Search results for: cost of living
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8019

Search results for: cost of living

8019 Preliminary Study of the Cost-Effectiveness of Green Walls: Analyzing Cases from the Perspective of Life Cycle

Authors: Jyun-Huei Huang, Ting-I Lee

Abstract:

Urban heat island effect is derived from the reduction of vegetative cover by urban development. Because plants can improve air quality and microclimate, green walls have been applied as a sustainable design approach to cool building temperature. By using plants to green vertical surfaces, they decrease room temperature and, as a result, decrease the energy use for air conditioning. Based on their structures, green walls can be divided into two categories, green façades and living walls. A green façade uses the climbing ability of a plant itself, while a living wall assembles planter modules. The latter one is widely adopted in public space, as it is time-effective and less limited. Although a living wall saves energy spent on cooling, it is not necessarily cost-effective from the perspective of a lifecycle analysis. The Italian study shows that the overall benefit of a living wall is only greater than its costs after 47 years of its establishment. In Taiwan, urban greening policies encourage establishment of green walls by referring to their benefits of energy saving while neglecting their low performance on cost-effectiveness. Thus, this research aims at understanding the perception of appliers and consumers on the cost-effectiveness of their living wall products from the lifecycle viewpoint. It adopts semi-structured interviews and field observations on the maintenance of the products. By comparing the two results, it generates insights for sustainable urban greening policies. The preliminary finding shows that stakeholders do not have a holistic sense of lifecycle or cost-effectiveness. Most importantly, a living wall well maintained is often with high input due to the availability of its maintenance budget, and thus less sustainable. In conclusion, without a comprehensive sense of cost-effectiveness throughout a product’s lifecycle, it is very difficult for suppliers and consumers to maintain a living wall system while achieve sustainability.

Keywords: case study, maintenance, post-occupancy evaluation, vertical greening

Procedia PDF Downloads 236
8018 Economic Meltdown and Inflation and Its Effect on Organization Performance: A Study of Nigerian Manufacturing Companies

Authors: Cynthia Oluchi Akagha

Abstract:

This paper highlights the increase in production cost and the corresponding outcomes in Nigeria using six major manufacturing companies as a case study. During an inflationary period, the cost-of-living increases, which reduces the purchasing power of money. Inflation has become a severe issue in many countries recently. To examine how inflation affects the success of businesses in Nigeria, a quantitative approach and a focus on causality were utilized to examine six (6) functional Nigerian manufacturing enterprises. The correlation between business production cost, cost of items supplied, and gross profit from 2021-2022 was analyzed. The analysis recorded that the cost of production increased in 2022 compared to 2021. The expansion varied between the six companies by 77.1%. Only one company out of six reported a decrease in gross profit in 2022 compared to the previous year. The other five companies' profits increased between 6.5% and 87%. Companies like these have thrived despite the rising cost of living because they have adjusted by increasing their product pricing. Since this change has the most significant influence on consumers, the best long-term reaction for a corporation to inflationary effects is often an improvement in cost efficiency, output, or both.

Keywords: economic meltdown, inflation, organization, performance

Procedia PDF Downloads 38
8017 Impact of Lifestyle and User Expectations on the Demand of Compact Living Spaces in the Home Interiors in Indian Cities

Authors: Velly Kapadia, Reenu Singh

Abstract:

This report identifies the long-term driving forces behind urbanization and the impact of compact living on both society and the home and proposes a concept to create smarter and more sustainable homes. Compact living has been trending across India as a sustainable housing solution, and the reality is that India is currently facing a housing shortage in urban areas of around 10 million units. With the rising demand for housing, urban land prices have been rising and the cost of homes. The paper explores how and why the interior design of the homes can be improved to relieve the housing demand in an environmentally, socially and economically sustainable manner. A questionnaire survey was conducted to determine living patterns, area requirements, ecological footprints, energy consumption, purchasing patterns, and various pro-environmental behaviors of people who downsize to compact homes. Quantitative research explores sustainable material choices, durability, functionality, cost, and reusability of furniture. Besides addressing the need for smart and sustainable designed compact homes, a conceptual model is proposed, including options of ideal schematic layouts for homes in urban areas. In the conclusions, suggestions to improve space planning and suitable interior entities have been made to support the fact that compact homes are an eminently practical and sensible solution for the urban citizen.

Keywords: compact living, housing shortage, lifestyle, sustainable interior design

Procedia PDF Downloads 166
8016 Communal Shipping Container Home Design for Reducing Homelessness in Glasgow

Authors: Matthew Brady

Abstract:

Lack of affordable housing for individuals has the potential to create gaps in society, which result in thousands of people facing homelessness every year in some of the worlds most affluent cities. This paper examines strategies for providing a more economic living environment for single occupants. Focusing on comparisons of successful examples reducing homeless populations around the world, with an emphasis on social inclusion and community living. Practically exploring the architectural considerations of ensuring a suitable living environment for multiple single occupancy residents, as well as selecting the appropriate materials to ensure costs are kept to manageable level for investment from local governments. The aim of this paper is to make some practical recommendations for low cost communal living space, with particular reference to recycled shipping container homes on a potential unused site on the River Clyde in Glasgow. Ideally, the suggestions and recommendations put forward in this paper can be replicable or used for reference in other similar situations. The proposal explored in this paper is sensitive towards addressing people's standard of living and adapting homes to match may be one solution to reducing the number of people being evicted from unaffordable homes as the generally upward global trend for urbanization continues.

Keywords: affordable housing, community living, shipping container, urban regeneration

Procedia PDF Downloads 150
8015 Reliability-Based Life-Cycle Cost Model for Engineering Systems

Authors: Reza Lotfalian, Sudarshan Martins, Peter Radziszewski

Abstract:

The effect of reliability on life-cycle cost, including initial and maintenance cost of a system is studied. The failure probability of a component is used to calculate the average maintenance cost during the operation cycle of the component. The standard deviation of the life-cycle cost is also calculated as an error measure for the average life-cycle cost. As a numerical example, the model is used to study the average life cycle cost of an electric motor.

Keywords: initial cost, life-cycle cost, maintenance cost, reliability

Procedia PDF Downloads 559
8014 Sustainable Development Goals 2030: A Case of Malaysian Priorities from the Perspectives of Undergraduate Students

Authors: Zurina Mahadi, Hukil Sino

Abstract:

United Nations resolved 2030 Sustainable Development Goals (SDGs) in 2015 to complete what Millennium Development Goals did not achieve. Accommodating 17 goals and 169 targets, Sustainable Development Goals are designated to be achieved over the next 15 years. A survey was conducted in July 2019 among the undergraduate students of a public university in Selangor, Malaysia, to learn their selection over Sustainable Development Goals, which they think is the most critical in the Malaysian scenario. This study adopted a qualitative approach, and data is gathered from a single instruction questionnaire administered to a purposive sample of participants. 13 goals were selected by the participants which are Goal 1, 2, 3, 4, 5, 6, 8, 10, 11, 12, 13, 16 and 17 while none has selected Goal 7, 9, 14 and 15 which are ‘Affordable and Clean Energy’; ‘Industry, Innovation and Infrastructure’; ‘Life Below Water’ and ‘Life On Land’ respectively. The selected goals are then ranked according to the number of participants who chose that particular goal. Goal 8 is found to be at the highest position of the ranking while Goal 5, 6, 10, and 13 accommodating the lowest position. Goal 8, which is ‘Decent Work and Economic Growth’ is chosen by 13 participants as the most critical goal in Malaysia while Goal 5,6 10, and 13, which are ‘Gender Equality’; ‘Clean Water and Sanitation’; ‘Reduced Inequalities’ and ‘Climate Action’ respectively, are chosen by only one participant each. Issues highlighted by the participants are themed into 10 themes, which are job availability, cost of living, well-being, corruption, education, environment, gender, development planning, consumption, and partnership. The theme of the cost of living has the highest number of issues, followed by the theme of job availability and the environment. The theme of gender has the least number of issues, followed by the theme of corruption and development planning. In principle, these findings, therefore, conclude that from a public university students’ point of view, the most critical sustainable development goal is decent work and economic growth while the most concerning issue is the cost of living. The implications of these findings are students’ knowledge towards the current issues of development, and their views of future sustainable development are considerably high. This study, therefore, suggests their views be inculcated into local, sustainable development frameworks to increase the inclusiveness of the young generation as they are the future SDGs stakeholders.

Keywords: cost of living, inclusiveness, job availability, sustainable development goals

Procedia PDF Downloads 110
8013 Effect of Cost Control and Cost Reduction Techniques in Organizational Performance

Authors: Babatunde Akeem Lawal

Abstract:

In any organization, the primary aim is to maximize profit, but the major challenges facing them is the increase in cost of operation because of this there is increase in cost of production that could lead to inevitable cost control and cost reduction scheme which make it difficult for most organizations to operate at the cost efficient frontier. The study aims to critically examine and evaluate the application of cost control and cost reduction in organization performance and also to review budget as an effective tool of cost control and cost reduction. A descriptive survey research was adopted. A total number of 40 respondent retrieved were used for the study. The analysis of data collected was undertaken by applying appropriate statistical tools. Regression analysis was used to test the hypothesis with the use of SPSS. Based on the findings; it was evident that cost control has a positive impact on organizational performance and also the style of management has a positive impact on organizational performance.

Keywords: organization, cost reduction, cost control, performance, budget, profit

Procedia PDF Downloads 553
8012 Scheduled Maintenance and Downtime Cost in Aircraft Maintenance Management

Authors: Remzi Saltoglu, Nazmia Humaira, Gokhan Inalhan

Abstract:

During aircraft maintenance scheduling, operator calculates the budget of the maintenance. Usually, this calculation includes only the costs that are directly related to the maintenance process such as cost of labor, material, and equipment. In some cases, overhead cost is also included. However, in some of those, downtime cost is neglected claiming that grounding is a natural fact of maintenance; therefore, it is not considered as part of the analytical decision-making process. Based on the normalized data, we introduce downtime cost with its monetary value and add its seasonal character. We envision that the rest of the model, which works together with the downtime cost, could be checked with the real life cases, through the review of MRO cost and airline spending in the particular and scheduled maintenance events.

Keywords: aircraft maintenance, downtime, downtime cost, maintenance cost

Procedia PDF Downloads 321
8011 The Impact of a Living Wage on the UK Hotel Sector

Authors: Andreas Walmsley, Shobana Partington, Rebecca Armstrong, Harold Goodwin

Abstract:

In the UK, more than 1 in 5 workers earn less than a living wage. The hospitality sector is particularly affected where it has been claimed two thirds of workers earn less than the living wage. The UK Government is set to introduce (April 2016) a national living wage (NLW) which is therefore likely to have a significant impact on the hospitality sector. To date limited data exists that focus on how hotels are tackling the issue, what stakeholder perceptions are towards the change in legislation, and how the NLW may affect working patterns in the sector. This study draws on interviews with a range of key stakeholders such as hotel HR and general managers as well as industry representatives to explore these issues within the broader context of responsible tourism. Data collection is still ongoing and is scheduled to be completed by the end of June 2016.

Keywords: hospitality, living wage, responsible tourism, tourism employment

Procedia PDF Downloads 349
8010 A Review of the Factors Causing Cost Overrun in Construction Projects in Malaysia

Authors: Kaleem Ullah, Abd Halid Bin Abdullah

Abstract:

This study examines previous literature on cost overrun in construction projects with the specific aim of determining the frequently observed causes of cost overruns in Malaysian construction projects. Cost overrun is one of the major problems in construction projects. Cost overrun is frequently observed in almost every construction projects. This cost overrun in construction projects occurs due to various reasons and many researchers have carried out various studies to identify the cause factors of this issue. The causes of construction cost overrun could vary from country to country because of the difference in political, economic, social and environmental conditions. Likewise, other countries construction projects in Malaysia have also the issue of cost overrun. The concept of cost overrun in construction projects has attracted much attention in recent years and researches are trying to understand the causes of these overruns and their effects to the construction industry as whole. This paper review various research studies carried out in Malaysia which surveyed the cost performance and cause factors of cost overruns in construction projects in Malaysia.

Keywords: cause of cost overrun, cost overrun, construction industry in Malaysia, effects of cost overrun

Procedia PDF Downloads 246
8009 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 615
8008 The Valuation of Employees Provident Fund on Long Term Care Cost among Elderly in Malaysia

Authors: Mazlynda Md Yusuf, Wafa' Mahadzir, Mohamad Yazis Ali Basah

Abstract:

Nowadays, financing long-term care for elderly people is a crucial issue, either towards the family members or the care institution. Corresponding with the growing number of ageing population in Malaysia, there’s a need of concern on the uncertaintiness of future family care and the need for long-term care services. Moreover, with the increasing cost of living, children feels the urge of needing to work and receive a fixed monthly income that results to sending their elderly parents to care institutions. Currently, in Malaysia, the rates for private nursing homes can amount up to RM 4,000 per month excluding medical treatments and other recurring expenses. These costs are expected to be paid using their Employees Provident Fund (EPF) savings that they accumulate during their working years, especially for those working under private sectors. Hence, this study identifies the adequacy of EPF in funding the cost of long-term care service during old age. This study used a hypothetical simulation model to simulate different scenarios. The findings of this study could be used for individuals to prepare on the importance of planning for retirement, especially with the increasing cost of long-term care services.

Keywords: long-term care cost, employees provident fund Malaysia, ageing population, Malaysian elderly

Procedia PDF Downloads 304
8007 A Prediction of Electrical Cost for High-Rise Building Construction

Authors: Picha Sriprachan

Abstract:

The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.

Keywords: high-rise building construction, electrical cost, construction phase, architectural phase

Procedia PDF Downloads 355
8006 Cost Overrun Causes in Public Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study is conducted to identify causes of cost deviations in public construction projects in Saudi Arabia from contractors’ perspective. 41 factors that might affect cost estimating accuracy were identified through literature review and discussion with some construction experts. The factors were tabulated in a questionnaire form and a field survey included 51 contractors from the Northern Province of Saudi Arabia was performed. The results show that the top five important causes are: wrong estimation method, long period between design and time of implementation, cost of labor, cost of machinary and absence of construction-cost data.

Keywords: cost deviation, public construction, cost estimating, Saudi Arabia, contractors

Procedia PDF Downloads 430
8005 Assistive Technologies and the 'Myth' of Independent Living: A Sociological Understanding of Assistive Technologies for Locomotor Disabled in India

Authors: Pavani K. Sree, Ragahava Reddy Chandri

Abstract:

Independent living and living with dignity have been the hallmarks of the movement of the persons with disabilities across the globe against the oppression perpetuated by society in the form of social and physical structural barriers. Advancements in assistive technologies have been providing a new lease of life to persons with disabilities. However, access to these technologies is marred by the issues of affordability and availability. Poor from the developing countries find it difficult to make independent living or live with dignity because of lack of access and inability to afford the advance technologies. Class and gender appear to be key factors influencing the access to modern assistive technologies. The present paper attempts to understand the dynamics of class and gender in accessing advanced technologies in the Indian context. Based on an empirical study in which data were collected from persons with locomotor disabilities and service providers, the paper finds that the advance technologies are expensive and inaccessible to all persons with disabilities. The paper also finds that men with disabilities are prioritized by the members of the family for the use of advance technologies while women with disabilities are forced to live with not so advanced technologies. The paper finds that the state institutions working in the field of prosthetics and assistive technologies fail to deliver to the requirements of the poor. It was found that because of lack of facilities at the state institutions the cost of prosthetics, in the case of orthopedically challenged, is expensive and unaffordable for the poor. It was found that while rich male access the private services the poor women depend on the state institutions. It may be said that the social, cultural stereotypes extend not only to the state organizations but also to the use of prosthetics. Thus the notions of independent living and living with dignity in third world countries context are still elusive.

Keywords: accessibility, assistive technology, class, gender, state

Procedia PDF Downloads 269
8004 Affordable and Sustainable Housing Construction: Case Studies

Authors: Tony Rizk

Abstract:

Recent material advances and cost efficiencies are transforming the housing industry away from traditional lumber and gypsum material to alternate fiberboard material that is workable and resistant to fire, mold, and pest infestation. The use of these materials may add to the initial cost of construction. However, the life cycle (cradle to grave) cost of houses using these construction materials and methods are lower than the life cycle costs using traditional housing construction materials and methods. This paper will present four (4) case studies of sustainable house projects. Each project was designed and constructed using earthen-based, sustainable fiberboard material that is resistant to fire, mold, and infestation and fabricated at a very low material calorific value. These house projects have a living space ranging from 625 sq. ft. for an accessory dwelling unit and up to 3,200 sq. ft. 1-story and 2-story homes. For each case study, we will present the house engineering design and construction method, the initial construction costs, a summary of the life cycle costs, and a comparison to the life cycle cost of traditional housing available in the literature.

Keywords: residential housing, sustainable housing, life cycle cost, fire resistance, mold, infestation resistance

Procedia PDF Downloads 93
8003 Understanding Co-Living Experience through University Residential Halls - A Pilot Study

Authors: Michelle W. T. Cheng, Yau Y.

Abstract:

Hong Kong continues to be ranked as the least affordable housing market in the world, making co-living a feasible alternative in this high-density city. Although the number of co-living residences has increased in Hong Kong, co-living as a housing typology is still a new concept for many. Little research has been conducted on this new housing typology, let alone the co-living experience. To address this gap, this study targeted student residents in university residential halls as it is a more controlled environment (e.g., with established rules and guidelines regarding the use of communal facilitates and housing management) for studying co-living experiences in Hong Kong. To date, no research study has systematically identified anti-social behavior (ASB) in co-living spaces. Since ASB can be influenced by factors such as social norms and individual interpretation, it has an elastic definition that results in different levels of acceptance. Unlike other types of housing, co-living spaces can be potentially more influenced by the neighborhood as residents share more time and space. As a pilot study, this research targeted one university residential hall to examine student co-living experiences. To clarify, the research question is focused on identifying the social factors that impact the residential satisfaction of those who co-living in residential halls. Quantitative data (n=100) were collected via a structured questionnaire to measure the residential environment, including ASB, social neighboring, community attachment, and perceived hall management efficacy. The survey was distributed at the end of the academic year to ensure that respondents had at least one year of first-hand experience living in a co-living space. To gather qualitative data, follow-up focus group interviews were conducted with 16 participants who completed the survey. The semi-structured interviews aimed to elicit the participants' perspectives on their co-living experience. Through analyzing their co-living experiences, the researcher identified factors that affected their residential satisfaction and provided recommendations to enhance their co-living experience.

Keywords: co-living, university residential hall, anti-social behabiour, neighbour relationship, community attachement

Procedia PDF Downloads 46
8002 Healthcare Utilization and Costs of Specific Obesity Related Health Conditions in Alberta, Canada

Authors: Sonia Butalia, Huong Luu, Alexis Guigue, Karen J. B. Martins, Khanh Vu, Scott W. Klarenbach

Abstract:

Obesity-related health conditions impose a substantial economic burden on payers due to increased healthcare use. Estimates of healthcare resource use and costs associated with obesity-related comorbidities are needed to inform policies and interventions targeting these conditions. Methods: Adults living with obesity were identified (a procedure-related body mass index code for class 2/3 obesity between 2012 and 2019 in Alberta, Canada; excluding those with bariatric surgery), and outcomes were compared over 1-year (2019/2020) between those who had and did not have specific obesity-related comorbidities. The probability of using a healthcare service (based on the odds ratio of a zero [OR-zero] cost) was compared; 95% confidence intervals (CI) were reported. Logistic regression and a generalized linear model with log link and gamma distribution were used for total healthcare cost comparisons ($CDN); cost ratios and estimated cost differences (95% CI) were reported. Potential socio-demographic and clinical confounders were adjusted for, and incremental cost differences were representative of a referent case. Results: A total of 220,190 adults living with obesity were included; 44% had hypertension, 25% had osteoarthritis, 24% had type-2 diabetes, 17% had cardiovascular disease, 12% had insulin resistance, 9% had chronic back pain, and 4% of females had polycystic ovarian syndrome (PCOS). The probability of hospitalization, ED visit, and ambulatory care was higher in those with a following obesity-related comorbidity versus those without: chronic back pain (hospitalization: 1.8-times [OR-zero: 0.57 [0.55/0.59]] / ED visit: 1.9-times [OR-zero: 0.54 [0.53/0.56]] / ambulatory care visit: 2.4-times [OR-zero: 0.41 [0.40/0.43]]), cardiovascular disease (2.7-times [OR-zero: 0.37 [0.36/0.38]] / 1.9-times [OR-zero: 0.52 [0.51/0.53]] / 2.8-times [OR-zero: 0.36 [0.35/0.36]]), osteoarthritis (2.0-times [OR-zero: 0.51 [0.50/0.53]] / 1.4-times [OR-zero: 0.74 [0.73/0.76]] / 2.5-times [OR-zero: 0.40 [0.40/0.41]]), type-2 diabetes (1.9-times [OR-zero: 0.54 [0.52/0.55]] / 1.4-times [OR-zero: 0.72 [0.70/0.73]] / 2.1-times [OR-zero: 0.47 [0.46/0.47]]), hypertension (1.8-times [OR-zero: 0.56 [0.54/0.57]] / 1.3-times [OR-zero: 0.79 [0.77/0.80]] / 2.2-times [OR-zero: 0.46 [0.45/0.47]]), PCOS (not significant / 1.2-times [OR-zero: 0.83 [0.79/0.88]] / not significant), and insulin resistance (1.1-times [OR-zero: 0.88 [0.84/0.91]] / 1.1-times [OR-zero: 0.92 [0.89/0.94]] / 1.8-times [OR-zero: 0.56 [0.54/0.57]]). After fully adjusting for potential confounders, the total healthcare cost ratio was higher in those with a following obesity-related comorbidity versus those without: chronic back pain (1.54-times [1.51/1.56]), cardiovascular disease (1.45-times [1.43/1.47]), osteoarthritis (1.36-times [1.35/1.38]), type-2 diabetes (1.30-times [1.28/1.31]), hypertension (1.27-times [1.26/1.28]), PCOS (1.08-times [1.05/1.11]), and insulin resistance (1.03-times [1.01/1.04]). Conclusions: Adults with obesity who have specific disease-related health conditions have a higher probability of healthcare use and incur greater costs than those without specific comorbidities; incremental costs are larger when other obesity-related health conditions are not adjusted for. In a specific referent case, hypertension was costliest (44% had this condition with an additional annual cost of $715 [$678/$753]). If these findings hold for the Canadian population, hypertension in persons with obesity represents an estimated additional annual healthcare cost of $2.5 billion among adults living with obesity (based on an adult obesity rate of 26%). Results of this study can inform decision making on investment in interventions that are effective in treating obesity and its complications.

Keywords: administrative data, healthcare cost, obesity-related comorbidities, real world evidence

Procedia PDF Downloads 116
8001 Chaotic Dynamics of Cost Overruns in Oil and Gas Megaprojects: A Review

Authors: O. J. Olaniran, P. E. D. Love, D. J. Edwards, O. Olatunji, J. Matthews

Abstract:

Cost overruns are a persistent problem in oil and gas megaprojects. Whilst the extant literature is filled with studies on incidents and causes of cost overruns, underlying theories to explain their emergence in oil and gas megaprojects are few. Yet, a way to contain the syndrome of cost overruns is to understand the bases of ‘how and why’ they occur. Such knowledge will also help to develop pragmatic techniques for better overall management of oil and gas megaprojects. The aim of this paper is to explain the development of cost overruns in hydrocarbon megaprojects through the perspective of chaos theory. The underlying principles of chaos theory and its implications for cost overruns are examined and practical recommendations proposed. In addition, directions for future research in this fertile area provided.

Keywords: chaos theory, oil and gas, cost overruns, megaprojects

Procedia PDF Downloads 519
8000 Identification of Factors Influencing Costs in Green Projects

Authors: Nazirah Zainul Abidin, Nurul Zahirah Mokhtar Azizi

Abstract:

Cost has always been the leading concern in green building development. The perception that construction cost for green building is higher than conventional buildings has only made the discussion of green building cost more difficult. Understanding the factors that will influence the cost of green construction is expected to shed light into what makes green construction more or at par with conventional projects, or perhaps, where cost can be optimised. This paper identifies the elements of cost before shifting the attention to the influencing factors. Findings from past studies uncovered various factors related to cost which are grouped into five focal themes i.e. awareness, knowledge, financial, technical, and government support. A conceptual framework is produced in a form of a flower diagram indicating the cost influencing factors of green building development. These factors were found to be both physical and non-physical aspects of a project. The framework provides ground for the next stage of research that is to further explore how these factors influence the project cost and decision making.

Keywords: green project, factors influencing cost, hard cost, soft cost

Procedia PDF Downloads 311
7999 Maintenance Alternatives Related to Costs of Wind Turbines Using Finite State Markov Model

Authors: Boukelkoul Lahcen

Abstract:

The cumulative costs for O&M may represent as much as 65%-90% of the turbine's investment cost. Nowadays the cost effectiveness concept becomes a decision-making and technology evaluation metric. The cost of energy metric accounts for the effect replacement cost and unscheduled maintenance cost parameters. One key of the proposed approach is the idea of maintaining the WTs which can be captured via use of a finite state Markov chain. Such a model can be embedded within a probabilistic operation and maintenance simulation reflecting the action to be done. In this paper, an approach of estimating the cost of O&M is presented. The finite state Markov model is used for decision problems with number of determined periods (life cycle) to predict the cost according to various options of maintenance.

Keywords: cost, finite state, Markov model, operation and maintenance

Procedia PDF Downloads 496
7998 Risk Reduction of Household Refuse, a Case Study of Shagari Low-Cost, Mubi North (LGA) Adamawa State, Nigeria

Authors: Maryam Tijjani Kolo

Abstract:

Lack of refuse dumping points has made the residents of Shagari low-cost well armed with some health and environmental related hazards. These studies investigate the effect of household refuse on the resident of Shagari low-cost. A well structured questionnaire was administered to elicit views of the respondent in the study area through adopting cluster sampling method. A total of 100 questionnaires were selected and divided into 50, each to both sections of the study area. Interview was conducted to each household head. Data obtained were analyzed using simple parentages to determine the major hazard in the area. Result showed that majority of the household are civil servant and traders, earning reasonable monthly income. 68% of the respondent has experienced the effect of living close to waste dumping areas, which include unpleasant smell and polluted smoke when refuse is burnt, which causes eye and respiratory induction, human injury from broken bottles or sharp objects as well as water, insect and air borne diseases. Hence, the need to urgently address these menace before it overwhelms the capacities of the community becomes paramount. Thus, the community should be given more enlightenment and refuse dumping sites should be created by the local government area.

Keywords: household, refuse, refuse dumping points, Shagari low-cost

Procedia PDF Downloads 289
7997 A Comparative Analysis of Carbon Footprints of Households in Different Housing Types and Seasons

Authors: Taehyun Kim

Abstract:

As a result of rapid urbanization, energy demands for lighting, heating and cooling of households have been concentrated in metropolitan areas. The energy resources for housing in urban areas are dominantly fossil fuel whose uses contribute to increase cost of living and carbon dioxide (CO2) emission. To achieve environmentally and economically sustainable residential development, it is important to know how energy use and cost of living can be reduced by planning and design. The purpose of this study is to examine which type of building requires less energy for housing. To do so, carbon footprint (CF) quiz survey was employed which estimates the amount of carbon dioxide required to support households’ consumption of energy uses for housing. The housing carbon footprints (HCF) of 500 households of Seoul, Korea in summer and winter were estimated and compared in three major types of housing: single-family (detached), row-house and apartment. In addition, its differences of HCF were estimated between tower and flat type of apartment. The results of T-test and analysis of variance (ANOVA) provide statistical evidence that housing type is related to housing energy use. Average HCF of detached house was higher than other housing types. Between two types of apartment, tower type shows higher HCF than flat type in winter. These findings may provide new perspectives on CF application in sustainable architecture and urban design.

Keywords: analysis of variance, carbon footprint, energy use, housing type

Procedia PDF Downloads 460
7996 Marital Status and Happiness among Employed People in Thailand

Authors: Sirinan Kittisuksathit, Wannee Hutaphat

Abstract:

This paper investigates employed people in relation to family happiness, work-life balance, and individual happiness. The employed people in this study are categorized by their marital statuses namely, single, married and living together, married and living apart, cohabitation, and divorced. The 13,906 sample of employed people collected in 2015 by using the Self-Administered Questionnaire. The analysis utilizes ANOVA to analyze the differences between group means and their associated procedures. The findings show that two types of employed people are more likely to obtain the highest average happiness scores: married and living together, and cohabitation. The two groups are subsequently followed by single employed people, and divorced employed people. The lowest average happiness scores were achieved by employed people who are married and living apart.

Keywords: employed people, happiness, marital status, Thailand

Procedia PDF Downloads 226
7995 Optimal Replacement Period for a One-Unit System with Double Repair Cost Limits

Authors: Min-Tsai Lai, Taqwa Hariguna

Abstract:

This paper presents a periodical replacement model for a system, considering the concept of single and cumulative repair cost limits simultaneously. The failures are divided into two types. Minor failure can be corrected by minimal repair and serious failure makes the system breakdown completely. When a minor failure occurs, if the repair cost is less than a single repair cost limit L1 and the accumulated repair cost is less than a cumulative repair cost limit L2, then minimal repair is executed, otherwise, the system is preventively replaced. The system is also replaced at time T or at serious failure. The optimal period T minimizing the long-run expected cost per unit time is verified to be finite and unique under some specific conditions.

Keywords: repair-cost limit, cumulative repair-cost limit, minimal repair, periodical replacement policy

Procedia PDF Downloads 330
7994 Faults in the Projects, Deviation in the Cost

Authors: S. Ahmed, P. Dlask, B. Hasan

Abstract:

There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.

Keywords: construction projects, building, cost, estimating costs, delay, overrun

Procedia PDF Downloads 257
7993 Abnormality Detection of Persons Living Alone Using Daily Life Patterns Obtained from Sensors

Authors: Ippei Kamihira, Takashi Nakajima, Taiyo Matsumura, Hikaru Miura, Takashi Ono

Abstract:

In this research, the goal was construction of a system by which multiple sensors were used to observe the daily life behavior of persons living alone (while respecting their privacy). Using this information to judge such conditions as a bad physical condition or falling in the home, etc., so that these abnormal conditions can be made known to relatives and third parties. The daily life patterns of persons living alone are expressed by the number of responses of sensors each time that a set time period has elapsed. By comparing data for the prior two weeks, it was possible to judge a situation as 'normal' when the person was in a good physical condition or as 'abnormal' when the person was in a bad physical condition.

Keywords: sensors, elderly living alone, abnormality detection, iifestyle habit

Procedia PDF Downloads 227
7992 A Review of the Major Factors of Cost Overrun in Construction Projects

Authors: Hassan Abdelgadir

Abstract:

Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.

Keywords: construction projects, cost overruns, construction company, factors effect costoverruns

Procedia PDF Downloads 36
7991 Self-Help Adaptation to Flooding in Low-Income Settlements in Chiang Mai, Thailand

Authors: Nachawit Tikul

Abstract:

This study aimed to determine low-income housing adaptations for flooding, which causes living problems and housing damage, and the results from improvement. Three low-income settlements in Chiang Mai which experienced different flood types, i.e. flash floods in Samukeepattana, drainage floods in Bansanku, and river floods in Kampangam, were chosen for the study. Almost all of the residents improved their houses to protect the property from flood damage by changing building materials to flood damage resistant materials for walls, floors, and other parts of the structure that were below the base of annual flood elevation. They could only build some parts of their own homes, so hiring skilled workers or contractors was still important. Building materials which have no need for any special tools and are easy to access and use for construction, as well as low cost, are selected for construction. The residents in the three slums faced living problems for only a short time and were able to cope with them. This may be due to the location of the three slums near the city where assistance is readily available. But the housing and the existence in the slums can endure only the regular floods and residence still have problems in unusual floods, which have been experienced 1-2 times during the past 10 years. The residents accept the need for evacuations and prepare for them. When faced with extreme floods, residence have evacuated to the nearest safe place such as schools and public building, and come back to repair the houses after the flood. These are the distinguishing characteristics of low-income living which can withstand serious situations due to the simple lifestyle. Therefore, preparation of living areas for use during severe floods and encouraging production of affordable flood resistant materials should be areas of concern when formulating disaster assistance policies for low income people.

Keywords: flooding, low-income settlement, housing, adaptation

Procedia PDF Downloads 210
7990 An Analytical Method for Maintenance Cost Estimating Relationships of Helicopters Using Linear Programming

Authors: Meesun Sun, Yongmin Kim

Abstract:

Estimating maintenance cost is crucial in defense management because it affects military budgets and availability of equipment. When it comes to estimating maintenance cost of the deployed equipment, time series forecasting can be applied with the actual historical cost data. It is more difficult issue to estimate maintenance cost of new equipment for which the actual costs are not provided. In this underlying context, this study proposes an analytical method for maintenance cost estimating relationships (CERs) development of helicopters using linear programming. The CERs can be applied to a new helicopter because they use non-cost independent variables such as the number of engines, the empty weight and so on. In the Republic of Korea, the maintenance cost of new equipment has been usually estimated by reflecting maintenance cost to unit price ratio of the legacy equipment. This study confirms that the CERs perform well for the 10 types of airmobile helicopters in terms of mean absolute percentage error by applying leave-one-out cross-validation. The suggested method is very useful to estimate the maintenance cost of new equipment and can help in the affordability assessment of acquisition program portfolios for total life cycle systems management.

Keywords: affordability analysis, cost estimating relationship, helicopter, linear programming, maintenance cost

Procedia PDF Downloads 107