Search results for: Tuanjai Somboonwiwat
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2

Search results for: Tuanjai Somboonwiwat

2 Identifying Principle Components Affecting Competitiveness of Thai Automotive Parts Industry

Authors: Thanatip Lerttanaporn, Tuanjai Somboonwiwat, Charoenchai Khompatraporn

Abstract:

The automotive parts industry is one of the vital sectors in Thai economy and now is facing a greater competition from ASEAN Economic Community (AEC). This article identifies important factors that impact the competitiveness of Thai automotive parts industry. There are eight groups of factors with a total of 58 factors. Due to a variety of factors, the Exploratory Factor Analysis and Principle Component Analysis have been applied to classify factors into groups or principle components. The results show that there are 15 groups and four of them are critical, covering 80% of important value. These four critical groups are then used to formulate strategies to improve the competitiveness of the Thai automotive parts industry.

Keywords: factor analysis, Thai automotive parts, principle components, exploratory factor, ASEAN economic community

Procedia PDF Downloads 218
1 Mixed Model Sequencing in Painting Production Line

Authors: Unchalee Inkampa, Tuanjai Somboonwiwat

Abstract:

Painting process of automobiles and automobile parts, which is a continuous process based on EDP (Electrode position paint, EDP). Through EDP, all work pieces will be continuously sent to the painting process. Work process can be divided into 2 groups based on the running time: Painting Room 1 and Painting Room 2. This leads to continuous operation. The problem that arises is waiting for workloads onto Painting Room. The grading process EDP to Painting Room is a major problem. Therefore, this paper aim to develop production sequencing method by applying EDP to painting process. It also applied fixed rate launching for painting room and earliest due date (EDD) for EDP process and swap pairwise interchange for waiting time to a minimum of machine. The result found that the developed method could improve painting reduced waiting time, on time delivery, meeting customers wants and improved productivity of painting unit.

Keywords: sequencing, mixed model lines, painting process, electrode position paint

Procedia PDF Downloads 383