Search results for: project budget and gain or loss
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 9879

Search results for: project budget and gain or loss

9609 Bridging Minds, Building Success Beyond Metrics: Uncovering Human Influence on Project Performance: Case Study of University of Salford

Authors: David Oyewumi Oyekunle, David Preston, Florence Ibeh

Abstract:

The paper provides an overview of the impacts of the human dimension in project management and team management on projects, which is increasingly affecting the performance of organizations. Recognizing its crucial significance, the research focuses on analyzing the psychological and interpersonal dynamics within project teams. This research is highly significant in the dynamic field of project management, as it addresses important gaps and offers vital insights that align with the constantly changing demands of the profession. A case study was conducted at the University of Salford to examine how human activity affects project management and performance. The study employed a mixed methodology to gain a deeper understanding of the real-world experiences of the subjects and project teams. Data analysis procedures to address the research objectives included the deductive approach, which involves testing a clear hypothesis or theory, as well as descriptive analysis and visualization. The survey comprised a sample size of 40 participants out of 110 project management professionals, including staff and final students in the Salford Business School, using a purposeful sampling method. To mitigate bias, the study ensured diversity in the sample by including both staff and final students. A smaller sample size allowed for more in-depth analysis and a focused exploration of the research objective. Conflicts, for example, are intricate occurrences shaped by a multitude of psychological stimuli and social interactions and may have either a deterrent perspective or a positive perspective on project performance and project management productivity. The study identified conflict elements, including culture, environment, personality, attitude, individual project knowledge, team relationships, leadership, and team dynamics among team members, as crucial human activities to minimize conflict. The findings are highly significant in the dynamic field of project management, as they address important gaps and offer vital insights that align with the constantly changing demands of the profession. It provided project professionals with valuable insights that can help them create a collaborative and high-performing project environment. Uncovering human influence on project performance, effective communication, optimal team synergy, and a keen understanding of project scope are necessary for the management of projects to attain exceptional performance and efficiency. For the research to achieve the aims of this study, it was acknowledged that the productive dynamics of teams and strong group cohesiveness are crucial for effectively managing conflicts in a beneficial and forward-thinking manner. Addressing the identified human influence will contribute to a more sustainable project management approach and offer opportunities for exploration and potential contributions to both academia and practical project management.

Keywords: human dimension, project management, team dynamics, conflict resolution

Procedia PDF Downloads 34
9608 Evaluation of Expected Annual Loss Probabilities of RC Moment Resisting Frames

Authors: Saemee Jun, Dong-Hyeon Shin, Tae-Sang Ahn, Hyung-Joon Kim

Abstract:

Building loss estimation methodologies which have been advanced considerably in recent decades are usually used to estimate socio and economic impacts resulting from seismic structural damage. In accordance with these methods, this paper presents the evaluation of an annual loss probability of a reinforced concrete moment resisting frame designed according to Korean Building Code. The annual loss probability is defined by (1) a fragility curve obtained from a capacity spectrum method which is similar to a method adopted from HAZUS, and (2) a seismic hazard curve derived from annual frequencies of exceedance per peak ground acceleration. Seismic fragilities are computed to calculate the annual loss probability of a certain structure using functions depending on structural capacity, seismic demand, structural response and the probability of exceeding damage state thresholds. This study carried out a nonlinear static analysis to obtain the capacity of a RC moment resisting frame selected as a prototype building. The analysis results show that the probability of being extensive structural damage in the prototype building is expected to 0.004% in a year.

Keywords: expected annual loss, loss estimation, RC structure, fragility analysis

Procedia PDF Downloads 374
9607 The Analysis of Education Sector and Poverty Alleviation with Benefit Incidence Analysis Approach Budget Allocation Policy in East Java

Authors: Wildan Syafitri

Abstract:

The main purpose of the development is to embody public welfare. Its indication is shown by the increasing of the public prosperity in which it will be related to the consumption level as a consequence of the increasing of public income. One of the government’s efforts to increase public welfare is to create development equity in order to alleviate poor people. Poverty’s problem is not merely about the number and percentage of the poor people, but also it includes the gap and severity of poverty.the analysis method used is Benefit Incidence Analysis (BIA) that is an analysis method used to disclose the impact of government policy or individual access based on the income distribution in society. Further, the finding of the study revealed is that the highest number of the poor people in the village is those who are unemployed and have family members who are still in the Junior High School. The income distribution calculation shows a fairly good budget allocation applied with good mass ratio that is 0.31. In addition, the finding of this study also discloses that Indonesian Government policy to subsidize education cost for Elementary and Junior High School students has reached the right target. It is indicated by more benefits received by Elementary and Junior High School students who are poor and very poor than other income group.

Keywords: benefit incidence analysis, budget allocation, poverty, education

Procedia PDF Downloads 358
9606 Overcoming the Impacts of Covid-19 Outbreak Using Value Integrated Project Delivery Model

Authors: G. Ramya

Abstract:

Value engineering is a systematic approach, widely used to optimize the design or process or product in the designing stage. It used to achieve the client's obligation by increasing the functionality and attain the targeted cost in the cost planning. Value engineering effectiveness and benefits decrease along with the progress of the project since the change in the scope of the work and design will account for more cost all along the lifecycle of the project. Integrating the value engineering with other project management activities will promote cost minimization, client satisfaction, and ensure early completion of the project in time. Previous research studies suggested that value engineering can integrate with other project delivery activities, but research studies unable to frame a model that collaborates the project management activities with the job plan of value engineering approach. I analyzed various project management activities and their synergy between each other. The project management activities and processes like a)risk analysis b)lifecycle cost analysis c)lean construction d)facility management e)Building information modelling f)Contract administration, collaborated, and project delivery model planned along with the RIBA plan of work. The key outcome of the research is a value-driven project delivery model, which will succeed in dealing with the economic impact, constraints and conflicts arise due to the COVID-19 outbreak in the Indian construction sector. Benefits associated with the structured framework is construction project delivery that ensures early contractor involvement, mutual risk sharing, and reviving the project with a cost overrun and delay back on track ,are discussed. Keywords: Value-driven project delivery model, Integration, RIBA plan of work Themes: Design Economics

Keywords: value-driven project delivery model, Integration, RIBA

Procedia PDF Downloads 91
9605 Improving the Constructability of Highway Design Plans

Authors: R. Edward Minchin Jr.

Abstract:

The U.S. Federal Highway Administration (FHWA) Every Day Counts Program (EDC) has resulted in state DOTs putting evermore emphasis on speeding up the delivery of highway and bridge construction projects for use by the driving public. This has resulted in an increase in the use of alternative construction delivery systems such as design-build (D-B), construction manager at-risk (CMR) or construction manager/general contractor (CM/GC), and adding alternative technical concepts (ATCs) to traditional design-bid-build (DBB) contracts. ATCs have exhibited great potential for delivering substantial benefits like cost savings, increased constructability, and quicker project delivery. Previous research has found that knowledge of project constructability was lacking in state Department of Transportation (DOT) planning, programming, and environmental staffs. Many agencies have therefore relied on a set of ‘acceptable’ design solutions over the years of working with their local resource agencies. The result is that the permitting process for several government agencies has become increasingly restrictive with the result that the DOTs and their industry partners lose the ability to innovate after a permit is approved. The intent of this paper is to report on the research team’s progress in this ongoing effort furnish the United States government with a uniform set of guidelines for the application of constructability reviews during all phases of project development and delivery. The research uses surveys and interviews to determine which states have implemented formal programs to ensure that the constructor is furnished with a set of contract documents that affords said constructor with the best possible opportunity to successfully construct the project with the highest quality standards, within the contract duration and without exceeding the construction budget. Once these states are identified, workshops are held all over the nation, resulting in the team learning the best current practices and giving the team the ability to recommend new practices that will improve the process. The plan is for the FHWA to encourage or require state DOTs to use these practices on all federally funded highway and bridge construction projects. The project deliverable is a Guidebook for FHWA to use in disseminating the recommended practices to the states.

Keywords: alternative construction delivery, alternative technical concepts, constructability, construction design plans

Procedia PDF Downloads 167
9604 A Study on the Current State and Policy Implications of Engineer Operated National Research Facility and Equipment in Korea

Authors: Chang-Yong Kim, Dong-Woo Kim, Whon-Hyun Lee, Yong-Joo Kim, Tae-Won Chung, Kyung-Mi Lee, Han-Sol Kim, Eun-Joo Lee, Euh Duck Jeong

Abstract:

In the past, together with the annual increase in investment on national R&D projects, the government’s budget investment in FE has steadily maintained. In the case of major developed countries, R&D and its supporting works are distinguished and professionalized in their own right, in so far as having a training system for facilities, equipment operation, and maintenance personnel. In Korea, however, research personnel conduct both research and equipment operation, leading to quantitative shortages of operational manpower and qualitative problems due to insecure employment such as maintenance issues or the loss of effectiveness of necessary equipment. Therefore, the purpose of this study was to identify the current status of engineer operated national research FE in Korea based on a 2017 survey results of domestic facilities and to suggest policy implications. A total of 395 research institutes that carried out national R&D projects and registered more than two FE since 2005 were surveyed on-line for two months. The survey showed that 395 non-profit research facilities were operating 45,155 pieces of equipment with 2,211 engineer operated national research FE, meaning that each engineer had to manage 21 items of FE. Among these, 43.9% of the workers were employed in temporary positions, including indefinite term contracts. Furthermore, the salary and treatment of the engineer personnel were relatively low compared to researchers. In short, engineers who exclusively focused on managing and maintaining FE play a very important role in increasing research immersion and obtaining highly reliable research results. Moreover, institutional efforts and government support for securing operators are severely lacking as domestic national R&D policies are mostly focused on researchers. The 2017 survey on FE also showed that 48.1% of all research facilities did not even employ engineers. In order to solve the shortage of the engineer personnel, the government will start the pilot project in 2012, and then only the 'research equipment engineer training project' from 2013. Considering the above, a national long-term manpower training plan that addresses the quantitative and qualitative shortage of operators needs to be established through a study of the current situation. In conclusion, the findings indicate that this should not only include a plan which connects training to employment but also measures the creation of additional jobs by re-defining and re-establishing operator roles and improving working conditions.

Keywords: engineer, Korea, maintenance, operation, research facilities and equipment

Procedia PDF Downloads 158
9603 Project Stakeholders' Perceptions of Sustainability: A Case Example From the Turkish Construction Industry

Authors: F. Heyecan Giritli, Gizem Akgül

Abstract:

Because of the raising population of world; the need for houses, buildings and infrastructures are increasing rapidly. Energy and water consumption, waste production continues to increase. If this situation of resources continues, there will be a significant loss for next generations. Therefore, there are a lot of researches and solutions developed in the world. Also sustainability criteria are collected together by some countries to serve construction industry with certification systems. Sustainable building production process’s scope requires different path from traditional building production process. Moreover, the key objective of sustainable buildings is that the process includes whole life cycle duration. The process approaches from the decision of the project to the end of it; so the project team is needed from the beginning of the integrated project delivery model. Further more, by defining project team at the beginning of the project provides communication among the team members and defined problem solving and decision making methods. In this research includes the certification systems among the world to comprehend the head lines and assessment criteria. Therefore, it is understand that usually all green building criteria have the same contents. The aim of this research is to assess the sustainable project stakeholder’ perceptions in Turkish construction industry from the point of occupation, job title and years of experience. Therefore, a survey is made to assess the perceptions of each attendant. In Turkey, sustainability criteria are not clearly defined; on the other hand some regulations like waste management, energy efficiency are made by legal agencies. LEED certification system is the most popular system in Turkey that has attended and certificated. From the LEED official data, it’s understood that 308 project registered in Turkey. Therefore, LEED sustainability criteria are used in the survey. Head lines of LEED certification criteria; sustainable sites, water efficiency, energy and atmosphere, material and resources, indoor environmental quality, innovation and regional priority are indicated to assess the perceptions of survey participants. Moreover, only surveying of criteria are not enough; so the equipment, methods, risks and benefits also considered.

Keywords: LEED, sustainability, perceptions, stakeholders, construction, Turkey, risk, benefit

Procedia PDF Downloads 277
9602 Exploring the Energy Model of Cumulative Grief

Authors: Masica Jordan Alston, Angela N. Bullock, Angela S. Henderson, Stephanie Strianse, Sade Dunn, Joseph Hackett, Alaysia Black Hackett, Marcus Mason

Abstract:

The Energy Model of Cumulative Grief was created in 2018. The Energy Model of Cumulative Grief utilizes historic models of grief stage theories. The innovative model is additionally unique due to its focus on cultural responsiveness. The Energy Model of Cumulative Grief helps to train practitioners who work with clients dealing with grief and loss. This paper assists in introducing the world to this innovative model and exploring how this model positively impacted a convenience sample of 140 practitioners and individuals experiencing grief and loss. Respondents participated in Webinars provided by the National Grief and Loss Center of America (NGLCA). Participants in this cross-sectional research design study completed one of three Grief and Loss Surveys created by the Grief and Loss Centers of America. Data analysis for this study was conducted via SPSS and Survey Hero to examine survey results for respondents. Results indicate that the Energy Model of Cumulative Grief was an effective resource for participants in addressing grief and loss. The majority of participants found the Webinars to be helpful and a conduit to providing them with higher levels of hope. The findings suggest that using The Energy Model of Cumulative Grief is effective in providing culturally responsive grief and loss resources to practitioners and clients. There are far reaching implications with the use of technology to provide hope to those suffering from grief and loss worldwide through The Energy Model of Cumulative Grief.

Keywords: grief, loss, grief energy, grieving brain

Procedia PDF Downloads 46
9601 Project and Experiment-Based Fluid Dynamics Education

Authors: Etsuo Morishita

Abstract:

This paper presents the project and experiment-based fluid dynamics education in Meisei University, a private institution in Tokyo, Japan. We pay attention not only to the basic engineering courses but also to the practical aspect of engineering experience. So, we prepare courses called the Projects from I to VI. The Projects I and II are designed for the first year, III and IV are designated for the second year, V and VI are prepared for the third year, respectively. Each supervisor is responsible for two of these projects every year. When students take the Project V and VI at the third year, we automatically assume that these students will join the lab of the project for the graduation thesis. We would like to show our experience in the Project I in the summer term, 2016. In this project, we introduce a traction flight vehicle called Cat Flyer. This is a kind of a kite towed by a car for example. This is very similar to parasailing, but flight is possible even on the roads. Experiments in mechanical engineering education are also very important, and we would like to explain our course on centrifugal pump, venture, and orifice. Although these are described in detail in the text books of fluid dynamics, it is still crucial to have practical experiments as a student.

Keywords: aerodynamics, experiment, fluid dynamics, project

Procedia PDF Downloads 230
9600 Pueblos Mágicos in Mexico: The Loss of Intangible Cultural Heritage and Cultural Tourism

Authors: Claudia Rodriguez-Espinosa, Erika Elizabeth Pérez Múzquiz

Abstract:

Since the creation of the “Pueblos Mágicos” program in 2001, a series of social and cultural events had directly affected the heritage conservation of the 121 registered localities until 2018, when the federal government terminated the program. Many studies have been carried out that seek to analyze from different perspectives and disciplines the consequences that these appointments have generated in the “Pueblos Mágicos.” Multidisciplinary groups such as the one headed by Carmen Valverde and Liliana López Levi, have brought together specialists from all over the Mexican Republic to create a set of diagnoses of most of these settlements, and although each one has unique specificities, there is a constant in most of them that has to do with the loss of cultural heritage and that is related to transculturality. There are several factors identified that have fostered a cultural loss, as a direct reflection of the economic crisis that prevails in Mexico. It is important to remember that the origin of this program had as its main objective to promote the growth and development of local economies since one of the conditions for entering the program is that they have less than 20,000 inhabitants. With this goal in mind, one of the first actions that many “Pueblos Mágicos” carried out was to improve or create an infrastructure to receive both national and foreign tourists since this was practically non-existent. Creating hotels, restaurants, cafes, training certified tour guides, among other actions, have led to one of the great problems they face: globalization. Although by itself it is not bad, its impact in many cases has been negative for heritage conservation. The entry into and contact with new cultures has led to the undervaluation of cultural traditions, their transformation and even their total loss. This work seeks to present specific cases of transformation and loss of cultural heritage, as well as to reflect on the problem and propose scenarios in which the negative effects can be reversed. For this text, 36 “Pueblos Mágicos” have been selected for study, based on those settlements that are cited in volumes I and IV (the first and last of the collection) of the series produced by the multidisciplinary group led by Carmen Valverde and Liliana López Levi (researchers from UNAM and UAM Xochimilco respectively) in the project supported by CONACyT entitled “Pueblos Mágicos. An interdisciplinary vision”, of which we are part. This sample is considered representative since it forms 30% of the total of 121 “Pueblos Mágicos” existing at that moment. With this information, the elements of its intangible heritage loss or transformation have been identified in every chapter based on the texts written by the participants of that project. Finally, this text shows an analysis of the effects that this federal program, as a public policy applied to 132 populations, has had on the conservation or transformation of the intangible cultural heritage of the “Pueblos Mágicos.” Transculturality, globalization, the creation of identities and the desire to increase the flow of tourists have impacted the changes that traditions (main intangible cultural heritage) have had in the 18 years that the federal program lasted.

Keywords: public policies, cultural tourism, heritage preservation, pueblos mágicos program

Procedia PDF Downloads 154
9599 Ultra-Low Chromatic Dispersion, Low Confinement Loss, and Low Nonlinear Effects Index-Guiding Photonic Crystal Fiber

Authors: S. Olyaee, M. Seifouri, A. Nikoosohbat, M. Shams Esfand Abadi

Abstract:

Photonic Crystal Fibers (PCFs) can be used in optical communications as transmission lines. For this reason, the PCFs with low confinement loss, low chromatic dispersion, and low nonlinear effects are highly suitable transmission media. In this paper, we introduce a new design of index-guiding photonic crystal fiber (IG-PCF) with ultra-low chromatic dispersion, low nonlinearity effects, and low confinement loss. Relatively low dispersion is achieved in the wavelength range of 1200 to 1600 nm using the proposed design. According to the new structure of IG-PCF presented in this study, the chromatic dispersion slope is -30(ps/km.nm) and the confinement loss reaches below 10-7 dB/km. While in the wavelength range mentioned above at the same time an effective area of more than 50.2μm2 is obtained.

Keywords: optical communication systems, index-guiding, dispersion, confinement loss, photonic crystal fiber

Procedia PDF Downloads 582
9598 The Need for Implementing Building Information Modelling (BIM) and Integrated Project Delivery (IPD) in the Construction Project: A Case Study in UAE

Authors: C. W. F. Che Wan Putra, M. Alshawi, M. S. Al Ahbabi, M. Jabakhanji

Abstract:

Much of the waste that is generated throughout the life-cycle of a building is mainly related to project stakeholders not having access to information that others have created. This results in waste and high costs. Over the past decade, however, the industry reacted to these challenges by adopting effective procurement approaches, such as partnering and design and build, to improve collaboration and communication among projects’ stakeholders. Most recently, there is a focus on creating and reusing digital project information of stakeholders throughout the life-cycle to facilitate the exchange of information among partners. This shift is based around BIM (Building Information Modelling) and collaborative environment (IPD). The power of collaborative BIM goes beyond improving efficiency. Sustainability, perhaps the most important challenge for the design and construction community, is at the intersection of BIM and collaborative project delivery, drawing strength from both. Due to these benefits, a research study has been carried out to investigate the need of BIM and IPD, on a large scale construction project which is procured on a traditional approach, i.e. design-bid-build. A qualitative research work including a semi-structured interview with project partners was conducted on a typical project in the UAE, whereby the selected project suffered from severe delays and cost overrun. This paper aims to bring about clear evidence to what most likely to happen to a typical construction project in spite of employing very good consultants, project manager and contractors and how these problems could have been avoided if BIM and IPD were deployed.

Keywords: building information modelling (BIM), integrated project delivery (IPD), collaborative environment, case study

Procedia PDF Downloads 369
9597 A Low-Cost Long-Range 60 GHz Backhaul Wireless Communication System

Authors: Atabak Rashidian

Abstract:

In duplex backhaul wireless communication systems, two separate transmit and receive high-gain antennas are required if an antenna switch is not implemented. Although the switch loss, which is considerable and in the order of 1.5 dB at 60 GHz, is avoided, the large separate antenna systems make the design bulky and not cost-effective. To avoid two large reflectors for such a system, transmit and receive antenna feeds with a common phase center are required. The phase center should coincide with the focal point of the reflector to maximize the efficiency and gain. In this work, we present an ultra-compact design in which stacked patch antennas are used as the feeds for a 12-inch reflector. The transmit antenna is a 1 × 2 array and the receive antenna is a single element located in the middle of the transmit antenna elements. Antenna elements are designed as stacked patches to provide the required impedance bandwidth for four standard channels of WiGigTM applications. The design includes three metallic layers and three dielectric layers, in which the top dielectric layer is a 100 µm-thick protective layer. The top two metallic layers are specified to the main and parasitic patches. The bottom layer is basically ground plane with two circular openings (0.7 mm in diameter) having a center through via which connects the antennas to a single input/output Si-Ge Bi-CMOS transceiver chip. The reflection coefficient of the stacked patch antenna is fully investigated. The -10 dB impedance bandwidth is about 11%. Although the gap between transmit and receive antenna is very small (g = 0.525 mm), the mutual coupling is less than -12 dB over the desired frequency band. The three dimensional radiation patterns of the transmit and receive reflector antennas at 60 GHz is investigated over the impedance bandwidth. About 39 dBi realized gain is achieved. Considering over 15 dBm of output power of the silicon chip in the transmit side, the EIRP should be over 54 dBm, which is good enough for over one kilometer multi Gbps data communications. The performance of the reflector antenna over the bandwidth shows the peak gain is 39 dBi and 40 dBi for the reflector antenna with 2-element and single element feed, respectively. This type of the system design is cost-effective and efficient.

Keywords: Antenna, integrated circuit, millimeter-wave, phase center

Procedia PDF Downloads 95
9596 Complicated Grief in Immigration: Drawing in “Mourning and Melancholia” by Freud

Authors: Mana Goodarzi

Abstract:

This study focuses on the analysis of immigration through the lens of Sigmund Freud's conceptual framework on mourning and melancholia. The immigration process, being complicated, involves numerous losses and carries significant psychological consequences. By delving into specific loss experiences within immigration, this work aims to unravel the intricacies of grief in the context of immigration and shed light on why such experiences often tend to manifest as melancholic. The discussion introduces losses in immigration, including unrecognized departure from a love object, identity loss, racial and cultural melancholy, language loss, regressive positioning, and loss of an ideal object. Following this, it explores manic defense mechanisms in immigration, concluding with a mention of successful immigration processes.

Keywords: immigration, melancholia, melancholic immigration, mourn

Procedia PDF Downloads 17
9595 A Wideband CMOS Power Amplifier with 23.3 dB S21, 10.6 dBm Psat and 12.3% PAE for 60 GHz WPAN and 77 GHz Automobile Radar Systems

Authors: Yo-Sheng Lin, Chien-Chin Wang, Yun-Wen Lin, Chien-Yo Lee

Abstract:

A wide band power amplifier (PA) for 60 GHz and 77 GHz direct-conversion transceiver using standard 90 nm CMOS technology is reported. The PA comprises a cascode input stage with a wide band T-type input-matching network and inductive interconnection and load, followed by a common-source (CS) gain stage and a CS output stage. To increase the saturated output power (PSAT) and power-added efficiency (PAE), the output stage adopts a two-way power dividing and combining architecture. Instead of the area-consumed Wilkinson power divider and combiner, miniature low-loss transmission-line inductors are used at the input and output terminals of each of the output stages for wide band input and output impedance matching to 100 ohm. This in turn results in further PSAT and PAE enhancement. The PA consumes 92.2 mW and achieves maximum power gain (S21) of 23.3 dB at 56 GHz, and S21 of 21.7 dB and 14 dB, respectively, at 60 GHz and 77 GHz. In addition, the PA achieves excellent saturated output power (PSAT) of 10.6 dB and maximum power added efficiency (PAE) of 12.3% at 60 GHz. At 77 GHz, the PA achieves excellent PSAT of 10.4 dB and maximum PAE of 6%. These results demonstrate the proposed wide band PA architecture is very promising for 60 GHz wireless personal local network (WPAN) and 77 GHz automobile radar systems.

Keywords: 60 GHz, 77 GHz, PA, WPAN, automotive radar

Procedia PDF Downloads 544
9594 Implications of Measuring the Progress towards Financial Risk Protection Using Varied Survey Instruments: A Case Study of Ghana

Authors: Jemima C. A. Sumboh

Abstract:

Given the urgency and consensus for countries to move towards Universal Health Coverage (UHC), health financing systems need to be accurately and consistently monitored to provide valuable data to inform policy and practice. Most of the indicators for monitoring UHC, particularly catastrophe and impoverishment, are established based on the impact of out-of-pocket health payments (OOPHP) on households’ living standards, collected through varied household surveys. These surveys, however, vary substantially in survey methods such as the length of the recall period or the number of items included in the survey questionnaire or the farming of questions, potentially influencing the level of OOPHP. Using different survey instruments can provide inaccurate, inconsistent, erroneous and misleading estimates of UHC, subsequently influencing wrong policy decisions. Using data from a household budget survey conducted by the Navrongo Health Research Center in Ghana from May 2017 to December 2018, this study intends to explore the potential implications of using surveys with varied levels of disaggregation of OOPHP data on estimates of financial risk protection. The household budget survey, structured around food and non-food expenditure, compared three OOPHP measuring instruments: Version I (existing questions used to measure OOPHP in household budget surveys), Version II (new questions developed through benchmarking the existing Classification of the Individual Consumption by Purpose (COICOP) OOPHP questions in household surveys) and Version III (existing questions used to measure OOPHP in health surveys integrated into household budget surveys- for this, the demographic and health surveillance (DHS) health survey was used). Version I, II and III contained 11, 44, and 56 health items, respectively. However, the choice of recall periods was held constant across versions. The sample size for Version I, II and III were 930, 1032 and 1068 households, respectively. Financial risk protection will be measured based on the catastrophic and impoverishment methodologies using STATA 15 and Adept Software for each version. It is expected that findings from this study will present valuable contributions to the repository of knowledge on standardizing survey instruments to obtain estimates of financial risk protection that are valid and consistent.

Keywords: Ghana, household budget surveys, measuring financial risk protection, out-of-pocket health payments, survey instruments, universal health coverage

Procedia PDF Downloads 103
9593 An Improved GA to Address Integrated Formulation of Project Scheduling and Material Ordering with Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of the resource constraint project scheduling and material ordering problems have received significant attention within the last decades. Hence, the issue has been investigated here with the aim to minimize total project costs. Furthermore, the presented model considers different discount options in order to approach the real world conditions. The incorporated alternatives consist of all-unit and incremental discount strategies. On the other hand, a modified version of the genetic algorithm is applied in order to solve the model for larger sizes, in particular. Finally, the applicability and efficiency of the given model is tested by different numerical instances.

Keywords: genetic algorithm, material ordering, project management, project scheduling

Procedia PDF Downloads 268
9592 High Power Low Loss CMOS SPDT Antenna Switch for LTE-A Front End Module

Authors: Ki-Jin Kim, Suk-Hui LEE, Sanghoon Park, K. H. Ahn

Abstract:

A high power, low loss asymmetric single pole double through(SPDT) antenna switch for LTE-A Front-End Module(FEM) is presented in this paper by using CMOS technology. For the usage of LTE-A applications, low loss and high linearity are the key features which are very challenging works under CMOS process. To enhance insertion loss(IL) and power handling capability, this paper adopts asymmetric Transmitter (TX) and RX (Receiver) structure, floating body technique, multi-stacked structure, and feed forward capacitor technique. The designed SPDT switch shows TX IL 0.34 dB, RX IL 0.73 dB, P1dB 38.9 dBm at 0.9 GHz and TX IL 0.37 dB, RX IL 0.95 dB, P1dB 39.1 dBm at 2.5 GHz respectively.

Keywords: CMOS switch, SPDT switch, high power CMOS switch, LTE-A FEM

Procedia PDF Downloads 335
9591 Feasibility Study of Potential and Economic of Rice Straw VSPP Power Plant in Thailand

Authors: Sansanee Sansiribhan, Anusorn Rattanathanaophat, Chirapan Nuengchaknin

Abstract:

The potential feasibility of a 9.5 MWe capacity rice straw power plant project in Thailand was studied by evaluating the rice straw resource. The result showed that Thailand had a high rice straw biomass potential at the provincial level, especially, the provinces in the central, northeastern and western Thailand, which could feasibly develop plants. The economic feasibility of project was also investigated. The financial feasibility is also evaluated based on two important factors in the project, i.e., NPV ≥ 0 and IRR ≥ 11%. It was found that the rice straw power plant project at 9.5 MWe was financially feasible with the cost of fuel in the range of 30.6-47.7 USD/t.

Keywords: power plant, project feasibility, rice straw, Thailand

Procedia PDF Downloads 308
9590 CFD Prediction of the Round Elbow Fitting Loss Coefficient

Authors: Ana Paula P. dos Santos, Claudia R. Andrade, Edson L. Zaparoli

Abstract:

Pressure loss in ductworks is an important factor to be considered in design of engineering systems such as power-plants, refineries, HVAC systems to reduce energy costs. Ductwork can be composed by straight ducts and different types of fittings (elbows, transitions, converging and diverging tees and wyes). Duct fittings are significant sources of pressure loss in fluid distribution systems. Fitting losses can be even more significant than equipment components such as coils, filters, and dampers. At the present work, a conventional 90o round elbow under turbulent incompressible airflow is studied. Mass, momentum, and k-e turbulence model equations are solved employing the finite volume method. The SIMPLE algorithm is used for the pressure-velocity coupling. In order to validate the numerical tool, the elbow pressure loss coefficient is determined using the same conditions to compare with ASHRAE database. Furthermore, the effect of Reynolds number variation on the elbow pressure loss coefficient is investigated. These results can be useful to perform better preliminary design of air distribution ductworks in air conditioning systems.

Keywords: duct fitting, pressure loss, elbow, thermodynamics

Procedia PDF Downloads 359
9589 A Longitudinal Study on the Relationship between Physical Activity and Gestational Weight Gain

Authors: Chia-Ching Sun, Li-Yin Chien, Chun-Ting Hsiao

Abstract:

Background: Appropriate gestation weight gain benefits pregnant women and their children; however, excessive weight gain could raise the risk of adverse health outcomes and chronicle diseases. Nevertheless, there is currently limited evidence on the effect of physical activities on pregnant women’s gestational weight gain. Purpose: This study aimed to explore the correlation between the level of physical activity and gestation weight gain during the second and third trimester of pregnancy. Methods: This longitudinal study enrolled 800 healthy pregnant women aged over 20 from six hospitals in northern Taiwan. Structured questionnaires were used to collect data twice for each participant during 14-27 and 28-40 weeks of gestation. Variables included demographic data, maternal health history, and lifestyle. The International Physical Activity Questionnaire-short form was used to measure the level of physical activity from walking and of moderate-intensity and vigorous-intensity before and during pregnancy. Weight recorded at prenatal checkups were used to calculate average weight gain in each trimester of pregnancy. T-tests, ANOVA, chi-squared tests, and multivariable logistic regression models were applied to determine the predicting factors for weight gain during the second and third trimester. Result: Participants who had achieved recommended physical activity level (150 minutes of moderate physical activity or 75 minutes of vigorous physical activity a week) before pregnancy (aOR=1.85, 95% CI=1.27-2.67) or who achieved recommended walking level (150 minutes a week) during the second trimester of pregnancy (aOR=1.43, 95% CI= 1.00-2.04) gained significantly more weight during the second trimester. Compared with those who did not reach recommended level of moderate-intensity physical activity (150 minutes a week), women who had reached that during the second trimester were more likely to be in the less than recommended weight gain group than in the recommended weight gain group (aOR=2.06, CI=1.06-4.00). However, there was no significant correlation between physical activity level and weight gain in the third trimester. Other predicting factors of excessive weight gain included education level which showed a negative correlation (aOR=0.38, CI=0.17-0.88), whereas overweight and obesity before pregnancy showed a positive correlation (OR=3.97, CI=1.23-12.78). Conclusions/implications for practice: Participants who had achieved recommended physical activity level before pregnancy significantly reduced exercise during pregnancy and gained excessive weight during the second trimester. However, women who engaged in the practice of physical activity as recommended could effectively control weight gain in the third trimester. Healthcare professionals could suggest that pregnant women who exercise maintain their pre-pregnancy level of physical activity, given activities requiring physical contact or causing falls are avoided. For those who do not exercise, health professionals should encourage them to gradually increase the level of physical activity. Health promotion strategies related to weight control and physical activity level achievement should be given to women before pregnancy.

Keywords: pregnant woman, physical activity, gestation weight gain, obesity, overweight

Procedia PDF Downloads 124
9588 A Succinct Method for Allocation of Reactive Power Loss in Deregulated Scenario

Authors: J. S. Savier

Abstract:

Real power is the component power which is converted into useful energy whereas reactive power is the component of power which cannot be converted to useful energy but it is required for the magnetization of various electrical machineries. If the reactive power is compensated at the consumer end, the need for reactive power flow from generators to the load can be avoided and hence the overall power loss can be reduced. In this scenario, this paper presents a succinct method called JSS method for allocation of reactive power losses to consumers connected to radial distribution networks in a deregulated environment. The proposed method has the advantage that no assumptions are made while deriving the reactive power loss allocation method.

Keywords: deregulation, reactive power loss allocation, radial distribution systems, succinct method

Procedia PDF Downloads 340
9587 CDIO-Based Teaching Reform for Software Project Management Course

Authors: Liping Li, Wenan Tan, Na Wang

Abstract:

With the rapid development of information technology, project management has gained more and more attention recently. Based on CDIO, this paper proposes some teaching reform ideas for software project management curriculum. We first change from Teacher-centered classroom to Student-centered and adopt project-driven, scenario animation show, teaching rhythms, case study and team work practice to improve students' learning enthusiasm. Results showed these attempts have been well received and very effective; as well, students prefer to learn with this curriculum more than before the reform.

Keywords: CDIO, teaching reform, engineering education, project-driven, scenario animation simulation

Procedia PDF Downloads 400
9586 Impacts of Climate Change and Natural Gas Operations on the Hydrology of Northeastern BC, Canada: Quantifying the Water Budget for Coles Lake

Authors: Sina Abadzadesahraei, Stephen Déry, John Rex

Abstract:

Climate research has repeatedly identified strong associations between anthropogenic emissions of ‘greenhouses gases’ and observed increases of global mean surface air temperature over the past century. Studies have also demonstrated that the degree of warming varies regionally. Canada is not exempt from this situation, and evidence is mounting that climate change is beginning to cause diverse impacts in both environmental and socio-economic spheres of interest. For example, northeastern British Columbia (BC), whose climate is controlled by a combination of maritime, continental and arctic influences, is warming at a greater rate than the remainder of the province. There are indications that these changing conditions are already leading to shifting patterns in the region’s hydrological cycle, and thus its available water resources. Coincident with these changes, northeastern BC is undergoing rapid development for oil and gas extraction: This depends largely on subsurface hydraulic fracturing (‘fracking’), which uses enormous amounts of freshwater. While this industrial activity has made substantial contributions to regional and provincial economies, it is important to ensure that sufficient and sustainable water supplies are available for all those dependent on the resource, including ecological systems. In this turn demands a comprehensive understanding of how water in all its forms interacts with landscapes, the atmosphere, and of the potential impacts of changing climatic conditions on these processes. The aim of this study is therefore to characterize and quantify all components of the water budget in the small watershed of Coles Lake (141.8 km², 100 km north of Fort Nelson, BC), through a combination of field observations and numerical modelling. Baseline information will aid the assessment of the sustainability of current and future plans for freshwater extraction by the oil and gas industry, and will help to maintain the precarious balance between economic and environmental well-being. This project is a perfect example of interdisciplinary research, in that it not only examines the hydrology of the region but also investigates how natural gas operations and growth can affect water resources. Therefore, a fruitful collaboration between academia, government and industry has been established to fulfill the objectives of this research in a meaningful manner. This project aims to provide numerous benefits to BC communities. Further, the outcome and detailed information of this research can be a huge asset to researchers examining the effect of climate change on water resources worldwide.

Keywords: northeastern British Columbia, water resources, climate change, oil and gas extraction

Procedia PDF Downloads 230
9585 The Artificial Intelligence (AI) Impact on Project Management: A Destructive or Transformative Agent

Authors: Kwame Amoah

Abstract:

Artificial intelligence (AI) has the prospect of transforming project management, significantly improving efficiency and accuracy. By automating specific tasks with defined guidelines, AI can assist project managers in making better decisions and allocating resources efficiently, with possible risk mitigation. This study explores how AI is already impacting project management and likely future AI's impact on the field. The AI's reaction has been a divided opinion; while others picture it as a destroyer of jobs, some welcome it as an innovation advocate. Both sides agree that AI will be disruptive and revolutionize PM's functions. If current research is to go by, AI or some form will replace one-third of all learning graduate PM jobs by as early as 2030. A recent survey indicates AI spending will reach $97.9 billion by the end of 2023. Considering such a profound impact, the project management profession will also see a paradigm shift driven by AI. The study examines what the project management profession will look like in the next 5-10 years after this technological disruption. The research methods incorporate existing literature, develop trend analysis, and conduct structured interviews with project management stakeholders from North America to gauge the trend. PM professionals can harness the power of AI, ensuring a smooth transition and positive outcomes. AI adoption will maximize benefits, minimize adverse consequences, and uphold ethical standards, leading to improved project performance.

Keywords: project management, disruptive teacnologies, project management function, AL applications, artificial intelligence

Procedia PDF Downloads 43
9584 Long-Term Otitis Media with Effusion and Related Hearing Loss and Its Impact on Developmental Outcomes

Authors: Aleema Rahman

Abstract:

Introduction: This study aims to estimate the prevalence of long-term otitis media with effusion (OME) and hearing loss in a prospective longitudinal cohort studyand to study the relationship between the condition and educational and psychosocial outcomes. Methods: Analysis of data from the Avon Longitudinal Study of Parents and Children (ALSPAC) will be undertaken. ALSPAC is a longitudinal birth cohort study carried out in the UK, which has collected detailed measures of hearing on ~7000 children from the age of seven. A descriptive analysis of the data will be undertaken to estimate the prevalence of OME and hearing loss (defined as having average hearing levels > 20dB and type B tympanogram) at 7, 9, 11, and 15 years as well as that of long-term OME and hearing loss. Logistic and linear regression analyses will be conducted to examine associations between long-term OME and hearing loss and educational outcomes (grades obtained from standardised national attainment tests) and psychosocial outcomes such as anxiety, social fears, and depression at ages 10-11 and 15-16 years. Results: Results will be presented in terms of the prevalence of OME and hearing loss in the population at each age. The prevalence of long-term OME and hearing loss, defined as having OME and hearing loss at two or more time points, will also be reported. Furthermore, any associations between long-term OME and hearing loss and the educational and psychosocial outcomes will be presented. Analyses will take into account demographic factors such as sex and social deprivation and relevant confounders, including socioeconomic status, ethnicity, and IQ. Discussion: Findings from this study will provide new epidemiological information on the prevalence of long-term OME and hearing loss. The research will provide new knowledge on the impact of OME for the small group of children who do not grow out of condition by age 7 but continue to have hearing loss and need clinical care through later childhood. The study could have clinical implications and may influence service delivery for this group of children.

Keywords: educational attainment, hearing loss, otitis media with effusion, psychosocial development

Procedia PDF Downloads 106
9583 Proposal Evaluation of Critical Success Factors (CSF) in Lean Manufacturing Projects

Authors: Guilherme Gorgulho, Carlos Roberto Camello Lima

Abstract:

Critical success factors (CSF) are used to design the practice of project management that can lead directly or indirectly to the success of the project. This management includes many elements that have to be synchronized in order to ensure the project on-time delivery, quality and the lowest possible cost. The objective of this work is to develop a proposal for evaluation of the FCS in lean manufacturing projects, and apply the evaluation in a pilot project. The results show that the use of continuous improvement programs in organizations brings benefits as the process cost reduction and improve productivity.

Keywords: continuous improvement, critical success factors (csf), lean thinking, project management

Procedia PDF Downloads 326
9582 Multi-Objective Multi-Mode Resource-Constrained Project Scheduling Problem by Preemptive Fuzzy Goal Programming

Authors: Busaba Phurksaphanrat

Abstract:

This research proposes a pre-emptive fuzzy goal programming model for multi-objective multi-mode resource constrained project scheduling problem. The objectives of the problem are minimization of the total time and the total cost of the project. Objective in a multi-mode resource-constrained project scheduling problem is often a minimization of make-span. However, both time and cost should be considered at the same time with different level of important priorities. Moreover, all elements of cost functions in a project are not included in the conventional cost objective function. Incomplete total project cost causes an error in finding the project scheduling time. In this research, pre-emptive fuzzy goal programming is presented to solve the multi-objective multi-mode resource constrained project scheduling problem. It can find the compromise solution of the problem. Moreover, it is also flexible in adjusting to find a variety of alternative solutions.

Keywords: multi-mode resource constrained project scheduling problem, fuzzy set, goal programming, pre-emptive fuzzy goal programming

Procedia PDF Downloads 400
9581 A Generalized Weighted Loss for Support Vextor Classification and Multilayer Perceptron

Authors: Filippo Portera

Abstract:

Usually standard algorithms employ a loss where each error is the mere absolute difference between the true value and the prediction, in case of a regression task. In the present, we present several error weighting schemes that are a generalization of the consolidated routine. We study both a binary classification model for Support Vextor Classification and a regression net for Multylayer Perceptron. Results proves that the error is never worse than the standard procedure and several times it is better.

Keywords: loss, binary-classification, MLP, weights, regression

Procedia PDF Downloads 60
9580 Built-Own-Lease-Transfer (BOLT): “An Alternative Model to Subsidy Schemes in Public Private Partnership Projects”

Authors: Nirali Shukla, Neel Shah

Abstract:

The World Bank Institute (WBI) is undertaking a review of government interventions aimed at facilitating sustainable investment in public private partnerships (PPPs) in various under developed countries. The study presents best practice for applying financial model to make PPPs financially viable. The lessons presented here, if properly implemented, can help countries use limited funds to attract more private investment, get more infrastructure built and, as a result, achieve greater economic growth. The four countries Brazil, Colombia, Mexico, and India in total develop an average of nearly US$50 billion in PPPs per year. There are a range of policies and institutional arrangements governments use to provide subsidies to PPPs. For example, some countries have created dedicated agencies, or ‘funds’, capitalized with money from the national budget to manage and allocate subsidies. Other countries have established well-defined policies for appropriating subsidies on an ad hoc basis through an annual budget process. In this context, subsidies are direct fiscal contributions or grants paid by the government to a project when revenues from user fees are insufficient to cover all capital and operating costs while still providing private investors with a reasonable rate of return. Without subsidies, some infrastructure projects that would provide economic or social gains, but are not financially viable, would go undeveloped. But the Financial model of BOLT (PPP) model described in this study suggests that it is most feasible option rather than going for subsidy schemes for making infrastructure projects financially viable. The major advantage for implementing this model is the government money is saved and can be used for other projects as well as the private investors are getting better rate of return than subsidized schemes.

Keywords: PPP, BOLT, subsidy schemes, financial model

Procedia PDF Downloads 709