11243 Innovation in Lean Thinking to Achieve Rapid Construction

Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof

Abstract:

Lean thinking holds the potential for improving the construction sector, and therefore, it is a concept that should be adopted by construction sector players and academicians in the real industry. Bridging from that, a learning process for construction sector players regarding this matter should be the agenda in gaining the knowledge in preparation for their career. Lean principles offer opportunities for reducing lead times, eliminating non-value adding activities, reducing variability, and are facilitated by methods such as pull scheduling, simplified operations and buffer reduction. Thus, the drive for rapid construction, which is a systematic approach in enhancing efficiency to deliver a project using time reduction, while lean is the continuous process of eliminating waste, meeting or exceeding all customer requirements, focusing on the entire value stream and pursuing perfection in the execution of a constructed project. The methodology presented is shown to be valid through literature, interviews and questionnaire. The results show that the majority of construction sector players unfamiliar with lean thinking and they agreed that it can improve the construction process flow. With this background knowledge established and identified, best practices and recommended action are drawn.

Keywords: construction improvement, rapid construction, time reduction, lean construction

Procedia PDF Downloads 336
11242 Lean Thinking and E-Commerce as New Opportunities to Improve Partnership in Supply Chain of Construction Industries

Authors: Kaustav Kundu, Alberto Portioli Staudacher

Abstract:

Construction industry plays a vital role in the economy of the world. But due to high uncertainty and variability in the industry, its performance is not as efficient in terms of quality, lead times, productivity and costs as of other industries. Moreover, there are continuous conflicts among the different actors in the construction supply chains in terms of profit sharing. Previous studies suggested partnership as an important approach to promote cooperation among the different actors in the construction supply chains and thereby it improves the overall performance. Construction practitioners tried to focus on partnership which can enhance the performance of construction supply chains but they are not fully aware of different approaches and techniques for improving partnership. In this research, a systematic review on partnership in relation to construction supply chains is carried out to understand different elements influencing the partnership. The research development of this domain is analyzed by reviewing selected articles published from 1996 to 2015. Based on the papers, three major elements influencing partnership in construction supply chains are identified: “Lean approach”, “Relationship building” and “E-commerce applications”. This study analyses the contributions in the areas within each element and provides suggestions for future developments of partnership in construction supply chains.

Keywords: partnership, construction, lean, SCM, supply chain management

Procedia PDF Downloads 397
11241 An Organocatalytic Construction of Vicinal Tetrasubstituted Stereocenters via Mannich Reaction of 2-Substituted Benzofuran-3-One with Isatin-Derived Ketimine

Authors: Koilpitchai Sivamuthuraman, Venkitasamy Kesavan

Abstract:

3-substituted 3-amino-2-oxindole skeleton bearing adjacent tetrasubstituted stereogenic centers is of great importance because of these heterocyclic motifs possess a wide range of pharmacological activity. The catalytic asymmetric construction of multi functionalised heterocyclic compound with adjacent tetrasubstituted stereocenters is one of the most difficult tasks in organic synthesis. To date, the most straightforward methodologies have been developed for synthesis of chiral 3-substituted 3-amino-2-oxindoles through the addition of carbon nucleophiles to isatin-derived ketimines. However, only a few successful examples have been described for the assembly of vicinal tetrasubstituted stereocenters using isatin derived ketimines as electrophiles. On the other hand, 2,2-Disubstituted benzofuran-3(2H)-ones and related frameworks are characteristic of a quaternary stereogenic center at C2 position present in quite a number of natural products and bioactive Molecules.Despite the intensive efforts devoted for the construction of 2,2-Disubstituted Benzofuran-3[2H]-one, there are only a few asymmetric methods such as organocatalytic Michael addition and enantioselective halogenations were reported till now. Due to the biological importance of oxindole and benzofuran-3-one, it is proposed here with the synthesis of hybrid molecule containing tetrasubstituted stereo centers through asymmetric organocatalysis. The addition of 2-substituted Benzofuran-3-one(1a) to isatin-derived ketimines(2a) using a bifunctional organocatalyst(catalyst IV or V), leading to chiral heterocyclic compounds containing both 3-amino 2-oxindole and benzofurn-3-one bearing vicinal quaternary stereocenters with good yields and excellent enantioselectivity. The present study extends the scope of the catalytic asymmetric Mannich reaction with isatin-derived ketimines, providing a new class of amino oxindole derivatives having benzofuran-3-one.

Keywords: asymmetric synthesis, benzofuran-3-one, isatin-derived ketimines, quaternary stereocenters

Procedia PDF Downloads 153
11240 Feature of Employment Injuries and Maintenance Works of Construction Machinery

Authors: Naoko Kanazawa, Tran Thi Bich Nguyet, Yoshiyuki Higuchi, Hideki Hamada

Abstract:

Construction machines’ condition is maintained with the regularly inspections, preventive maintenance and repairs by skillful and qualified engineers. If an accident occurs, there will be enormous influence such as human injuries, delays in the term of construction. In this paper, we revealed the characteristics such as inspection, maintenance and repair works for construction machines, and we also clarified the trends of employment injuries based on actual data by simple and cross tabulation methods, and investigated the relation with their works, injured body parts and accident types.

Keywords: construction machines, employment injuries, maintenance and repair, safety and health

Procedia PDF Downloads 264
11239 Modern Methods of Technology and Organization of Production of Construction Works during the Implementation of Construction 3D Printers

Authors: Azizakhanim Maharramli

Abstract:

The gradual transition from entrenched traditional technology and organization of construction production to innovative additive construction technology inevitably meets technological, technical, organizational, labour, and, finally, social difficulties. Therefore, the chosen nodal method will lead to the elimination of the above difficulties, combining some of the usual methods of construction and the myth in world practice that the labour force is subjected to a strong stream of reduction. The nodal method of additive technology will create favourable conditions for the optimal degree of distribution of labour across facilities due to the consistent performance of homogeneous work and the introduction of additive technology and traditional technology into construction production.

Keywords: parallel method, sequential method, stream method, combined method, nodal method

Procedia PDF Downloads 38
11238 Analysis of Delay Causes in Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study aims at identifying the risk matrix for delay causes in construction projects in Saudi Arabia from consultants’ viewpoint. A questionnaire survey was undertaken of 51 consultants working on construction projects in the Northern Province of Saudi Arabia. 35 delay causes were identified through a literature review. The study concluded that the top delay causes in construction projects in Saudi Arabia from consultants’ perspective are: bid award for lowest price, changes in material types and specifications during construction, contract management, duration of contract period, fluctuation of prices of materials, frequent changes in design, improper planning, inflationary pressure, lack of adequate manpower, long period of design and time of implementation, payments delay, poor labor productivity, and rework.

Keywords: delays, construction, consultants, contributors, risk map

Procedia PDF Downloads 495
11237 The Sustainability of Human Resource Planning for Construction Projects

Authors: Adegbenga Ashiru, Adebimpe L. Ashiru

Abstract:

The construction industry is considered to work by diversifying personnel. Hence managing human resource is an issue considered to be a highly challenging task. Nonetheless, HR planning for the construction project is a very critical aspect of managing human resource within an expanding nature of construction industry, and there are rising concerns over the failure of construction planning to achieve its goals in spite of the substantial resources allocated to it and as a result of different planning strategies. To justify the above statement, this research was carried out to examine the sustainability of HR planning for construction project. Based on the researcher’s experience, a quantitative approach was adopted that provided a broader understanding of the research and was analysed using descriptive statistics and inferential statistics. The Statistical Package for the Social Sciences (SPSS) was used to obtain the descriptive and inferential statistical analysis. However, research findings showed that literature sources agreed with varying challenges of HR planning on construction projects which were justified by empirical findings. Also, the paper identified four major factors and the key consideration for Project HR Planning (Organisation’s structure with right individuals at right positions and evaluation current resources) will lead to the efficient utilisation implementation of new HR Planning technique and tools for a construction project. Essentially the main reoccurring theme identified was that management of the construction organisations needs to look into the essential factors needed to be considered at the strategic level. Furthermore, leaders leading a construction project team should consider those essential factors needed at the operational level to clarify the numerous functions of HRM in the construction organisations and avoid inconsistencies among several practices on construction projects. The Sustainability of HR planning for construction project policy was indicated and recommendations were made for further future research.

Keywords: construction industry, HRM planning in construction, SHRM in construction, HR planning in construction

Procedia PDF Downloads 307
11236 Construction Information Visualization System Using nD CAD Model

Authors: Hyeon-seoung Kim, Sang-mi Park, Sun-ju Han, Leen-seok Kang

Abstract:

The visualization technology of construction information using 3D and nD modeling can satisfy the visualization needs of each construction project participant. The nD CAD system is a tool that the construction information, such as construction schedule, cost and resource utilization, are simulated by 4D, 5D and 6D object formats based on 3D object. This study developed a methodology and simulation engine for nD CAD system for construction project management. It has improved functions such as built-in schedule generation, cost simulation of changed budget and built-in resource allocation comparing with the current systems. To develop an integrated nD CAD system, this study attempts an integrated method to link 5D and 6D objects based on 4D object.

Keywords: building information modeling, visual simulation, 3D object, nD CAD augmented reality

Procedia PDF Downloads 271
11235 Recycling Construction Waste Materials to Reduce the Environmental Pollutants

Authors: Mehrdad Abkenari, Alireza Rezaei, Naghmeh Pournayeb

Abstract:

There have recently been many studies and investments in developed and developing countries regarding the possibility of recycling construction waste, which are still ongoing. Since the term 'construction waste' covers a vast spectrum of materials in constructing buildings, roads and etc., many investigations are required to measure their technical performance in use as well as their time and place of use. Concrete is among the major and fundamental materials used in current construction industry. Along with the rise of population in developing countries, it is desperately required to meet the people's primary need in construction industry and on the other hand, dispose existing wastes for reducing the amount of environmental pollutants. Restrictions of natural resources and environmental pollution are the most important problems encountered by civil engineers. Reusing construction waste is an important and economic approach that not only assists the preservation of environment but also, provides us with primary raw materials. In line with consistent municipal development in disposal and reuse of construction waste, several approaches including, management of construction waste and materials, materials recycling and innovation and new inventions in materials have been predicted. This article has accordingly attempted to study the activities related to recycling of construction wastes and then, stated the economic, quantitative, qualitative and environmental results obtained.

Keywords: civil engineering, environment, recycling, construction waste

Procedia PDF Downloads 263
11234 BIM-based Construction Noise Management Approach With a Focus on Inner-City Construction

Authors: Nasim Babazadeh

Abstract:

Growing demand for a quieter dwelling environment has turned the attention of construction companies to reducing the propagated noise of their project. In inner-city constructions, close distance between the construction site and surrounding buildings lessens the efficiency of passive noise control methods. Dwellers of the nearby areas may file complaints and lawsuits against the construction companies due to the emitted construction noise, thereby leading to the interruption of processes, compensation costs, or even suspension of the project. Therefore, construction noise should be predicted along with the project schedule. The advantage of managing the noise in the pre-construction phase is two-fold. Firstly, changes in the time plan and construction methods can be applied more flexibly. Thus, the costs related to rescheduling can be avoided. Secondly, noise-related legal problems are expected to be reduced. To implement noise mapping methods for the mentioned prediction, the required detailed information (such as the location of the noisy process, duration of the noisy work) can be exported from the 4D BIM model. The results obtained from the noise maps would be used to help the planners to define different work scenarios. The proposed approach has been applied for the foundation and earthwork of a site located in a residential area, and the obtained results are discussed.

Keywords: building information modeling, construction noise management, noise mapping, 4D BIM

Procedia PDF Downloads 135
11233 A Review: Recycled Materials Used in Construction

Authors: Oghenerukome Akponovo, Lynda I. Onyebuchukwu

Abstract:

Construction waste, along with that of many other industries, contributes significantly to the world's annual solid waste totals. Most of these materials, such as ash from rice hulls, slags, cement kiln dust, tire ash, plastic waste (PW), and silica fumes, end up in landfills or waterways. Some of them might even end up polluting the air from high in the atmosphere. It's sustainable, cheap, and environmentally friendly to recycle these items into new building supplies. When constructing a "Green" structure, the materials employed have the potential to either exacerbate environmental imbalance or maintain a stable ecosystem. The purpose of this research is to take stock of what is already known about recycling's potential in the construction industry and to identify its deficiencies. Therefore, this study systematically reviews the wide range of recycled materials that go into building construction. Recognizing that the construction industry's use of recycled materials has an influence on the environment and that investigating these materials may have a substantial economic impact if they were discovered

Keywords: building, construction, recycled materials, waste management

Procedia PDF Downloads 64
11232 Growth of Public Listed Construction Companies in Malaysia

Authors: M. C. Theong, F. L. Ang, G. J. Muga

Abstract:

Growth of firms is influenced by environmental changes such as the global and national economy. On the other hand, it indicates the economic situation of a country. Therefore, it is imperative for firms to be sensitive to changes and to stay competitive and remain compatible with the environment. The Malaysian construction industry is prone to environmental changes due to its complexity. In order to survive in the construction industry, focus on the development of the firms themselves to achieve long term their long term goals is vital besides maximizing profits. The objective of this paper is to measure growth of the public listed construction companies in Malaysia and to investigate the development of the companies with highest, moderate and lowest growth. Growth is measured based on the companies' sales between year 2008 and 2012 collected via secondary data collection method. Findings show that the highest average growth created is 235.20 % while the lowest average growth is -22.75%. The construction companies remained active in the construction industry by implementing different sets of strategies and involving in several types of construction projects.

Keywords: growth, Malaysian construction industry, public listed companies, sales

Procedia PDF Downloads 339
11231 A Study of Carbon Emissions during Building Construction

Authors: Jonggeon Lee, Sungho Tae, Sungjoon Suk, Keunhyeok Yang, George Ford, Michael E. Smith, Omidreza Shoghli

Abstract:

In recent years, research to reduce carbon emissions through quantitative assessment of building life cycle carbon emissions has been performed as it relates to the construction industry. However, most research efforts related to building carbon emissions assessment have been focused on evaluation during the operational phase of a building’s life span. Few comprehensive studies of the carbon emissions during a building’s construction phase have been performed. The purpose of this study is to propose an assessment method that quantitatively evaluates the carbon emissions of buildings during the construction phase. The study analysed the amount of carbon emissions produced by 17 construction trades, and selected four construction trades that result in high levels of carbon emissions: reinforced concrete work; sheathing work; foundation work; and form work. Building materials, and construction and transport equipment used for the selected construction trades were identified, and carbon emissions produced by the identified materials and equipment were calculated for these four construction trades. The energy consumption of construction and transport equipment was calculated by analysing fuel efficiency and equipment productivity rates. The combination of the expected levels of carbon emissions associated with the utilization of building materials and construction equipment provides means for estimating the quantity of carbon emissions related to the construction phase of a building’s life cycle. The proposed carbon emissions assessment method was validated by case studies.

Keywords: building construction phase, carbon emissions assessment, building life cycle

Procedia PDF Downloads 711
11230 Comparative Life Cycle Analysis of Selected Modular Timber Construction and Assembly Typologies

Authors: Benjamin Goldsmith, Felix Heisel

Abstract:

The building industry must reduce its emissions in order to meet 2030 neutrality targets, and modular and/or offsite construction is seen as an alternative to conventional construction methods which could help achieve this goal. Modular construction has previously been shown to be less wasteful and has a lower global warming potential (GWP). While many studies have been conducted investigating the life cycle impacts of modular and conventional construction, few studies have compared different types of modular assembly and construction in order to determine which offer the greatest environmental benefits over their whole life cycle. This study seeks to investigate three different modular construction types -infill frame, core, and podium- in order to determine environmental impacts such as GWP as well as circularity indicators. The study will focus on the emissions of the production, construction, and end-of-life phases. The circularity of the various approaches will be taken into consideration in order to acknowledge the potential benefits of the ability to reuse and/or reclaim materials, products, and assemblies. The study will conduct hypothetical case studies for the three different modular construction types, and in doing so, control the parameters of location, climate, program, and client. By looking in-depth at the GWP of the beginning and end phases of various simulated modular buildings, it will be possible to make suggestions on which type of construction has the lowest global warming potential.

Keywords: modular construction, offsite construction, life cycle analysis, global warming potential, environmental impact, circular economy

Procedia PDF Downloads 124
11229 Anti-Corruption, an Important Challenge for the Construction Industry!

Authors: Ahmed Stifi, Sascha Gentes, Fritz Gehbauer

Abstract:

The construction industry is perhaps one of the oldest industry of the world. The ancient monuments like the egyptian pyramids, the temples of Greeks and Romans like Parthenon and Pantheon, the robust bridges, old Roman theatres, the citadels and many more are the best testament to that. The industry also has a symbiotic relationship with other . Some of the heavy engineering industry provide construction machineries, chemical industry develop innovative construction materials, finance sector provides fund solutions for complex construction projects and many more. Construction Industry is not only mammoth but also very complex in nature. Because of the complexity, construction industry is prone to various tribulations which may have the propensity to hamper its growth. The comparitive study of this industry with other depicts that it is associated with a state of tardiness and delay especially when we focus on the managerial aspects and the study of triple constraint (time, cost and scope). While some institutes says the complexity associated with it as a major reason, others like lean construction, refers to the wastes produced across the construction process as the prime reason. This paper introduces corruption as one of the prime factors for such delays.To support this many international reports and studies are available depicting that construction industry is one of the most corrupt sectors worldwide, and the corruption can take place throught the project cycle comprising project selection, planning, design, funding, pre-qualification, tendering, execution, operation and maintenance, and even through the reconstrction phase. It also happens in many forms such as bribe, fraud, extortion, collusion, embezzlement and conflict of interest and the self-sufficient. As a solution to cope the corruption in construction industry, the paper introduces the integrity as a key factor and build a new integrity framework to develop and implement an integrity management system for construction companies and construction projects.

Keywords: corruption, construction industry, integrity, lean construction

Procedia PDF Downloads 337
11228 Effect of Project Control Practices on the Performance of Building Construction Companies in Uganda: A Case Study of Kampala City

Authors: Tukundane Hillary

Abstract:

This research paper analytically evaluates the project control practice levels used by the building construction companies within Kampala, Uganda. The research also assesses the outcome of project control practices on the productivity of the companies. The research was performed to ascertain the current control practices among 160 respondents from various construction companies registered with the Uganda Registration Services Bureau. This research used amalgamation from multiple literature to obtain the variables. The research adopts 34 standard control practices from four vital project control duties: planning, monitoring, analyzing, and reporting. These project control tasks were organized using mean response ratings grounded on their relevance to the construction companies. Results showed that evaluating performance with the use of curves (4.32), timely access to information and encouragement (4.55), report representation using quantitative tools 4.75, and cost value comparison application during analysis (4.76) were rated least among the control practices. On the other hand, the top project control practices included formulation of the project schedule (8.88), Project feasibility validation (8.86), Budgeting for each activity (8.84), Key project route definition (8.81), Team awareness of the budget (8.77), Setting realistic targets for projects (8.50) and Consultation from subcontractors (8.74). From the results obtained by the sample respondents specified, it can be concluded that planning is the most vital project control task practiced in the building construction industry in Uganda. In addition, this research ascertained a substantial relationship between project control practices and the performance of building construction companies. Accordingly, this research recommends that project control practices be effectively observed by both contracting and consulting companies to enhance their overall performance and governance.

Keywords: cost value, project control, cost control, time control, project performance, control practices

Procedia PDF Downloads 16
11227 Cost Overrun Causes in Public Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study is conducted to identify causes of cost deviations in public construction projects in Saudi Arabia from contractors’ perspective. 41 factors that might affect cost estimating accuracy were identified through literature review and discussion with some construction experts. The factors were tabulated in a questionnaire form and a field survey included 51 contractors from the Northern Province of Saudi Arabia was performed. The results show that the top five important causes are: wrong estimation method, long period between design and time of implementation, cost of labor, cost of machinary and absence of construction-cost data.

Keywords: cost deviation, public construction, cost estimating, Saudi Arabia, contractors

Procedia PDF Downloads 424
11226 Evaluation of Traditional Methods in Construction and Their Effects on Reinforced-Concrete Buildings Behavior

Authors: E. H. N. Gashti, M. Zarrini, M. Irannezhad, J. R. Langroudi

Abstract:

Using ETABS software, this study analyzed 23 buildings to evaluate effects of mistakes during construction phase on buildings structural behavior. For modelling, two different loadings were assumed: 1) design loading and 2) loading due to the effects of mistakes in construction phase. Research results determined that considering traditional construction methods for buildings resulted in a significant increase in dead loads and consequently intensified the displacements and base-shears of buildings under seismic loads.

Keywords: reinforced-concrete buildings, construction mistakes, base-shear, displacements, failure

Procedia PDF Downloads 230
11225 Resource Leveling Optimization in Construction Projects of High Voltage Substations Using Nature-Inspired Intelligent Evolutionary Algorithms

Authors: Dimitrios Ntardas, Alexandros Tzanetos, Georgios Dounias

Abstract:

High Voltage Substations (HVS) are the intermediate step between production of power and successfully transmitting it to clients, making them one of the most important checkpoints in power grids. Nowadays - renewable resources and consequently distributed generation are growing fast, the construction of HVS is of high importance both in terms of quality and time completion so that new energy producers can quickly and safely intergrade in power grids. The resources needed, such as machines and workers, should be carefully allocated so that the construction of a HVS is completed on time, with the lowest possible cost (e.g. not spending additional cost that were not taken into consideration, because of project delays), but in the highest quality. In addition, there are milestones and several checkpoints to be precisely achieved during construction to ensure the cost and timeline control and to ensure that the percentage of governmental funding will be granted. The management of such a demanding project is a NP-hard problem that consists of prerequisite constraints and resource limits for each task of the project. In this work, a hybrid meta-heuristic method is implemented to solve this problem. Meta-heuristics have been proven to be quite useful when dealing with high-dimensional constraint optimization problems. Hybridization of them results in boost of their performance.

Keywords: hybrid meta-heuristic methods, substation construction, resource allocation, time-cost efficiency

Procedia PDF Downloads 107
11224 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image

Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang

Abstract:

Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.

Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image

Procedia PDF Downloads 472
11223 An Evaluation of the Effectiveness of Health and Safety Induction Practices in the Zambian Construction Industry

Authors: Josephine Mutwale-Ziko, Nonde Lushinga, Inonge Akakandelwa

Abstract:

The study discusses the effectiveness of health and safety induction practices on construction sites against the background of the Zambian construction industry experience. The research design included the literature review of relevant literature. Questionnaires and interviews were administered to regulatory bodies, health, and safety personnel. Observation was also employed on construction sites to assess the health and safety practices being used. Health and safety in the construction industry are not something to be ignored or overlooked. The construction industry needs to take heed of the serious consequences of inadequate health and safety induction practices. The implications of inadequate health and safety induction procedures included among others threats to profitability, corporate social responsibility and increased turnover of the workforce leading to poor productivity. Adequate health and safety practices can improve the health and wellbeing of employees, reduce financial implications on firms and encourage productivity on construction sites. Despite this, accidents are still prevalent on construction sites in Zambia. The overall result of this research denotes that the implementation of health and safety induction practices is inadequate, as indicated by the negligent and non-adherent attitude to health and safety induction aspects on the sites by most stakeholders on construction sites. Therefore, health and safety induction practices are ineffective as preventive measures for reduction of accidents on construction sites in Zambia.

Keywords: accidents, health and safety, inadequate, induction

Procedia PDF Downloads 389
11222 Assessment of Health and Safety Item on Construction Site in Ondo State

Authors: Ikumapayi Catherine Mayowa

Abstract:

The well-being of humans on a construction site is critical; abundant manpower had been lost through accidents which kill or make workers physically unfit to carry out construction activities, these, in turn, have multiple effects on the whole economy. Thus, it is necessary to put all safety items and regulations in place before construction activities can commence. This study was carried out in the Ondo state of Nigeria to investigate and analyze the state of health and safety of construction workers in the state. The study was done using first-hand observations, 50 construction project sites were visited in ten major towns of Ondo state, questionnaires were distributed, and the results were analyzed. The result shows that construction workers are being exposed to many construction site hazards due to lack of inadequate safety programs and lack of appropriate safety equipment for workers on site. From the data gotten from each site visited and the statistical analysis, it can be concluded that occurrences of an accident on construction sites depend significantly on the available safety facilities on the sites. The result of the regression statistics shows that the dependence of the frequency of occurrence of an accident on the availability of safety items on the site is 0.0362 which is less than 0.05 maximum significant level allowed. Therefore, a vital way of sustaining our building strategy is given a detail attention to the provision of adequate health and safety items on construction sites which will reduce the occurrence of accident, loss of manpower and death of skilled workers.

Keywords: construction sites, health, safety, welfare

Procedia PDF Downloads 288
11221 Fatigue Evaluation of Link Slab for Continuous Girder-Type Precast Modular Bridges

Authors: Jae-Joon Song, Sang-Yoon Lee, Bong-Chul Joo

Abstract:

The girder-type precast modular bridge has been developed as a simply supported bridge. The girder-type precast modular bridge could be applied to the multi-span bridges through the continuity method. The continuity of the girder-type precast modular bridge is achieved by using the link slab which is easy to construction and appropriate to the rapid construction. In this study, the link slab with transition zone was used for the continuity of the precast modular bridges, and the construction detail of link slab was modified. In addition, the modified iterative design method of link slab was proposed in this study. To verify the proposed design method, the fatigue test using the mock-up specimen was conducted with cycle loading condition up to two million cycles.

Keywords: precast, modular bridge, link slab

Procedia PDF Downloads 402
11220 Appraisal of Incentive Schemes for Employees: A Case of Construction Smes

Authors: B. M. Arthur-Aidoo, C. O. Aigbavboa, W. D. Thwala

Abstract:

The performance of construction employees cannot be underestimated if the success of construction projects are to be achieved. This is because the construction industry has been characterised as labour oriented sector, which most of its activities being executed by labour. In the construction sector, employees are driven by incentive schemes which perform encourage and motivate workers for higher efficiency and higher output. The construction sector, however, depends mainly on its labour. In view of the sector's high dependency on its employees, that there must be a significant incentive scheme which must be established to act as a stimulus to drive high performance from employees among the various known incentive packages. This study, therefore, seeks to appraise the incentive packages adopted by construction SMEs. To establish reliable findings that will contribute to knowledge, the study utilised an exploratory approach via semi-structured interviews among sampled construction professionals with the requisite expertise on employees' incentive schemes. The study further established that although incentive schemes are classified in various ways and mediums that act as stimuli to encourage high performance among employees, some are more influential and impacts performance than others. Additionally, the study concludes that medical allowance, holiday with pay, free working tools, and training for employees were ranked the most influential incentives that promote high outputs by workers within the construction SME sector.

Keywords: appraisal, construction, employees, incentive, small and medium-sized enterprises, SMEs

Procedia PDF Downloads 92
11219 The Influence of Construction Workers Wages and Working Conditions on Productivity in Ghana

Authors: Emmanuel Donkor

Abstract:

Aim/Purpose – This paper examines the influence of construction workers wages and working conditions on productivity in Ghana. Design/methodology/Approach - The study adopted a quantitative research approach with purposive sampling techniques where data was collected using surveys. The data were analyzed using SPSS software version 20.0, which enables the findings of the study to be examined under thematic areas.Findings: - The study revealed that good wages and working condition of workers have a positive correlation on productivity in the construction industry. Increase and improved wages and working conditions can results in higher productivity in the construction industry.Originality/value - This paper is exceptional in the sense that, it does examine the influence of construction workers wages and working conditions on productivity in Ghana. Social value/implications - The paper concludes that workers’ wages and their conditions have a high influence on productivity. It is then recommended that government should train, educate, give good wages to workers and improve on their working condition, give incentives and reduce tax importation on building or construction materials to aid in good productivity of construction firms.

Keywords: construction firms, construction industry, productivity, workers’ wages, working conditions

Procedia PDF Downloads 101
11218 Hybrid Risk Assessment Model for Construction Based on Multicriteria Decision Making Methods

Authors: J. Tamosaitiene

Abstract:

The article focuses on the identification and classification of key risk management criteria that represent the most important sustainability aspects of the construction industry. The construction sector is one of the most important sectors in Lithuania. Nowadays, the assessment of the risk level of a construction project is especially important for the quality of construction projects, the growth of enterprises and the sector. To establish the most important criteria for successful growth of the sector, a questionnaire for experts was developed. The analytic hierarchy process (AHP), the expert judgement method and other multicriteria decision making (MCDM) methods were used to develop the hybrid model. The results were used to develop an integrated knowledge system for the measurement of a risk level particular to construction projects. The article presents a practical case that details the developed system, sustainable aspects, and risk assessment.

Keywords: risk, system, model, construction

Procedia PDF Downloads 127
11217 Delay Studies in Construction: Synthesis, Critical Evaluation, and the Way Forward

Authors: Abdullah Alsehaimi

Abstract:

Over decades, there have been many studies of delay in construction, and this type of study continues to be popular in construction management research. A synthesis and critical evaluation of delay studies in developing countries reveals that poor project management is cited as one of the main causes of delay. However, despite such consensus, most of the previous studies fall short in providing clear recommendations demonstrating how project management practice could be improved. Moreover, the majority of recommendations are general and not devoted to solving the difficulties associated with particular delay causes. This paper aims to demonstrate that the root cause of this state of affairs is that typical research into delay tends to be descriptive and explanatory, making it inadequate for solving persistent managerial problems in construction. It is contended that many problems in construction could be mitigated via alternative research approaches, i.e. action and constructive research. Such prescriptive research methods can assist in the development and implementation of innovative tools tackling managerial problems of construction, including that of delay. In so doing, those methods will better connect research and practice, and thus strengthen the relevance of academic construction management.

Keywords: construction delay, action research, constructive research, industrial engineering

Procedia PDF Downloads 391
11216 Application of Proper Foundation in Building Construction

Authors: Chukwuma Anya, Mekwa Eme

Abstract:

Foundation is popularly defined as the lowest load-bearing part of a building, typically below the ground level. It serves as an underlying base which acts as the principle on which every building stands. There are various types of foundations in practice, which includes the strip, pile, pad, and raft foundations, and each of these have their various applications in building construction. However due to lack of professional knowledge, cost, or scheduled time frame to complete a certain project, some of these foundation types are some times neglected or used interchangeably, resulting to misuse or abuse of the building materials man, power, and some times altering the stability, balance and aesthetics of most buildings. This research work is aimed at educating the academic community on the proper application of the various foundation types to suit different environments such as the rain forest, desert, swampy area, rocky area etc. A proper application of the foundation will ensure the safety of the building from acid grounds, damping and weakening of foundation, even building settlement and stability. In addition to those, it will improve aesthetics, maintain cost effectiveness both construction cost and maintenance cost. Finally it will ensure the safety of the building and its inhabitants. At the end of this research work we will be able to differentiate the various foundation types and there proper application in the design and construction of buildings.

Keywords: foundation, application, stability, aesthetics

Procedia PDF Downloads 30
11215 Necessity of Using Cellular Lightweights Concrete in Construction Sector

Authors: Soner Guler, Fuat Korkut

Abstract:

Recently, the using of lightweights concretes in construction sector is rapidly increasing all over the world. Faster construction, low density and thermal transmitting coefficient and high fire resistance are the remarkable characteristics of the lightweight concretes. Lightweight concrete can be described as a type of concrete which enhance the volume of the mixture while giving additional advantages such as to reduce the dead weight of the structures. It is lighter than the conventional concrete. The use of lightweight concrete has been widely spread across countries such as USA, United Kingdom, and Sweden. In this study, the necessity of the using of lightweights concretes in the construction sector is emphasized and evaluated briefly for the architectures and civil engineers.

Keywords: lightweights concretes, low density, low thermal coefficient, construction sector

Procedia PDF Downloads 477
11214 Productivity of Construction Companies Using the Management of Threats and Opportunities ‎in Construction Projects of Iran

Authors: Nima Amani, Ali Salehi Dastjerdi, Fatemeh Ahmadi, Ardalan Sabamehr

Abstract:

The cost overrun of the construction projects has always been one of the main problems of the construction companies caused by the risky nature of the construction projects. Therefore, today, the application of risk management is inevitable. Although in theory, the issue of risk management is divided into the opportunities and threats management, in practice, most of the projects have been focused on the threats management. However, considering the opportunities management and applying the opportunities-response strategies can lead to the improved profitability of the construction projects of the companies. In this paper, a new technique is developed to identify the opportunities in the construction projects using an improved protocol and propose the appropriate opportunities-response strategies to the construction companies to provide them with higher profitability. To evaluate the effectiveness of the protocol for selecting the most appropriate strategies in ‎response to the opportunities and threats, two projects from a construction company in Iran were ‎studied. Both projects selected were in mid-range in terms of size and similar in terms of time, ‎run time and costs. Finally, the output indicates that using the proposed opportunities-response strategies show that the company's profitability in the future can be increased approximately for similar projects.

Keywords: opportunities management, risk-response strategy, opportunity-response strategy, productivity, risk management

Procedia PDF Downloads 193