Search results for: procurement auctions
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 182

Search results for: procurement auctions

62 Case Study: Optimization of Contractor’s Financing through Allocation of Subcontractors

Authors: Helen S. Ghali, Engy Serag, A. Samer Ezeldin

Abstract:

In many countries, the construction industry relies heavily on outsourcing models in executing their projects and expanding their businesses to fit in the diverse market. Such extensive integration of subcontractors is becoming an influential factor in contractor’s cash flow management. Accordingly, subcontractors’ financial terms are important phenomena and pivotal components for the well-being of the contractor’s cash flow. The aim of this research is to study the contractor’s cash flow with respect to the owner and subcontractor’s payment management plans, considering variable advance payment, payment frequency, and lag and retention policies. The model is developed to provide contractors with a decision support tool that can assist in selecting the optimum subcontracting plan to minimize the contractor’s financing limits and optimize the profit values. The model is built using Microsoft Excel VBA coding, and the genetic algorithm is utilized as the optimization tool. Three objective functions are investigated, which are minimizing the highest negative overdraft value, minimizing the net present worth of overdraft, and maximizing the project net profit. The model is validated on a full-scale project which includes both self-performed and subcontracted work packages. The results show potential outputs in optimizing the contractor’s negative cash flow values and, in the meantime, assisting contractors in selecting suitable subcontractors to achieve the objective function.

Keywords: cash flow optimization, payment plan, procurement management, subcontracting plan

Procedia PDF Downloads 79
61 An Assessment of Factors Affecting the Cost and Time Performance of Subcontractors

Authors: Adedayo Jeremiah Adeyekun, Samuel Oluwagbemiga Ishola,

Abstract:

This paper is an assessment of factors influencing the cost and time performance of subcontractors and the need for effective performance of subcontractors at the project sites. The factors influencing the performance of subcontractors are grouped, similar to those identified with the project or an organization and on another hand, there are significant factors influencing the performance of the subcontractors. These factors incorporate management level leadership, time required to complete the project, profit, staff capability/expertise, reputation, installment method, organization history, and project procurement method strategy, security, bidding technique, insurance, bond and relationship with the major contractors. The factors influencing the management of subcontractors in building development projects includes performance of significant past projects, standard of workmanship, consistence with guidelines, regular payment to labourers, adherence to program, regularity and viability of communication with main contractor, adherence to subcontract necessities. Other factors comprise adherence to statutory environmental regulations, number of experienced sites administrative staff, inspection and maintenance of good workplace, number of artisans and workers, quality of as-built and shop drawings and ability to carry out the quantity of work and so on. This study also aimed to suggest a way forward to improve the performance of subcontractors which is the reason for exceeding budget at the project sites. To carry out this study, a questionnaire was drafted to derive information on the causes of low performance of subcontractors and the implication to cost.

Keywords: performance, contractor, subcontractors, construction

Procedia PDF Downloads 43
60 Regression Approach for Optimal Purchase of Hosts Cluster in Fixed Fund for Hadoop Big Data Platform

Authors: Haitao Yang, Jianming Lv, Fei Xu, Xintong Wang, Yilin Huang, Lanting Xia, Xuewu Zhu

Abstract:

Given a fixed fund, purchasing fewer hosts of higher capability or inversely more of lower capability is a must-be-made trade-off in practices for building a Hadoop big data platform. An exploratory study is presented for a Housing Big Data Platform project (HBDP), where typical big data computing is with SQL queries of aggregate, join, and space-time condition selections executed upon massive data from more than 10 million housing units. In HBDP, an empirical formula was introduced to predict the performance of host clusters potential for the intended typical big data computing, and it was shaped via a regression approach. With this empirical formula, it is easy to suggest an optimal cluster configuration. The investigation was based on a typical Hadoop computing ecosystem HDFS+Hive+Spark. A proper metric was raised to measure the performance of Hadoop clusters in HBDP, which was tested and compared with its predicted counterpart, on executing three kinds of typical SQL query tasks. Tests were conducted with respect to factors of CPU benchmark, memory size, virtual host division, and the number of element physical host in cluster. The research has been applied to practical cluster procurement for housing big data computing.

Keywords: Hadoop platform planning, optimal cluster scheme at fixed-fund, performance predicting formula, typical SQL query tasks

Procedia PDF Downloads 202
59 Collaboration of UNFPA and USAID to Mobilize Domestic Government Resources for Contraceptive Procurement in Madagascar

Authors: Josiane Yaguibou, Ngoy Kishimba, Issiaka v. Coulibaly, Sabrina Pestilli, Falinirina Razanalison, Hantanirina Andremanisa

Abstract:

Background: In recent years, Madagascar has faced a significant reduction in donors’ financial resources for the purchase of contraceptive products to meet the family planning needs of the population. In order to ensure the sustainability of the family planning program in the current context, UNFPA Madagascar engaged in a series of initiatives with the ultimate scope of identifying sustainable financing mechanisms for the program. Program intervention: UNFPA Madagascar established a strict collaboration with USAID to engage in a series of joint advocacy and resource mobilization activities with the government. The following initiatives were conducted: (i) Organization of a high-level Round Table to engage the government; (ii) Support to the government in renewing the FP2030 Commitments; (iii) Signature of the Country Compact 2022-2024; (iv) Allocation of government funds in 2022 and 2023 of over 829,222 USD; (v) Obtaining a Matching Fund of 1.5 million USD from UNFPA to encourage the government to allocate resources for the purchase of contraceptive products. Program Implications: The collaboration and the joint advocacy made it possible to (i) have budgetary allocations from the government to purchase products in 2022 and 2023 with a significant reduction in financing gaps; (ii) to convince the government to seek additional financing from partners such as the World Bank which granted more than 8 million USD for the purchase of products; (iii) reduce stock shortages from more than 30% to 15%.

Keywords: UNFPA, USAID, collaboration, contraceptives

Procedia PDF Downloads 33
58 Catastrophic Spending on Health: A Determinant of Access to Health Care by Migrant Slum Population

Authors: Saira Mehnaz, Ali Jafar Abedi, Shazia Farooq Fazli, Sakeena Mushfiq, Zulfia Khan, M. Athar Ansari

Abstract:

Introduction: Public health spending is a necessity in an underdeveloped country like India. The people are already suffering from poverty and that clubbed with out of pocket expenditure leads them to a very catastrophic situation, reducing the overall access to healthcare. Objectives: This study was designed to determine the usual source of medical care opted, the illness pattern, the expenditure incurred on illness and its source of procurement by the study population. It also intended to assess this expenditure as a determinant of access to health care. Methodology: Cities like Aligarh, which are classified as B grade cities in India are thought to be ripe sites for getting livelihood and hence are almost half filled with migrants living in urban slums. A cross sectional study was done to study the newer slum pockets. 3409 households with a population of 16,978 were studied with the help of pretested questionnaire; SPSS 20 was used for statistical analysis. Results and Conclusions: In our study, we found that almost all the households suffered from catastrophic health expenditure. The study population, which was already vulnerable owing to their low socio-economic and migrant status was further being forced with into poverty and indebtedness on account of expenditure on illness. This lead to a significant decrease in access to health. National health financing systems should be designed to protect households from financial catastrophe, by reducing out-of-pocket spending.

Keywords: access to healthcare, catastrophic health expenditure, new urban slums, out of pocket expenditure

Procedia PDF Downloads 170
57 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus

Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis

Abstract:

Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.

Keywords: BIM, project management, project monitoring, UAV

Procedia PDF Downloads 274
56 Infectivity of Hyalomma Ticks for Theileria annulata Using 18s rRNA PCR

Authors: Muhammad S. Sajid, A. Iqbal, A. Kausar, M. Jawad-ul-Hassan, Z. Iqbal, Hafiz M. Rizwan, M. Saqib

Abstract:

Among the ixodid ticks, species of genus Hyalomma are of prime importance as they can survive in harsh conditions better than those of other species. Similarly, among various tick-borne pathogens, Theileria (T.) annulata, the causative agent of tropical theileriosis in large ruminants, is responsible for reduced productivity and ultimately substantial economic losses due to morbidity and mortality. The present study was planned to screening of vector ticks through molecular techniques for determination of tick-borne theileriosis in district Toba Tek Singh (T. T. Singh), Punjab, Pakistan. For this purpose, among the collected ticks (n = 2252) from livestock and their microclimate, Hyalomma spp. were subjected to dissection for procurement of salivary glands (SGs) and formation of pool (averaged 8 acini in each pool). Each pool of acini was used for DNA extraction, quantification and primer-specific amplification of 18S rRNA of Theileria (T.) annulata. The amplicons were electrophoresed using 1.8% agarose gel following by imaging to identify the band specific for T. annulata. For confirmation, the positive amplicons were subjected to sequencing, BLAST analysis and homology search using NCBI software. The number of Theileria-infected acini was significantly higher (P < 0.05) in female ticks vs male ticks, infesting ticks vs questing ticks and riverine-collected vs non-riverine collected. The data provides first attempt to quantify the vectoral capacity of ixodid ticks in Pakistan for T. annulata which can be helpful in estimation of risk analysis of theileriosis to the domestic livestock population of the country.

Keywords: Hyalomma anatolicum, ixodids, PCR, Theileria annulata

Procedia PDF Downloads 252
55 An Analysis of Laboratory Management Practices and Laid down Standard in Some Colleges of Education in Kano State, Nigeria

Authors: Joseph Abiodun Ayo

Abstract:

The main purpose of this study was to investigate the science laboratory management practices employed in some colleges of education in Kano State, Nigeria. Four specific objectives were stated to guide the study, four research questions were investigated, four null hypothesis were tested at 0.05 level of significance. A survey design was used and science laboratory management questionnaires which solicit responses that was used in answering the research questions and testing of hypotheses. These questionnaires were distributed to the respective respondents in the sampled colleges. The respondents for the study comprised biology chemistry, physics, integrated science teacher trainers and the paraprofessionals. Data were analyzed using mean and standard deviation to answer the questions. Chi-square statistical technique was used to test the hypothesis. The findings of the study revealed that all procedures on control of laboratory activities were rarely observed. Safety procedures were occasionally practiced. On provision and procurement of laboratory equipment and materials it was observed that both academic and the paraprofessional were not fully involved. While maintenance measures were occasionally observed, furthermore science laboratory management procedures are not frequently practiced. Hence making the acquisition of science process skills by students becoming difficult. To arrest these anomalies, it is recommended that direct labor in the maintenance of laboratory equipment and other apparatus by paraprofessional is crucial. Training of academic and paraprofessional through workshops to acquire technical skills in maintenance of science laboratory equipment be instituted to increase professionalism. Periodic supervision of activities in the science laboratories should be done promptly.

Keywords: laboratory, management, standard, facility

Procedia PDF Downloads 402
54 A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns

Authors: Saidu Ibrahim, Winston M. W. Shakantu

Abstract:

The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.

Keywords: conceptual framework, cost overrun, material waste, project stags

Procedia PDF Downloads 258
53 Sustainable Energy Supply through the Microgrid Concept: A Case Study of University of Nigeria, Nsukka

Authors: Christian Ndubisi Madu, Benjamin C. Ozumba, Ifeanyi E. Madu, Valentine E. Nnadi, Ikenna C. Ezeasor

Abstract:

The ability to generate power and achieve energy security is one of the driving forces behind the emerging ‘microgrid’ concept. Traditional power supply often operates with centralized infrastructure for generating, transmitting and distributing electricity. The inefficiency and the incessant power outages associated with the centralized power supply system in Nigeria has alienated many users who frequently turn to electric power generator sets to power their homes and offices. Such acts are unsustainable and lead to increase in the use of fossil fuels, generation of carbon dioxide emissions and other gases, and noise pollution. They also pose significant risks as they entail random purchases and storage of gasolines which are fire hazards. It is therefore important that organizations rethink their relationships to centralized power suppliers in other to improve energy accessibility and security. This study explores the energy planning processes and learning taking place at the University of Nigeria Enugu Campus as the school lead microgrid feasibility studies in its community. There is need to develop community partners to deal with the issue of energy efficiency and also to create a strategic alliance to confront political, regulatory and economic barriers to locally-based energy planning. Community-based microgrid can help to reduce the cost of adoption and diversify risks. This study offers insights into the ways in which microgrids can further democratize energy planning, procurement, and access, while simultaneously promoting efficiency and sustainability.

Keywords: microgrid, energy efficiency, sustainability, energy security

Procedia PDF Downloads 332
52 Review of Capitalization of Construction Industry on Sustainable Risk Management in Nigeria

Authors: Nnadi Ezekiel Ejiofor

Abstract:

The construction industry plays a decisive role in the healthy development of any nation. Not only large but even small construction projects contribute to a country’s economic growth. There is a need for good management to ensure successful delivery and sustainability because of the plethora of risks that have resulted in low-profit margins for contractors, cost and schedule overruns, poor quality delivery, and abandoned projects. This research reviewed Capitalization on Sustainable Risk Management. Questionnaires and oral interviews conducted were utilized as means of data collection. One hundred and ninety-eight (198) large construction firms in Nigeria form the population of this study. 15 (fifteen) companies that emanated from merger and acquisition were used for the study. The instruments used for data collection were a researcher-developed structured questionnaire based on a five-point rating scale, interviews, focus group discussion, and secondary sources (bill of quantities and stock and exchange commission). The instrument was validated by two experts in the field. The reliability of the instrument was established by applying the split-half method. Kendall’s coefficient of concordance was used to test the data, and a degree of agreement was obtained. Data were subjected to descriptive statistics and analyzed using analysis of variance, t-test, and SPSS. The identified impacts of capitalization were an increase in turnover (24.5%), improvement in the image (24.5%), risk reduction (20%), business expansion (17.3%), and geographical spread (13.6%). The study strongly advocates the inclusion of risk management evaluation as part of the construction procurement process.

Keywords: capitalization, project delivery, risks, risk management, sustainability

Procedia PDF Downloads 23
51 Building Information Modelling Based Value for Money Assessment in Public-Private Partnership

Authors: Guoqian Ren, Haijiang Li, Jisong Zhang

Abstract:

Over the past 40 years, urban development has undergone large-scale, high-speed expansion, beyond what was previously considered normal and in a manner not proportionally related to population growth or physical considerations. With more scientific and refined decision-making in the urban construction process, new urbanization approaches, aligned with public-private partnerships (PPPs) which evolved in the early 1990s, have become acceptable and, in some situations, even better solutions to outstanding urban municipal construction projects, especially in developing countries. However, as the main driving force to deal with urban public services, PPPs are still problematic regarding value for money (VFM) process in most large-scale construction projects. This paper therefore reviews recent PPP articles in popular project management journals and relevant toolkits, published in the last 10 years, to identify the indicators that influence VFM within PPPs across regions. With increasing concerns about profitability and environmental and social impacts, the current PPP structure requires a more integrated platform to manage multi-performance project life cycles. Building information modelling (BIM), a popular approach to the procurement process in AEC sectors, provides the potential to ensure VFM while also working in tandem with the semantic approach to holistically measure life cycle costs (LCC) and achieve better sustainability. This paper suggests that BIM applied to the entire PPP life cycle could support holistic decision-making regarding VFM processes and thus meet service targets.

Keywords: public-private partnership, value for money, building information modelling, semantic approach

Procedia PDF Downloads 177
50 Challenges of Sustainable Development of Small and Medium-Sized Enterprises in Georgia

Authors: Kharaishvili Eteri

Abstract:

The article highlights the importance of small and medium-sized enterprises in achieving the goals of sustainable development of the economy and increasing the well-being of the population. The opinion is put forward that it is necessary to adapt the activities of small and medium-sized firms in Georgia to sustainable business models. Therefore, it is important to identify the challenges that will ensure compliance with the goals and requirements of sustainable development of small and mediumsized enterprises. Objectives. The goal of the study is to reveal the challenges of sustainable development in small and medium-sized enterprises in Georgia and to develop recommendations for strategic development opportunities. Methodologies The challenges of sustainable development of small and medium-sized enterprises are investigated with the following methodology: bibliographic research of scientific works and reports of organizations is carried out; Based on the grouping of sustainable development goals, the performance indicators of these goals are studied; Differences with respect to the corresponding indicators of European countries are determined by the comparison method; The matrix scheme establishes the conditions and tools for sustainable development; Challenges of sustainable development are identified by factor analysis. Contributions Trends in the sustainable development of small and medium-sized enterprises are studied from the point of view of economic, social and environmental factors; To ensure sustainability, the conditions and tools for sustainable development are established (certified supply chains and global markets, allocation of financial resources necessary for sustainable development, proper public procurement, highly qualified workforce, etc.); Several main challenges have been identified in the sustainable development of small and medium-sized enterprises, including: limited internal resources; Institutional factors, especially vague and imperfect regulations, bureaucracy; low level of investments; Low level of qualification of human capital and others.

Keywords: small and medium-sized enterprises, sustainable development, conditions of sustainable development, strategic directions of sustainable development.

Procedia PDF Downloads 60
49 Attribution of Strategic Motive, Business Efficiencies, Firm Economies, and Market Factors as Motivations of Restaurant Industry Vertical Integration Adoption: A Structural Equation Model

Authors: Sy, Melecio Jr

Abstract:

The decision to adopt vertical integration (VI) is firm-specific, but there is a common practice among businesses in an industry to maximize the massive potential benefits of VI. This study aims to determine VI adoption in the restaurant industry in Davao City. Using a two-step sampling process, the study used a validated survey questionnaire among 264 restaurant owners and managers randomly selected and geographically classified. It is a quantitative study where the data were subjected to a structural equation model (SEM). The results revealed that VI is present but limited to procurement, production, restaurant services, and online marketing. Raw materials were outsourced while delivery to customers through third-party delivery services. VI slowly increased over ten years except for online marketing, which has grown significantly in a few years. The endogenous and exogenous variables were correlated and established the linear regression model. The SEM's best fit model revealed that strategic motives (SMOT) and market factors (MFAC) influenced VI adoption while MFAC is the best predictor. Favorable market factors may lead restaurants to adopt VI. It is, thus, recommended for restaurants to institutionalize strategic management, quantify the impact of double marginalization in future studies as a reason for VI and conduct this study during the new normal to see the influence of business efficiencies and firm economies on VI adoption.

Keywords: business efficiencies, business management, davao city, firm economies, market factors, philippines, strategic motives, structural equation model, supply chain, vertical integration adoption

Procedia PDF Downloads 42
48 Resolution Method for Unforeseen Ground Condition Problem Case in Coal Fired Steam Power Plant Project Location Adipala, Indonesia

Authors: Andi Fallahi, Bona Ryan Situmeang

Abstract:

The Construction Industry is notoriously risky. Much of the preparatory paperwork that precedes construction project can be viewed as the formulation of risk allocation between the owner and the Contractor. The Owner is taking the risk that his project will not get built on the schedule that it will not get built for what he has budgeted and that it will not be of the quality he expected. The Contractor Face a multitude of risk. One of them is an unforeseen condition at the construction site. The Owner usually has the upper hand here if the unforeseen condition occurred. Site data contained in Ground Investigation report is often of significant contractual importance in disputes related to the unforeseen ground condition. A ground investigation can never fully disclose all the details of the underground condition (Risk of an unknown ground condition can never be 100% eliminated). Adipala Coal Fired Steam Power Plant (CSFPP) 1 x 660 project is one of the large CSFPP project in Indonesia based on Engineering, Procurement, and Construction (EPC) Contract. Unforeseen Ground Condition it’s responsible by the Contractor has stipulated in the clausal of Contract. In the implementation, there’s indicated unforeseen ground condition at Circulating Water Pump House (CWPH) area which caused the Contractor should be changed the Method of Work that give big impact against Time of Completion and Cost Project. This paper tries to analyze the best way for allocating the risk between The Owner and The Contractor. All parties that allocating of sharing risk fairly can ultimately save time and money for all parties, and get the job done on schedule for the least overall cost.

Keywords: unforeseen ground condition, coal fired steam power plant, circulating water pump house, Indonesia

Procedia PDF Downloads 302
47 Demand Forecasting to Reduce Dead Stock and Loss Sales: A Case Study of the Wholesale Electric Equipment and Part Company

Authors: Korpapa Srisamai, Pawee Siriruk

Abstract:

The purpose of this study is to forecast product demands and develop appropriate and adequate procurement plans to meet customer needs and reduce costs. When the product exceeds customer demands or does not move, it requires the company to support insufficient storage spaces. Moreover, some items, when stored for a long period of time, cause deterioration to dead stock. A case study of the wholesale company of electronic equipment and components, which has uncertain customer demands, is considered. The actual purchasing orders of customers are not equal to the forecast provided by the customers. In some cases, customers have higher product demands, resulting in the product being insufficient to meet the customer's needs. However, some customers have lower demands for products than estimates, causing insufficient storage spaces and dead stock. This study aims to reduce the loss of sales opportunities and the number of remaining goods in the warehouse, citing 30 product samples of the company's most popular products. The data were collected during the duration of the study from January to October 2022. The methods used to forecast are simple moving averages, weighted moving average, and exponential smoothing methods. The economic ordering quantity and reorder point are used to calculate to meet customer needs and track results. The research results are very beneficial to the company. The company can reduce the loss of sales opportunities by 20% so that the company has enough products to meet customer needs and can reduce unused products by up to 10% dead stock. This enables the company to order products more accurately, increasing profits and storage space.

Keywords: demand forecast, reorder point, lost sale, dead stock

Procedia PDF Downloads 77
46 Lexical Features and Motivations of Product Reviews on Selected Philippine Online Shops

Authors: Jimmylen Tonio, Ali Anudin, Rochelle Irene G. Lucas

Abstract:

Alongside the progress of electronic-business websites, consumers have become more comfortable with online shopping. It has become customary for consumers that prior to purchasing a product or availing services, they consult online reviews info as bases in evaluating and deciding whether or not they should push thru with their procurement of the product or service. Subsequently, after purchasing, consumers tend to post their own comments of the product in the same e-business websites. Because of this, product reviews (PRS) have become an indispensable feature in online businesses equally beneficial for both business owners and consumers. This study explored the linguistic features and motivations of online product reviews on selected Philippine online shops, LAZADA and SHOPEE. Specifically, it looked into the lexical features of the PRs, the factors that motivated consumers to write the product reviews, and the difference of lexical preferences between male and female when they write the reviews. The findings revealed the following: 1. Formality of words in online product reviews primarily involves non-standard spelling, followed by abbreviated word forms, colloquial contractions and use of coined/novel words; 2. Paralinguistic features in online product reviews are dominated by the use of emoticons, capital letters and punctuations followed by the use of pictures/photos and lastly, by paralinguistic expressions; 3. The factors that motivate consumers to write product reviews varied. Online product reviewers are predominantly driven by venting negative feelings motivation, followed by helping the company, helping other consumers, positive self-enhancement, advice seeking and lastly, by social benefits; and 4. Gender affects the word frequencies of product online reviews, while negation words, personal pronouns, the formality of words, and paralinguistic features utilized by both male and female online product reviewers are not different.

Keywords: lexical choices, motivation, online shop, product reviews

Procedia PDF Downloads 106
45 Co-Operation in Hungarian Agriculture

Authors: Eszter Hamza

Abstract:

The competitiveness of economic operators is based on interoperability, which is relatively low in Hungary. The development of co-operation is high priority in Common Agricultural Policy 2014-2020. The aim of the paper to assess co-operations in Hungarian agriculture, estimate the economic outputs and benefits of co-operations, based on statistical data processing and literature. Further objective is to explore the potential of agricultural co-operation with the help of interviews and questionnaire survey. The research seeks to answer questions as to what fundamental factors play role in the development of co-operation, and what are the motivations of the actors and the key success factors and pitfalls. The results were analysed using econometric methods. In Hungarian agriculture we can find several forms of co-operation: cooperatives, producer groups (PG) and producer organizations (PO), machinery cooperatives, integrator companies, product boards and interbranch organisations. Despite the several appearance of the agricultural co-operation, their economic weight is significantly lower in Hungary than in western European countries. Considering the agricultural importance, the integrator companies represent the most weight among the co-operations forms. Hungarian farmers linked to co-operations or organizations mostly in relation to procurement and sales. Less than 30 percent of surveyed farmers are members of a producer organization or cooperative. The trust level is low among farmers. The main obstacle to the development of formalized co-operation, is producers' risk aversion and the black economy in agriculture. Producers often prefer informal co-operation instead of long-term contractual relationships. The Hungarian agricultural co-operations are characterized by non-dynamic development, but slow qualitative change. For the future, one breakout point could be the association of producer groups and organizations, which in addition to the benefits of market concentration, in the dissemination of knowledge, advisory network operation and innovation can act more effectively.

Keywords: agriculture, co-operation, producer organisation, trust level

Procedia PDF Downloads 357
44 The Potential Role of Industrialized Building Systems in Malaysian Sustainable Construction: Awareness and Barriers

Authors: Aawag Mohsen Al-Awag, Wesam Salah Alaloul, M. S. Liew

Abstract:

Industrialized building system (IBS) is a method of construction with concentrated practices consisting of techniques, products, and a set of linked elements which operate collectively to accomplish objectives. The Industrialised Building System (IBS) has been recognised as a viable method for improving overall construction performance in terms of quality, cost, safety and health, waste reduction, and productivity. The Malaysian construction industry is considered one of the contributors to the development of the country. The acceptance level of IBS is still below government expectations. Thus, the Malaysian government has been continuously encouraging the industry to use and implement IBS. Conventional systems have several drawbacks, including project delays, low economic efficiency, excess inventory, and poor product quality. When it comes to implementing IBS, construction companies still face several obstacles and problems, notably in terms of contractual and procurement concerns, which leads to the low adoption of IBS in Malaysia. There are barriers to the acceptance of IBS technology, focused on awareness of historical failure and risks connected to IBS practices to provide enhanced performance. Therefore, the transformation from the existing conventional building systems to the industrialized building systems (IBS) is needed more than ever. The flexibility of IBS in Malaysia’s construction industry is very low due to numerous shortcomings and obstacles. Due to its environmental, economic, and social benefits, IBS could play a significant role in the Malaysian construction industry in the future. This paper concentrates on the potential role of IBS in sustainable construction practices in Malaysia. It also highlights the awareness, barriers, advantages, and disadvantages of IBS in the construction sector. The study concludes with recommendations for Malaysian construction stakeholders to encourage and increase the utilization of industrialised building systems.

Keywords: construction industry, industrialized building system, barriers, advantages and disadvantages, construction, sustainability, Malaysia

Procedia PDF Downloads 60
43 Integrated Risk Management in The Supply Chain of Essential Medicines in Zambia

Authors: Mario M. J. Musonda

Abstract:

Access to health care is a human right, which includes having timely access to affordable and quality essential medicines at the right place and in sufficient quantity. However, inefficient public sector supply chain management contributes to constant shortages of essential medicines at health facilities. Literature review involved a desktop study of published research studies and reports on risk management, supply chain management of essential medicines and their integration to increase the efficiency of the latter. The research was conducted on a sample population of offices under Ministry of Health Headquarters, Lusaka Provincial and District Offices, selected health facilities in Lusaka, Medical Stores Limited, Zambia Medicines Regulatory Authority and Cooperating Partners. Individuals involved in study were selected judgmentally by their functions under selection and quantification, regulation, procurement, storage, distribution, quality assurance, and dispensing of essential medicines. Structured interviews and discussions were held with selected experts and self-administered questionnaires were distributed. Collected and analysed data of 35 returned and usable questionnaires from the 50 distributed. The highest prioritised risks were; inadequate and inconsistent fund disbursements, weak information management systems, weak quality management systems and insufficient resources (HR and infrastructure) among others. The results for this research can be used to increase the efficiency of the public sector supply chain of essential medicines and other pharmaceuticals. The results of the study showed that there is need to implement effective risk management systems by participating institutions and organisations to increase the efficiency of the entire supply chain in order to avoid and/or reduce shortages of essential medicines at health facilities.

Keywords: essential medicine, risk assessment, risk management, supply chain, supply chain risk management

Procedia PDF Downloads 408
42 Full Disclosure Policy: Transparency in Fiscal Administration

Authors: Joyly Jill Apud

Abstract:

Corruption is an all-encompassing issue worldwide. Many attempts have been done to address such cases especially by the government through increasing transparency. The Philippine government increased the mechanism of transparency by opening to public its financial transactions through Full Disclosure Policy – mandating all local governments to post in their websites all financial transactions (Philippine Public Transparency Reporting Project, 2011). For transparency to be fully realized, the challenge lies in creating a mechanism where the constituents are encouraged to engage as social auditors. In line of the said challenge, the study focused in Davao City, Philippines measuring the respondent’s awareness, access and utilization of Full Disclosure Policy (FDP). Particularly, this study determined the significant difference on the awareness, access and utilization of respondents when grouped according to sector and the significant relationship between respondents’ awareness and in the access and utilization of FDP reports. The study used descriptive-correlation, Mean, Anova and Pearson R as statistical treatment. The 120 respondents are from the different sectors of Davao City. These are the Academe, Youth, LGUs, NGOs, Business, and Church groups. The awareness of the respondents was measured in three main categories: Existence of the Policy, Content of the Policy and the Manner of Publication. Access and Utilization of the FDP reports is divided into three: Budget Reports, Procurement Reports and Special Purpose Fund Reports. Results showed that the respondents are moderately aware of the Policy. Though it manifested that the respondents are aware of the disclosure, they are unaware of the Full Disclosure Policy and Full Disclosure Policy Portal. Moreover, the respondents seldom access and utilize all the FDP reports. Further results revealed that there is a significant difference in the awareness and the access and utilization of FDP when grouped according to sector. Moreover, significant relationship in the awareness and the access and utilization of the FDP is evident. It showed that the higher the awareness on FDP, the higher the level of access and utilization on the FDP reports.

Keywords: corruption, e-governance, budget transparency, participation

Procedia PDF Downloads 351
41 Geoelectical Resistivity Method in Aquifer Characterization at Opic Estate, Isheri-Osun River Basin, South Western Nigeria

Authors: B. R. Faleye, M. I. Titocan, M. P. Ibitola

Abstract:

Investigation was carried out at Opic Estate in Isheri-Osun River Basin environment using Electrical Resistivity method to study saltwater intrusion into a fresh water aquifer system from the proximal estuarine water body. The investigation is aimed at aquifer characterisation using electrical resistivity method in order to provide the depth to which fresh water fit for both domestic and industrial consumption. The 2D Electrical Resistivity and Vertical Electrical Resistivity techniques alongside Laboratory analysis of water samples obtained from the boreholes were adopted. Three traverses were investigated using Wenner and Pole-Dipole array with multi-electrode system consisting of 84 electrodes and a spread of 581 m, 664 m and 830 m were attained on the traverses. The main lithologies represented in the study area are Sand, Clay and Clayey Sand of which Sand constitutes the aquifer in the study area. Vertical Electrical Sounding data obtained at different lateral distance on the traverses have indicated that the water in the aquifer in the subsurface is brackish. Brackish water is represented by lowelectrical resistivity value signature while fresh water is characterized by relatively high electrical resistivity and in some regionfresh water is existent at depth greater than 200 m. Results of laboratory analysis of samples showed that the pH, Salinity, Total Dissolved Solid and Conductivity indicated existence of water with poor quality, indicating that salinity, TDS and Conductivity is higher in the Northern part of the study area. The 2D electrical resistivity and Vertical Electrical Sounding methods indicate that fresh water region is at ≥200m depth. Aquifers not fit for domestic use in the study area occur downwards to about 200 m in depth. In conclusion, it is recommended that wells should be sunkbeyond 220 m for the possible procurement of portable fresh water.

Keywords: 2D electrical resistivity, aquifer, brackish water, lithologies

Procedia PDF Downloads 397
40 Investigation of the Factors Influencing the Construction Planning Process Using Participant Observation Method

Authors: Ashokkumar Subbiah

Abstract:

This study investigates the impact of factors that influenced the success of construction planning for a major construction project in Qatar. An approach of participant observation is adopted which is informed by the principles of ethnography: one that reports the participants’ view of their world rather than imposing an artificial theoretical framework upon it. As participant observant, key factors were observed and identified that had an impact on the management and execution of the construction planning. It is found that a ‘shadow culture’ exists between the project participants which, it is argued, is only observable from the perspective of an embedded participant observer. The shadow culture acts to enable the management of the planning process, and its efficacy relates to the ‘quality’ of human inter-relationships amongst immediate stakeholders. Whilst this study uses the concept of shadow culture, it is treated as both a methodological stance and one of the findings of this research in the context of the major construction project in Qatar. The concept of shadow culture is not imposed upon the findings, but instead is used as a research tool: respondents report their own worldview and this is reported from the view of a participant observant in a manner that is understandable and useful to those who are not part of the construction project. The findings of this study identify similar factors influencing the planning process of the Qatar project, but the shadow culture predominantly influences these factors towards the failure of planning process. The research concludes by questioning the assumption that construction planning is a mechanistic process that has to be conducted solely by the planning team. Instead, it is a highly social phenomenon in which the seemingly mechanistic process is made workable by the quality of relationships that exist in the project. Drawing on this the final section provides a series of recommendations that may be helpful in enhancing the efficacy of project planning; these include better training/education at the pre-construction phase; recognition of the importance of shadow processes at management levels, and better appreciation of the impact of contract type and chosen procurement route.

Keywords: construction planning, participant observation, project participants, shadow culture

Procedia PDF Downloads 265
39 Entrepreneurial Venture Creation through Anchor Event Activities: Pop-Up Stores as On-Site Arenas

Authors: Birgit A. A. Solem, Kristin Bentsen

Abstract:

Scholarly attention in entrepreneurship is currently directed towards understanding entrepreneurial venture creation as a process -the journey of new economic activities from nonexistence to existence often studied through flow- or network models. To complement existing research on entrepreneurial venture creation with more interactivity-based research of organized activities, this study examines two pop-up stores as anchor events involving on-site activities of fifteen participating entrepreneurs launching their new ventures. The pop-up stores were arranged in two middle-sized Norwegian cities and contained different brand stores that brought together actors of sub-networks and communities executing venture creation activities. The pop-up stores became on-site arenas for the entrepreneurs to create, maintain, and rejuvenate their networks, at the same time as becoming venues for temporal coordination of activities involving existing and potential customers in their venture creation. In this work, we apply a conceptual framework based on frequently addressed dilemmas within entrepreneurship theory (discovery/creation, causation/effectuation) to further shed light on the broad aspect of on-site anchor event activities and their venture creation outcomes. The dilemma-based concepts are applied as an analytic toolkit to pursue answers regarding the nature of anchor event activities typically found within entrepreneurial venture creation and how these anchor event activities affect entrepreneurial venture creation outcomes. Our study combines researcher participation with 200 hours of observation and twenty in-depth interviews. Data analysis followed established guidelines for hermeneutic analysis and was intimately intertwined with ongoing data collection. Data was coded and categorized in NVivo 12 software, and iterated several times as patterns were steadily developing. Our findings suggest that core anchor event activities typically found within entrepreneurial venture creation are; a concept- and product experimentation with visitors, arrangements to socialize (evening specials, auctions, and exhibitions), store-in-store concepts, arranged meeting places for peers and close connection with municipality and property owners. Further, this work points to four main entrepreneurial venture creation outcomes derived from the core anchor event activities; (1) venture attention, (2) venture idea-realization, (3) venture collaboration, and (4) venture extension. Our findings show that, depending on which anchor event activities are applied, the outcomes vary. Theoretically, this study offers two main implications. First, anchor event activities are both discovered and created, following the logic of causation, at the same time as being experimental, based on “learning by doing” principles of effectuation during the execution. Second, our research enriches prior studies on venture creation as a process. In this work, entrepreneurial venture creation activities and outcomes are understood through pop-up stores as on-site anchor event arenas, particularly suitable for interactivity-based research requested by the entrepreneurship field. This study also reveals important managerial implications, such as that entrepreneurs should allow themselves to find creative physical venture creation arenas (e.g., pop-up stores, showrooms), as well as collaborate with partners when discovering and creating concepts and activities based on new ideas. In this way, they allow themselves to both strategically plan for- and continually experiment with their venture.

Keywords: anchor event, interactivity-based research, pop-up store, entrepreneurial venture creation

Procedia PDF Downloads 54
38 The Impact of Client Leadership, Building Information Modelling (BIM) and Integrated Project Delivery (IPD) on Construction Project: A Case Study in UAE

Authors: C. W. F. Che Wan Putra, M. Alshawi, M. S. Al Ahbabi, M. Jabakhanji

Abstract:

The construction industry is a multi-disciplinary and multi-national industry, which has an important role to play within the overall economy of any country. There are major challenges to an improved performance within the industry. Particularly lacking is, the ability to capture the large amounts of information generated during the life-cycle of projects and to make these available, in the right format, so that professionals can then evaluate alternative solutions based on life-cycle analysis. The fragmented nature of the industry is the main reason behind the unavailability and ill utilisation of project information. The lack of adequately engaging clients and managing their requirements contributes adversely to construction budget and schedule overruns. This is a difficult task to achieve, particularly if clients are not continuously and formally involved in the design and construction process, which means that the design intent is left to designers that may not always satisfy clients’ requirements. Client lead is strongly recognised in bringing change through better collaboration between project stakeholders. However, one of the major challenges is that collaboration is operated under conventional procurement methods, which hugely limit the stakeholders’ roles and responsibilities to bring about the required level of collaboration. A research has been conducted with a typical project in the UAE. A qualitative research work was conducted including semi-structured interviews with project partners to discover the real reasons behind this delay. The case study also investigated the real causes of the problems and if they can be adequately addressed by BIM and IPD. Special focus was also placed on the Client leadership and the role the Client can play to eliminate/minimize these problems. It was found that part of the ‘key elements’ from which the problems exist can be attributed to the client leadership and the collaborative environment and BIM.

Keywords: client leadership, building information modelling (BIM), integrated project delivery (IPD), case study

Procedia PDF Downloads 296
37 Evaluation and Selection of Contractors in Construction Projects with a View Supply Chain Management and Utilization of Promthee

Authors: Sara Najiazarpour, Mahsa Najiazarpour

Abstract:

There are many problems in contracting projects and their performance. At each project stage and due to different reasons, these problems affect cost, time and overall project quality. Hence, in order to increase the efficiency and performance in all levels of the chain and with supply chain management approach, there will be a coordination from the beginning of a project (contractor selection) to the end of project (handover of project). Contractor selection is the foremost part of construction projects which in this multi-criteria decision-making, the best contractor is determined by expert judgment, different variables and their priorities. In this paper for selecting the best contractor, numerous criteria were collected by asking from adept experts and then among them, 16 criteria with highest frequency were considered for questionnaire. This questionnaire was distributed between experts. Cronbach's alpha coefficient was obtained as 72%. Then based on Borda's function 12 important criteria was selected which was categorized in four main criteria and related sub-criteria as follow: Environmental factors and physical equipment: procurement and materials (supplier), company's machines, contractor’s proposed cost estimate - financial capacity: bank turnover and company's assets, the income of tax declaration in last year, Ability to compensate for losses or delays - past performance- records and technical expertise: experts and key personnel, the past technical backgrounds and experiences, employer satisfaction of previous contracts, the number of similar projects was done - standards: rank and field of expertise which company is qualified for and its validity, availability and number of permitted projects done. Then with PROMTHEE method, the criteria were normalized and monitored, finally the best alternative was selected. In this research, qualitative criteria of each company is became a quantitative criteria. Finally, information of some companies was evaluated and the best contractor was selected based on all criteria and their priorities.

Keywords: contractor evaluation and selection, project development, supply chain management, PROMTHEE method

Procedia PDF Downloads 36
36 Post-Disaster Recovery and Impacts on Construction Resources: Case Studies of Queensland Catastrophic Events

Authors: Scott A. Abbott

Abstract:

This paper examines the increase in the occurrence of natural disasters worldwide and the need to support vulnerable communities in post-disaster recovery. Preparation and implementation of post-disaster recovery projects need to be improved to allow communities to recover infrastructure, housing, economically and socially following a catastrophe. With the continual rise in catastrophic events worldwide due to climate change, impacts on construction resources affect the ability for post-disaster recovery to be undertaken. This research focuses on case studies of catastrophic events in Queensland, Australia, to contribute to the body of knowledge and gain valuable insights on lessons learned from past events and how they have been managed. The aim of this research is to adopt qualitative data using semi-structured interviews from participants predominantly from the insurance sector to understand barriers that have previously and currently exist in post-disaster recovery. Existing literature was reviewed to reveal gaps in knowledge that needed to be tested. Qualitative data was collected and summarised from field research with the results analysed and discussed. Barriers that impacted post-disaster recovery included time, cost, and resource capability and capacity. Causal themes that impacted time and cost were identified as decision making, pre-planning, and preparedness, as well as effective communication across stakeholders. The research study applied a qualitative approach to the existing literature and case studies across Queensland, Australia, to identify existing and new barriers that impact post-disaster recovery. It was recommended to implement effective procurement strategies to assist in cost control; implement pre-planning and preparedness strategies across funder, contractor, and local governments; more effective and timely decision making to reduce time and cost impacts.

Keywords: construction recovery, cost, disaster recovery, resources, time

Procedia PDF Downloads 97
35 The Examination And Assurance Of The Microbiological Safety Pertaining To Raw Milk And its Derived Processed Products

Authors: Raana Babadi Fathipour

Abstract:

The production of dairy holds significant importance in the sustenance of billions of individuals worldwide, as they rely on milk and its derived products for daily consumption. In addition to being a source of essential nutrients crucial for human well-being, such as proteins, fats, vitamins, and minerals; dairy items are witnessing an increasing demand worldwide. Amongst all the factors contributing to the quality and safety assurance of dairy products, the strong focus lies on maintaining high standards in raw milk procurement. Raw milk serves as an externally nutritious medium for various microorganisms due to its inherent properties. This poses a considerable challenge for the dairy industry in ensuring that microbial contamination is minimized throughout every stage of the value chain. Despite implementing diverse process technologies—both conventional and innovative—the occurrence of microbial spoilage still results in substantial losses within this industry context. Moreover, milk and dairy products have been associated with numerous cases of foodborne illnesses across the globe. Various pathogens such as Salmonella serovars, Campylobacter spp., Shiga toxin-producing Escherichia coli, Listeria monocytogenes, and enterotoxin producing Staphylococcus aureus are commonly identified as the culprits behind these outbreaks in the dairy industry. The effective management of food safety within this sector necessitates a proactive and risk-based approach to reform. However, this strategy presents difficulties for developing nations where informal value chains dominate the dairy sector. Whether operating on a small or large scale or falling within formal or informal realms, it is imperative that the dairy industry adheres to principles of good hygiene practices and good manufacturing practices. Additionally, identifying and managing potential sources of contamination is crucial in mitigating challenges pertaining to quality and safety precautions.

Keywords: dairy value chain, microbial contamination, food safety, hygiene

Procedia PDF Downloads 37
34 Field Management Solutions Supporting Foreman Executive Tasks

Authors: Maroua Sbiti, Karim Beddiar, Djaoued Beladjine, Romuald Perrault

Abstract:

Productivity is decreasing in construction compared to the manufacturing industry. It seems that the sector is suffering from organizational problems and have low maturity regarding technological advances. High international competition due to the growing context of globalization, complex projects, and shorter deadlines increases these challenges. Field employees are more exposed to coordination problems than design officers. Execution collaboration is then a major issue that can threaten the cost, time, and quality completion of a project. Initially, this paper will try to identify field professional requirements as to address building management process weaknesses such as the unreliability of scheduling, the fickleness of monitoring and inspection processes, the inaccuracy of project’s indicators, inconsistency of building documents and the random logistic management. Subsequently, we will focus our attention on providing solutions to improve scheduling, inspection, and hours tracking processes using emerging lean tools and field mobility applications that bring new perspectives in terms of cooperation. They have shown a great ability to connect various field teams and make informations visual and accessible to planify accurately and eliminate at the source the potential defects. In addition to software as a service use, the adoption of the human resource module of the Enterprise Resource Planning system can allow a meticulous time accounting and thus make the faster decision making. The next step is to integrate external data sources received from or destined to design engineers, logisticians, and suppliers in a holistic system. Creating a monolithic system that consolidates planning, quality, procurement, and resources management modules should be our ultimate target to build the construction industry supply chain.

Keywords: lean, last planner system, field mobility applications, construction productivity

Procedia PDF Downloads 87
33 Opportunities and Challenges for Decarbonizing Steel Production by Creating Markets for ‘Green Steel’ Products

Authors: Hasan Muslemani, Xi Liang, Kathi Kaesehage, Francisco Ascui, Jeffrey Wilson

Abstract:

The creation of a market for lower-carbon steel products, here called ‘green steel’, has been identified as an important means to support the introduction of breakthrough emission reduction technologies into the steel sector. However, the definition of what ‘green’ entails in the context of steel production, the implications on the competitiveness of green steel products in local and international markets, and the necessary market mechanisms to support their successful market penetration remain poorly explored. This paper addresses this gap by holding semi-structured interviews with international sustainability experts and commercial managers from leading steel trade associations, research institutes and steelmakers. Our findings show that there is an urgent need to establish a set of standards to define what ‘greenness’ means in the steelmaking context; standards that avoid market disruptions, unintended consequences, and opportunities for greenwashing. We also highlight that the introduction of green steel products will have implications on product competitiveness on three different levels: 1) between primary and secondary steelmaking routes, 2) with traditional, lesser green steel, and 3) with other substitutable materials (e.g. cement and plastics). This paper emphasises the need for steelmakers to adopt a transitional approach in deploying different low-carbon technologies, based on their stage of technological maturity, applicability in certain country contexts, capacity to reduce emissions over time, and the ability of the investment community to support their deployment. We further identify market mechanisms to support green steel production, including carbon border adjustments and public procurement, highlighting a need for implementing a combination of complementary policies to ensure the products’ roll-out. The study further shows that the auto industry is a likely candidate for green steel consumption, where a market would be supported by price premiums paid by willing consumers, such as those of high-end luxury vehicles.

Keywords: green steel, decarbonisation, business model innovation, market analysis

Procedia PDF Downloads 101