and productivity. A case-study approach was adopted to collect rich data from a nuclear power plant project site for two months through observation, interviews and document review. The data were analyzed using three different approaches for a comprehensive understanding. Foremost, a root-cause analysis was performed on the data using Ishikawa’s fish-bone diagram technique to identify the various factors impacting the delay concerning time. Based on it, a questionnaire was designed and circulated to concerned executives, including project engineers and contractors to determine the frequency of occurrence of the delay, which was then compiled and presented to the management for a possible solution to mitigate. Second, a productivity analysis was performed on select activities, including rebar bending and concreting through a time-motion study to analyze product performance. Third, data on cost of construction for three years allowed analyzing the cost performance using earned value management technique. All three techniques allowed to systematically and comprehensively identify the key factors that deter project performance and productivity loss in the construction of the nuclear power plant project. The findings showed that improper planning and coordination between multiple trades, concurrent operations, improper workforce and material management, fatigue due to overtime were some of the key factors that led to delays and poor productivity. The findings are expected to act as a stepping stone for further research and have implications for practitioners.

Keywords: earned value analysis, time performance, project costs, project delays, construction productivity

Procedia PDF Downloads 59
9641 Strategies Employed to Enhance Floriculture Production for Masvingo City Residents’ Livelihood Improvement

Authors: Jotham Mazhura

Abstract:

Floriculture production is an ideal project for sustainable horticultural production in Masvingo city.Gender links in collaboration with the embasy of Sweedenare supporting the floriculture project with the aim of improving residents livelihoods in the city.World trade in floriculture such as cut flowers,live ornamental plants and foliage continue to increase and there are recognised markets opportunities across the globe.Some specific opportunitiesin an interview discussion by the consultant appointed by gender links and embasy of Sweeden highlightedsome constraints and opportunities in the project of floriculture in Masvingo city.Based on the outcome of the scoping studies this research project developed and evaluated strategies for enhancing floriculture production in Masvingo city. A survey was therefore carried out by the researcher among the existing florists farmers in the city to determine strategies to be employed to improve floriculture production.The survey was conducted to twenty florists in the city.The sample was taken by using purposive sampling which is a sampling technique based on the certain considerations, hence there were some basic creteria in selecting samples. A questionnaire in this aspect was administered to the 20 florists to determine the essential strategies to be employed to enhance floriculture production.Each respondent was given data for the business strategies and asked to rank those strategies from the most to the least important.From the research findings the following were revealed out by the respondents that is capturing marketshare,establishment of of ownership of the project,the project manager to be innovative,the business should gain competitive strategic through generic strategies market development strategy and product development strategy. Based on the observation and structured interview with respondents the average of floriculture owners had similar strategies implemented on their business.The research proved that floriculture farmers use various strategies to keep their businesses running and succeding in achieving set goals.Therefore the ressearche who happens to be the project focal person became certain that it is edeal to emply a variety of of strategies to improve floriculture oproduction

Keywords: florist, floriculture, strategy, livelihoods

Procedia PDF Downloads 36
9640 Soil Loss Assessment at Steep Slope: A Case Study at the Guthrie Corridor Expressway, Selangor, Malaysia

Authors: Rabiul Islam

Abstract:

The study was in order to assess soil erosion at plot scale Universal Soil Loss Equation (USLE) erosion model and Geographic Information System (GIS) technique have been used for the study 8 plots in Guthrie Corridor Expressway, Selangor, Malaysia. The USLE model estimates an average soil loss soil integrating several factors such as rainfall erosivity factor(R ), Soil erodibility factor (K), slope length and steepness factor (LS), vegetation cover factor as well as conservation practice factor (C &P) and Results shows that the four plots have very low rates of soil loss, i.e. NLDNM, NDNM, PLDM, and NDM having an average soil loss of 0.059, 0.106, 0.386 and 0.372 ton/ha/ year, respectively. The NBNM, PLDNM and NLDM plots had a relatively higher rate of soil loss, with an average of 0.678, 0.757 and 0.493ton/ha/year. Whereas, the NBM is one of the highest rate of soil loss from 0.842 ton/ha/year to maximum 16.466 ton/ha/year. The NBM plot was located at bare the land; hence the magnitude of C factor(C=0.15) was the highest one.

Keywords: USLE model, GIS, Guthrie Corridor Expressway (GCE), Malaysia

Procedia PDF Downloads 487
9639 Effect of Wind and Humidity on Microwave Links in Al-Khoms City-Libya

Authors: Mustafa S. Agha, Asma M. Eshahriy

Abstract:

The propagation of electromagnetic waves in millimeter band is severely affected by rain, and dust particles in terms of attenuation and de-polarization. The computations of dust and/or sand storms require knowledge of electrical properties of the scattering particles and climate conditions at the studied region in the west north region of Libya. (Al -Khoms) To compute the effect of dust and sand particles on the propagation of electromagnetic waves, it is required to collect the sand particles carried out by the wind, measure the particles size distribution (PSD), calculate the concentration, and carry chemical analysis of the contents, then the dielectric constant can be calculated. The main object of this paper is to study the effect of sand and dust storms on wireless communication, such as microwave links, in the north region of Libya (Al -Khoms) of Libya (Nagaza stations, Al-khoms center stations, Al-khoms gateway stations) by determining of the attenuation loss per unit length and cross-polarization discrimination (XPD) change due to the effect of sand and dust storms on wireless communication systems (GSM signal). The result showed that there is some consideration that has to be taken into account in the communication power budget .

Keywords: attenuation, scattering, transmission loss, electromagnetic waves

Procedia PDF Downloads 398
9638 Resilience among Children with and without Hearing Loss: A Comparative Study in Pakistan

Authors: Bushra Akram, Amina Tariq

Abstract:

Objective: This cross-sectional descriptive study aimed to compare the level of resilience among children with and without hearing loss. Methodology: In this descriptive cross sectional study total 500 children (with hearing loss = 250 and without hearing loss = 250) were recruited conveniently. Children with hearing loss were recruited from the special schools whereas children without hearing loss were selected from regular schools located in cities of Gujrat and Jhelum of Pakistan. Respondents’ age ranged from 9-14 years. Resiliency scale named RSCA (Resiliency Scales for children and adolescents) developed by Sandra Prince Embury (2006) was used. RSCA consist of three core theoretical areas: MAS (Sense of Mastery Scale), REL (Sense of Relatedness Scale) and REA (Emotional Reactivity Scale). Results: Findings indicated that there was a significant difference in the resilience level of participants with and without hearing loss. The mean comparison showed that the children with hearing loss showed lower scores on MAS (X̅ = 43.32, SD = 7.55) as well as on REL (X̅ = 49.96, SD = 7.65) as compared to their counterparts on MAS (X̅ = 53.96, SD = 9.90, t= -7.31***) and on REL (X̅ = 68.43, SD = 14.57,t= -10.18***). However children with hearing loss showed higher scores on REA (X̅ = 42.12, SD = 5.84) as compared to hearing participants (X̅ = 28.84, SD = 13.97, t = -8.20***). The findings revealed no significance difference in the resilience level of hearing and deaf children on the basis of their gender and age. Research Outcomes and Future Scope: Children with hearing loss showed a lower level of resilience, therefore, needs a program to develop resilience for better social-emotional adjustment and enhancement of their psychological well-being. In the end, the researcher gave recommendations for future research.

Keywords: children with hearing loss, psychological Wellbeing, resiliency scales for children and adolescents, resilience

Procedia PDF Downloads 139
9637 Application of De Novo Programming Approach for Optimizing the Business Process

Authors: Z. Babic, I. Veza, A. Balic, M. Crnjac

Abstract:

The linear programming model is sometimes difficult to apply in real business situations due to its assumption of proportionality. This paper shows an example of how to use De Novo programming approach instead of linear programming. In the De Novo programming, resources are not fixed like in linear programming but resource quantities depend only on available budget. Budget is a new, important element of the De Novo approach. Two different production situations are presented: increasing costs and quantity discounts of raw materials. The focus of this paper is on advantages of the De Novo approach in the optimization of production plan for production company which produces souvenirs made from famous stone from the island of Brac, one of the greatest islands from Croatia.

Keywords: business process, De Novo programming, optimizing, production

Procedia PDF Downloads 176
9636 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 223
9635 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 380
9634 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 127