Search results for: maintenance and rehabilitation
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2191

Search results for: maintenance and rehabilitation

2191 Pavement Maintenance and Rehabilitation Scheduling Using Genetic Algorithm Based Multi Objective Optimization Technique

Authors: Ashwini Gowda K. S, Archana M. R, Anjaneyappa V

Abstract:

This paper presents pavement maintenance and management system (PMMS) to obtain optimum pavement maintenance and rehabilitation strategies and maintenance scheduling for a network using a multi-objective genetic algorithm (MOGA). Optimal pavement maintenance & rehabilitation strategy is to maximize the pavement condition index of the road section in a network with minimum maintenance and rehabilitation cost during the planning period. In this paper, NSGA-II is applied to perform maintenance optimization; this maintenance approach was expected to preserve and improve the existing condition of the highway network in a cost-effective way. The proposed PMMS is applied to a network that assessed pavement based on the pavement condition index (PCI). The minimum and maximum maintenance cost for a planning period of 20 years obtained from the non-dominated solution was found to be 5.190x10¹⁰ ₹ and 4.81x10¹⁰ ₹, respectively.

Keywords: genetic algorithm, maintenance and rehabilitation, optimization technique, pavement condition index

Procedia PDF Downloads 111
2190 Roadway Maintenance Management System

Authors: Chika Catherine Ayogu

Abstract:

Rehabilitation plays an important and integral part in the life of roadway rehabilitation management system. It is a systematic method for inspection and rating the roadway condition in a given area. The system performs a cost effective analysis of various maintenance and rehabilitation strategies. Finally the system prioritize and recommend roadway rehabilitation and maintenance to maximize results within a given budget amount. During execution of maintenance activity, the system also tracks labour, materials, equipment and cost for activities performed. The system implements physical assessment field inspection and rating of each street segment which is then entered into a database. The information is analyzed using a software, and provide recommendations and project future conditions. The roadway management system provides a deterioration curve for each segment based on input then assigns the most cost-effective maintenance strategy based on conditions, surface type and functional classification, and available budget. This paper investigates the roadway management system and its capabilities to assist in applying the right treatment to the right roadway at the right time so that expected service life of the roadway is extended as long as possible with acceptable cost.

Keywords: effectiveness, rehabilitation, roadway, software system

Procedia PDF Downloads 114
2189 Performance Based Road Asset Evaluation

Authors: Kidus Dawit Gedamu

Abstract:

Addis Ababa City Road Authority is responsible for managing and setting performance evaluation of the city’s road network using the International Roughness Index (IRI). This helps the authority to conduct pavement condition assessments of asphalt roads each year to determine the health status or Level of service (LOS) of the roadway network and plan program improvements such as maintenance, resurfacing and rehabilitation. For a lower IRI limit economical and acceptable maintenance strategy may be selected among a number of maintenance alternatives. The Highway Development and Management (HDM-4) tool can do such measures to help decide which option is the best by evaluating the economic and structural conditions. This paper specifically addresses flexible pavement, including two principal arterial streets under the administration of the Addis Ababa City Roads Authority. The roads include the road from Megenagna Interchange to Ayat Square and from Ayat Square to Tafo RA. First, it was assessed the procedures followed by the city's road authority to develop the appropriate road maintenance strategies. Questionnaire surveys and interviews are used to collect information from the city's road maintenance departments. Second, the project analysis was performed for functional and economic comparison of different maintenance alternatives using HDM-4.

Keywords: appropriate maintenance strategy, cost stream, road deterioration, maintenance alternative

Procedia PDF Downloads 13
2188 Scheduled Maintenance and Downtime Cost in Aircraft Maintenance Management

Authors: Remzi Saltoglu, Nazmia Humaira, Gokhan Inalhan

Abstract:

During aircraft maintenance scheduling, operator calculates the budget of the maintenance. Usually, this calculation includes only the costs that are directly related to the maintenance process such as cost of labor, material, and equipment. In some cases, overhead cost is also included. However, in some of those, downtime cost is neglected claiming that grounding is a natural fact of maintenance; therefore, it is not considered as part of the analytical decision-making process. Based on the normalized data, we introduce downtime cost with its monetary value and add its seasonal character. We envision that the rest of the model, which works together with the downtime cost, could be checked with the real life cases, through the review of MRO cost and airline spending in the particular and scheduled maintenance events.

Keywords: aircraft maintenance, downtime, downtime cost, maintenance cost

Procedia PDF Downloads 321
2187 Appraisal of Maintenance Practices in Selected Tourist Attraction in Bauchi State, Nigeria

Authors: Eldah Ephraim Buba, Amina Bata Zoaka, Aishatu Ibrahim

Abstract:

This study appraised maintenance practices in selected tourist attractions in Bauchi state, Nigeria. Four tourist attractions were used for the research. Checklists were used to assess operations and repairs maintenance practices in the different attractions. The study carried out personal assessment thrice in six months without prior knowledge of the staff in charge for operational maintenance. Records of repairs maintenance from the attractions maintenance unit for a period of ten years were assessed using the checklists. The findings of the study show that operations maintenance was not adequately carried out in the four tourists attractions. Repairs maintenance was carried out in Yankari game reserve and safari, but repairs maintenance was poor in the other three attractions. The study therefore, recommends that adequate maintenance should be practiced in tourist attractions to expand the lifespan of the facilities and also encourage tourist patronage.

Keywords: appraisal, maintenance, practices, tourist attraction

Procedia PDF Downloads 268
2186 Concept of a Low Cost Gait Rehabilitation Robot for Children with Neurological Dysfunction

Authors: Mariana Volpini, Volker Bartenbach, Marcos Pinotti, Robert Riener

Abstract:

Restoration of gait ability is an important task in the rehabilitation of people with neurological disorders presenting a great impact in the quality of life of an individual. Based on the motor learning concept, robotic assisted treadmill training has been introduced and found to be a feasible and promising therapeutic option in neurological rehabilitation but unfortunately it is not available for most patients in developing countries due to the high cost. This paper presents the concept of a low cost rehabilitation robot to help consolidate the robotic-assisted gait training as a reality in clinical practice in most countries. This work indicates that it is possible to build a simpler rehabilitation device respecting the physiological trajectory of the ankle.

Keywords: bioengineering, gait therapy, low cost rehabilitation robot, rehabilitation robotics

Procedia PDF Downloads 400
2185 Neural Network Based Approach of Software Maintenance Prediction for Laboratory Information System

Authors: Vuk M. Popovic, Dunja D. Popovic

Abstract:

Software maintenance phase is started once a software project has been developed and delivered. After that, any modification to it corresponds to maintenance. Software maintenance involves modifications to keep a software project usable in a changed or a changing environment, to correct discovered faults, and modifications, and to improve performance or maintainability. Software maintenance and management of software maintenance are recognized as two most important and most expensive processes in a life of a software product. This research is basing the prediction of maintenance, on risks and time evaluation, and using them as data sets for working with neural networks. The aim of this paper is to provide support to project maintenance managers. They will be able to pass the issues planned for the next software-service-patch to the experts, for risk and working time evaluation, and afterward to put all data to neural networks in order to get software maintenance prediction. This process will lead to the more accurate prediction of the working hours needed for the software-service-patch, which will eventually lead to better planning of budget for the software maintenance projects.

Keywords: laboratory information system, maintenance engineering, neural networks, software maintenance, software maintenance costs

Procedia PDF Downloads 320
2184 Lean Philosophy towards the Enhancement of Maintenance Programs Efficiency with Particular Attention to Libyan Oil and Gas Scenario

Authors: Sulayman Adrees Mohammed, Ahmed Faraj Abd Alsameea

Abstract:

The ongoing hindrance for Libyan oil and gas companies is the persistent challenge of eradicating maintenance program failures that result in exorbitant costs and production setbacks. Accordingly, this research is prompted to introduce the concept of lean philosophy in maintenance, which aims to eliminate waste and enhance productivity in maintenance procedures through the identification and differentiation of value-adding (VA) and non-value-adding (NVA) activities. The purpose of this paper was to explore and describe the benefits that can be gained by adopting the Lean philosophy towards the enhancement of maintenance programs' efficiency from theoretical perspectives. The oil industry maintenance community in Libya now has an introduced tool by which they can effectively evaluate their maintenance program functionality and reduce the areas of non-value added activities within maintenance, thereby enhancing the availability of the equipment and the capacity of the oil and gas facilities.

Keywords: efficiency, lean philosophy, Libyan oil and gas scenario, maintenance programs

Procedia PDF Downloads 29
2183 Providing a Practical Model to Reduce Maintenance Costs: A Case Study in GeG Company

Authors: Iman Atighi, Jalal Soleimannejad, Reza Pourjafarabadi, Saeid Moradpour

Abstract:

In the past, we could increase profit by increasing product prices. But in the new decade, a competitive market does not let us to increase profit with increased prices. Therefore, the only way to increase profit will be to reduce costs. A significant percentage of production costs are the maintenance costs, and analysis of these costs could achieve more profit. Most maintenance strategies such as RCM (Reliability-Center-Maintenance), TPM (Total Productivity Maintenance), PM (Preventive Maintenance) and etc., are trying to reduce maintenance costs. In this paper, decreasing the maintenance costs of Concentration Plant of Golgohar Iron Ore Mining & Industrial Company (GeG) was examined by using of MTBF (Mean Time Between Failures) and MTTR (Mean Time To Repair) analyses. These analyses showed that instead of buying new machines and increasing costs in order to promote capacity, the improving of MTBF and MTTR indexes would solve capacity problems in the best way and decrease costs.

Keywords: GeG company, maintainability, maintenance costs, reliability-center-maintenance

Procedia PDF Downloads 185
2182 Prosthetic Rehabilitation of Midfacial: Nasal Defects

Authors: Bilal Ahmed

Abstract:

Rehabilitation of congenital and acquired maxillofacial defects is always a challenging clinical scenario. These defects pose major physiological and psychological threat not only to the patient but to the entire family. There has been an enormous scientific development in maxillofacial rehabilitation with the advent of CAD CAM, 3-D scanning, Osseo-integrated implants and improved restorative materials. There are also specialized centers with latest diagnostic and treatment facilities in the developed countries. However, in certain clinical case scenarios, conventional prosthodontic principles are still the gold standards. Similarly in a less developed world, financial and technical constraints are factors affecting treatment planning and final outcomes. However, we can do a lot of benefits to the affected human beings, even with use of simple and cost-effective conventional prosthodontic techniques and materials. These treatment strategies may sometimes be considered as intermediate or temporary options, but with regular follow-up maintenance these can be used on a definitive basis.

Keywords: maxillofacial defects, obturators, prosthodontics, medical and health sciences

Procedia PDF Downloads 313
2181 Aircraft Line Maintenance Equipped with Decision Support System

Authors: B. Sudarsan Baskar, S. Pooja Pragati, S. Raj Kumar

Abstract:

The cost effectiveness in aircraft maintenance is of high privilege in the recent days. The cost effectiveness can be effectively made when line maintenance activities are incorporated at airports during Turn around time (TAT). The present work outcomes the shortcomings that affect the dispatching of the aircrafts, aiming at high fleet operability and low maintenance cost. The operational and cost constraints have been discussed and a suggestive alternative mechanism is proposed. The possible allocation of all deferred maintenance tasks to a set of all deferred maintenance tasks to a set of suitable airport resources have termed as alternative and is discussed in this paper from the data’s collected from the kingfisher airlines.

Keywords: decision support system, aircraft maintenance planning, maintenance-cost, RUL(remaining useful life), logistics, supply chain management

Procedia PDF Downloads 466
2180 Providing a Practical Model to Reduce Maintenance Costs: A Case Study in Golgohar Company

Authors: Iman Atighi, Jalal Soleimannejad, Ahmad Akbarinasab, Saeid Moradpour

Abstract:

In the past, we could increase profit by increasing product prices. But in the new decade, a competitive market does not let us to increase profit with increase prices. Therefore, the only way to increase profit will be reduce costs. A significant percentage of production costs are the maintenance costs, and analysis of these costs could achieve more profit. Most maintenance strategies such as RCM (Reliability-Center-Maintenance), TPM (Total Productivity Maintenance), PM (Preventive Maintenance) etc., are trying to reduce maintenance costs. In this paper, decreasing the maintenance costs of Concentration Plant of Golgohar Company (GEG) was examined by using of MTBF (Mean Time between Failures) and MTTR (Mean Time to Repair) analyses. These analyses showed that instead of buying new machines and increasing costs in order to promote capacity, the improving of MTBF and MTTR indexes would solve capacity problems in the best way and decrease costs.

Keywords: Golgohar Iron Ore Mining and Industrial Company, maintainability, maintenance costs, reliability-center-maintenance

Procedia PDF Downloads 263
2179 Strategic Maintenance Management of Built Facilities in an Organisation

Authors: Anita D. Adamu, Winston M. W. Shakantu

Abstract:

Maintenance management is no longer a stand-alone activity. It has now assumed a strategic position in many organisations that have recognised its importance in achieving primary goals and a key aspect of effective management of facilities. This paper aims at providing an understanding of the role and function of strategic management in creating and sustaining an effective maintenance management system in an organisation. The background provides an articulated concept and principles of strategic management. The theoretical concepts paved way for a conceptual framework for which strategic management can be integrated into the maintenance management system of an organisation to improve effectiveness in the maintenance of facilities.

Keywords: facilities, maintenance management, organisations, strategic management

Procedia PDF Downloads 361
2178 Sustainable Maintenance Model for Infrastructure in Egypt

Authors: S. Hasan, I. Beshara

Abstract:

Infrastructure maintenance is a great challenge facing sustainable development of infrastructure assets due to the high cost of passive implementation of a sustainable maintenance plan. An assessment model of sustainable maintenance for highway infrastructure projects in Egypt is developed in this paper. It helps in improving the implementation of sustainable maintenance criteria. Thus, this paper has applied the analytical hierarchy processes (AHP) to rank and explore the weight of 26 assessment indicators using three hierarchy levels containing the main sustainable categories and subcategories with related indicators. Overall combined weight of each indicator for sustainable maintenance evaluation has been calculated to sum up to a sustainable maintenance performance index (SMI). The results show that the factor "Preventive maintenance cost" has the highest relative contribution factor among others (13.5%), while two factors of environmental performance have the least weights (0.7%). The developed model aims to provide decision makers with information about current maintenance performance and support them in the decision-making process regarding future directions of maintenance activities. It can be used as an assessment performance tool during the operation and maintenance stage. The developed indicators can be considered during designing the maintenance plan. Practices for successful implementation of the model are also presented.

Keywords: analytical hierarchy process, assessment performance Model, KPIs for sustainable maintenance, sustainable maintenance index

Procedia PDF Downloads 103
2177 Budget Optimization for Maintenance of Bridges in Egypt

Authors: Hesham Abd Elkhalek, Sherif M. Hafez, Yasser M. El Fahham

Abstract:

Allocating limited budget to maintain bridge networks and selecting effective maintenance strategies for each bridge represent challenging tasks for maintenance managers and decision makers. In Egypt, bridges are continuously deteriorating. In many cases, maintenance works are performed due to user complaints. The objective of this paper is to develop a practical and reliable framework to manage the maintenance, repair, and rehabilitation (MR&R) activities of Bridges network considering performance and budget limits. The model solves an optimization problem that maximizes the average condition of the entire network given the limited available budget using Genetic Algorithm (GA). The framework contains bridge inventory, condition assessment, repair cost calculation, deterioration prediction, and maintenance optimization. The developed model takes into account multiple parameters including serviceability requirements, budget allocation, element importance on structural safety and serviceability, bridge impact on network, and traffic. A questionnaire is conducted to complete the research scope. The proposed model is implemented in software, which provides a friendly user interface. The framework provides a multi-year maintenance plan for the entire network for up to five years. A case study of ten bridges is presented to validate and test the proposed model with data collected from Transportation Authorities in Egypt. Different scenarios are presented. The results are reasonable, feasible and within acceptable domain.

Keywords: bridge management systems (BMS), cost optimization condition assessment, fund allocation, Markov chain

Procedia PDF Downloads 258
2176 Reliability-Centered Maintenance Application for the Development of Maintenance Strategy for a Cement Plant

Authors: Nabil Hameed Al-Farsi

Abstract:

This study’s main goal is to develop a model and a maintenance strategy for a cement factory called Arabian Cement Company, Rabigh Plant. The proposed work here depends on Reliability centric maintenance approach to develop a strategy and maintenance schedule that ensures increasing the reliability of the production system components, thus ensuring continuous productivity. The cost-effective maintenance of the plant’s dependability performance is the key goal of durability-based maintenance is. The cement plant consists of 7 important steps, so, developing a maintenance plan based on Reliability centric maintenance (RCM) method is made up of 10 steps accordingly starting from selecting units and data until performing and updating the model. The processing unit chosen for the analysis of this case is the calcinatory unit regarding model’s validation and the Travancore Titanium Products Ltd (TTP) using the claimed data history acquired from the maintenance department maintenance from the mentioned company. After applying the proposed model, the results of the maintenance simulation justified the plant's existing scheduled maintenance policy being reconsidered. Results represent the need for preventive maintenance for all Class A criticality equipment instead of the planned maintenance and the breakdown one for all other equipment depends on its criticality and an FMEA report. Consequently, the additional cost of preventive maintenance would be offset by the cost savings from breakdown maintenance for the remaining equipment.

Keywords: engineering, reliability, strategy, maintenance, failure modes, effects and criticality analysis (FMEA)

Procedia PDF Downloads 129
2175 Maintenance Management Practice for Building

Authors: Harold Jideofor Nnachetam

Abstract:

Maintenance management in Nigeria Polytechnic faced many issues due to poor service delivery, inadequate finance, and poor maintenance plan and maintenance backlogs. The purpose of this study is to improve the conventional method practices which tend to be ineffective in Nigeria Polytechnic. The case study was conducted with eight Polytechnics in Nigeria. The selected Polytechnic is based on conventional method practices and its major problems, attempt to implement computerized technology and the willingness of staff to share their experiences. All feedbacks from respondents through semi-structured interview were recorded using video camera and transcribed verbatim. The overall findings of this research indicated; poor service delivery, inadequate financial, poor maintenance planning and maintenance backlogs. There is also need to overcome less man power competencies of maintenance management practices which existed with all eight Polytechnics. In addition, the study also found that the Polytechnics still use conventional maintenance management processes in managing building facility condition. As a result, the maintenance management staff was not able to improve the maintenance management performance at the Polytechnics. The findings are intended to be used for maintenance management practices at Nigeria Polytechnics in order to provide high-quality of building facility with safe and healthy environments.

Keywords: maintenance management, conventional method, maintenance management system, Nigeria polytechnic

Procedia PDF Downloads 279
2174 Educational Plan and Program of the Subject: Maintenance of Electric Power Equipment

Authors: Rade M. Ciric, Sasa Mandic

Abstract:

Students of Higher Education Technical School of Professional Studies, in Novi Sad follow the subject Maintenance of electric power equipment at the Electrotechnical Department. This paper presents educational plan and program of the subject Maintenance of electric power equipment. The course deals with the problems of preventive and investing maintenance of transformer stations (TS), performing and maintenance of grounding of TS and pillars, as well as tracing and detection the location of the cables failure. There is a special elaborated subject concerning the safe work conditions for the electrician during network maintenance, as well as the basics of making and keeping technical documentation of the equipment.

Keywords: educational plan and program, electric power equipment, maintenance, technical documentation, safe work

Procedia PDF Downloads 430
2173 Contribution to the Decision-Making Process for Selecting the Suitable Maintenance Policy

Authors: Nasser Y. Mahamoud, Pierre Dehombreux, Hassan E. Robleh

Abstract:

Industrial companies may be confronted with questions about their choice of maintenance policy. This choice must be guided by several numbers of decision criteria or objectives related to their production or service activities but also to their level of development and their investment prospects. A decision-support methodology to choose a maintenance policy (corrective, systematic or conditional preventive, predictive, opportunistic or not) is proposed to facilitate this choice using the main categories of the most important decision criteria. The different steps of this methodology are illustrated using theoretical case: identification of the different maintenance alternatives, determining the structure of the most important categories of the decision criteria, assessing the different maintenance policies on to the criteria by using an ordinal preference relation, and finally ranking the different maintenance policies.

Keywords: maintenance policy, decision criteria, decision-making process, AHP

Procedia PDF Downloads 303
2172 Impact of Pediatric Cardiac Rehabilitation on the Physical Condition of Children with Congenital Heart Defects

Authors: Hady Atef Labib

Abstract:

Pediatric cardiac rehabilitation has the potential to benefit many children with congenital heart defects (CHD). Instead of excellent surgical results most of children usually present with a depression of physical condition so early rehabilitation program is recommended to avoid that decline in physical tolerance and prevent any post surgical complications. Unfortunately, the limited experience with and availability of these programs has caused the benefits of cardiac rehabilitation to be unavailable to most children with CHD. Therefore, it is recommended to study that field in more detail and apply it on wider scale.

Keywords: pediatric cardiac rehabilitation, congenital heart disease, quality of life, pediatric

Procedia PDF Downloads 340
2171 A Robotic Rehabilitation Arm Driven by Somatosensory Brain-Computer Interface

Authors: Jiewei Li, Hongyan Cui, Chunqi Chang, Yong Hu

Abstract:

It was expected to benefit patient with hemiparesis after stroke by extensive arm rehabilitation, to partially regain forearm and hand function. This paper propose a robotic rehabilitation arm in assisting the hemiparetic patient to learn new ways of using and moving their weak arms. In this study, the robotic arm was driven by a somatosensory stimulated brain computer interface (BCI), which is a new modality BCI. The use of somatosensory stimulation is not only an input for BCI, but also a electrical stimulation for treatment of hemiparesis to strengthen the arm and improve its range of motion. A trial of this robotic rehabilitation arm was performed in a stroke patient with pure motor hemiparesis. The initial trial showed a promising result from the patient with great motivation and function improvement. It suggests that robotic rehabilitation arm driven by somatosensory BCI can enhance the rehabilitation performance and progress for hemiparetic patients after stroke.

Keywords: robotic rehabilitation arm, brain computer interface (BCI), hemiparesis, stroke, somatosensory stimulation

Procedia PDF Downloads 364
2170 A Fuzzy Analytic Hierarchy Process Approach for the Decision of Maintenance Priorities of Building Entities: A Case Study in a Facilities Management Company

Authors: Wai Ho Darrell Kwok

Abstract:

Building entities are valuable assets of a society, however, all of them are suffered from the ravages of weather and time. Facilitating onerous maintenance activities is the only way to either maintain or enhance the value and contemporary standard of the premises. By the way, maintenance budget is always bounded by the corresponding threshold limit. In order to optimize the limited resources allocation in carrying out maintenance, there is a substantial need to prioritize maintenance work. This paper reveals the application of Fuzzy AHP in a Facilities Management Company determining the maintenance priorities on the basis of predetermined criteria, viz., Building Status (BS), Effects on Fabrics (EF), Effects on Sustainability (ES), Effects on Users (EU), Importance of Usage (IU) and Physical Condition (PC) in dealing with categorized 8 predominant building components maintenance aspects for building premises. From the case study, it is found that ‘building exterior repainting or re-tiling’, ‘spalling concrete repair works among exterior area’ and ‘lobby renovation’ are the top three maintenance priorities from facilities manager and maintenance expertise personnel. Through the application of the Fuzzy AHP for maintenance priorities decision algorithm, a more systemic and easier comparing scalar linearity factors being explored even in considering other multiple criteria decision scenarios of building maintenance issue.

Keywords: building maintenance, fuzzy AHP, maintenance priority, multi-criteria decision making

Procedia PDF Downloads 211
2169 Optimal Maintenance Clustering for Rail Track Components Subject to Possession Capacity Constraints

Authors: Cuong D. Dao, Rob J.I. Basten, Andreas Hartmann

Abstract:

This paper studies the optimal maintenance planning of preventive maintenance and renewal activities for components in a single railway track when the available time for maintenance is limited. The rail-track system consists of several types of components, such as rail, ballast, and switches with different preventive maintenance and renewal intervals. To perform maintenance or renewal on the track, a train free period for maintenance, called a possession, is required. Since a major possession directly affects the regular train schedule, maintenance and renewal activities are clustered as much as possible. In a highly dense and utilized railway network, the possession time on the track is critical since the demand for train operations is very high and a long possession has a severe impact on the regular train schedule. We present an optimization model and investigate the maintenance schedules with and without the possession capacity constraint. In addition, we also integrate the social-economic cost related to the effects of the maintenance time to the variable possession cost into the optimization model. A numerical example is provided to illustrate the model.

Keywords: rail-track components, maintenance, optimal clustering, possession capacity

Procedia PDF Downloads 227
2168 Assessment of the Effect of Maintenance Practices on Tourist’s Patronage in Yankari Resort and Safari Nigeria

Authors: Eldah Ephraim Buba

Abstract:

The study is aimed at assessing the effect of maintenance practices on tourist patronage. Yankari resort and Safari had a patronage of twenty thousand, three hundred and two international and national tourists in two thousand and ten, fourteen thousand nine hundred and sixty two, in two thousand and eleven and ten thousand six hundred and one, in two thousand and twelve. The number of tourists keeps falling as the resort has been witnessing low patronage. Personal observation has shown that the state of facilities in the resort is bad. This study aims to appraise maintenance practices in the resort and how it affects tourist patronage. Standard checklist was used for the appraisal of facilities, while questionnaires were administered to tourists to examine whether maintenance practices in the resort do affect their patronage. Findings show that Operational maintenance was poorly carried out while repairs maintenance was fairly done. The study also discovered that there is significant relationship between maintenance practices and tourist patronage. It is recommended that adequate repairs and operational maintenance practices should be carried out in the resort to encourage tourist patronage.

Keywords: maintenance, practices, tourist, patronage

Procedia PDF Downloads 266
2167 Management of Medical Equipment Maintenance

Authors: Gholamreza Madad

Abstract:

The role of medical equipment in modern advanced hospitals is irrefutable. Despite limited financial resources, developing countries have taken an uncontrollable manner to the purchase of complex and expensive equipment, although they have not taken good maintenance to keep these huge capitals. In our country, limited studies have indicated that the irregularities exist in the management of medical equipment maintenance. Research method: The research was done as a cross-sectional one, and in this study, a questionnaire was used to collect data in 10 hospitals. After distributing and collecting questionnaires in person, the collected data were analyzed using descriptive statistics and SPSS software. Research findings: According to the obtained results from the four dimensions of the management of medical equipment maintenance, only (maintenance planning) was in a moderate position and other components with a score of less than 50% were at a low level. There was a direct relationship between the total score of maintenance management and guidance points and coordination of medical equipment maintenance, and as well as the age of hospital managers. Discussion and conclusion: In sum, we can say that problems such as lack of skilled staff in medical engineering departments of hospitals, lack of funds and unaware of the authorities of medical engineering units to their duties have caused that the maintenance situation of medical equipment maintenance is in poor condition (near average). The low inexperience of the authorities of the unit has also contributed to this problem.

Keywords: equipment, maintenance, medical equipment, hospitals

Procedia PDF Downloads 131
2166 A Hybrid Data Mining Algorithm Based System for Intelligent Defence Mission Readiness and Maintenance Scheduling

Authors: Shivam Dwivedi, Sumit Prakash Gupta, Durga Toshniwal

Abstract:

It is a challenging task in today’s date to keep defence forces in the highest state of combat readiness with budgetary constraints. A huge amount of time and money is squandered in the unnecessary and expensive traditional maintenance activities. To overcome this limitation Defence Intelligent Mission Readiness and Maintenance Scheduling System has been proposed, which ameliorates the maintenance system by diagnosing the condition and predicting the maintenance requirements. Based on new data mining algorithms, this system intelligently optimises mission readiness for imminent operations and maintenance scheduling in repair echelons. With modified data mining algorithms such as Weighted Feature Ranking Genetic Algorithm and SVM-Random Forest Linear ensemble, it improves the reliability, availability and safety, alongside reducing maintenance cost and Equipment Out of Action (EOA) time. The results clearly conclude that the introduced algorithms have an edge over the conventional data mining algorithms. The system utilizing the intelligent condition-based maintenance approach improves the operational and maintenance decision strategy of the defence force.

Keywords: condition based maintenance, data mining, defence maintenance, ensemble, genetic algorithms, maintenance scheduling, mission capability

Procedia PDF Downloads 260
2165 Developing Pavement Maintenance Management System (PMMS) for Small Cities, Aswan City Case Study

Authors: Ayman Othman, Tallat Ali

Abstract:

A pavement maintenance management system (PMMS) was developed for the city of Aswan as a model of a small city to provide the road maintenance department in Aswan city with the capabilities for comprehensive planning of the maintenance activities needed to put the internal pavement network into desired physical condition in view of maintenance budget constraints. The developed system consists of three main stages. First is the inventory & condition survey stage where the internal pavement network of Aswan city was inventoried and its actual conditions were rated in segments of 100 meters length. Second is the analysis stage where pavement condition index (PCI) was calculated and the most appropriate maintenance actions were assigned for each segment. The total maintenance budget was also estimated and a parameter based ranking criteria were developed to prioritize maintenance activities when the available maintenance budget is not sufficient. Finally comes the packaging stage where approved maintenance budget is packed into maintenance projects for field implementation. System results indicate that, the system output maintenance budget is very reasonable and the system output maintenance programs agree to a great extent with the actual maintenance needs of the network. Condition survey of Aswan city road network showed that roughness is the most dominate distress. In general, the road network can be considered in a fairly reasonable condition, however, the developed PMMS needs to be officially adapted to maintain the road network in a desirable condition and to prevent further deterioration.

Keywords: pavement, maintenance, management, system, distresses, survey, ranking

Procedia PDF Downloads 212
2164 Evaluation of Mixtures of Recycled Concrete Aggregate and Reclaimed Asphalt Pavement Aggregate in Road Subbases

Authors: Vahid Ayan, Joshua R Omer, Alireza Khavandi, Mukesh C Limbachiya

Abstract:

In Iran, utilization of reclaimed asphalt pavement (RAP) aggregate has become a common practice in pavement rehabilitation during the last ten years. Such developments in highway engineering have necessitated several studies to clarify the technical and environmental feasibility of other alternative materials in road rehabilitation and maintenance. The use of recycled concrete aggregates (RCA) in asphalt pavements is one of the major goals of municipality of Tehran. Nevertheless little research has been done to examine the potential benefits of local RCA. The objective of this study is laboratory investigation of incorporating RCA into RAP for use in unbound subbase application. Laboratory investigation showed that 50%RCA+50%RAP is both technically and economically appropriate for subbase use.

Keywords: Roads & highways, Sustainability, Recycling & reuse of materials

Procedia PDF Downloads 450
2163 Application of IED to Condition Based Maintenance of Medium Voltage GCB/VCB

Authors: Ming-Ta Yang, Jyh-Cherng Gu, Chun-Wei Huang, Jin-Lung Guan

Abstract:

Time base maintenance (TBM) is conventionally applied by the power utilities to maintain circuit breakers (CBs), transformers, bus bars and cables, which may result in under maintenance or over maintenance. As information and communication technology (ICT) industry develops, the maintenance policies of many power utilities have gradually changed from TBM to condition base maintenance (CBM) to improve system operating efficiency, operation cost and power supply reliability. This paper discusses the feasibility of using intelligent electronic devices (IEDs) to construct a CB CBM management platform. CBs in power substations can be monitored using IEDs with additional logic configuration and wire connections. The CB monitoring data can be sent through intranet to a control center and be analyzed and integrated by the Elipse Power Studio software. Finally, a human-machine interface (HMI) of supervisory control and data acquisition (SCADA) system can be designed to construct a CBM management platform to provide maintenance decision information for the maintenance personnel, management personnel and CB manufacturers.

Keywords: circuit breaker, condition base maintenance, intelligent electronic device, time base maintenance, SCADA

Procedia PDF Downloads 296
2162 Assessment of Rehabilitation Possibilities in Case of Budapest Jewish Quarter Building Stock

Authors: Viktória Sugár, Attila Talamon, András Horkai, Michihiro Kita

Abstract:

The dense urban fabric of the Budapest 7th district is known as the former Jewish Quarter. The majority of the historical building stock contains multi-story tenement houses with courtyards, built around the end of the 19th century. Various rehabilitation and urban planning attempt occurred until today, mostly left unfinished. Present paper collects the past rehabilitation plans, actions and their effect which took place in the former Jewish District of Budapest. The authors aim to assess the boundaries of a complex building stock rehabilitation, by taking into account the monument protection guidelines. As a main focus of the research, structural as well as energetic rehabilitation possibilities are analyzed in case of each building by using Geographic Information System (GIS) methods.

Keywords: geographic information system, Hungary, Jewish Quarter, monument, protection, rehabilitation

Procedia PDF Downloads 228