Search results for: Setyawan%20Wahyu%20Pradana
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4

Search results for: Setyawan%20Wahyu%20Pradana

4 The Influence of Marxism Theory in Malaka's Perspective in Indonesia

Authors: Farhan Alam Farhan Alam, Fatah Nugroho, Setyawan Wahyu Pradana

Abstract:

Tan Malaka was a great Indonesian Marxism thinker. His idea of Marxism give encouragement to the struggle for Indonesian independence. Furthermore, it refers to what Marx said as the flexibility of a Marxist. Tan Malaka developed the Marxist theory against what have already existed so that Marxism can be harmonized and compatible with the context of Indonesia. For example, Tan Malaka initiated the cooperation between the Marxist movement and Pan-Islamism. The collaboration of Islam with Marxism which is so contradictive at that time was seen by Tan Malaka as a necessity in order to against capitalism. By using study literature and historiography methods, this paper attempts to analyze the application of the Marxism theory in the Tan Malaka’s perspective in Indonesia today in order to counter capitalism currently. His perspective combines Marxism with Islam as a solid collaboration of ideology.

Keywords: Indonesia, Marxism, Islam, Marxist theory, Tan Malaka

Procedia PDF Downloads 275
3 Performance of the Hybrid Loop Heat Pipe

Authors: Nandy Putra, Imansyah Ibnu Hakim, Iwan Setyawan, Muhammad Zayd A.I

Abstract:

A two-phase cooling technology of passive system sometimes can no longer meet the cooling needs of an increasingly challenging due to the inherent limitations of the capillary pumping for example in terms of the heat flux that can lead to dry out. In this study, intended to overcome the dry out with the addition of a diaphragm, they pump to accelerate the fluid transportation from the condenser to the evaporator. Diaphragm pump installed on the bypass line. When it did not happen dry out then the hybrid loop heat pipe will be work passively using a capillary pressure of wick. Meanwhile, when necessary, hybrid loop heat pipe will be work actively, using diaphragm pump with temperature control installed on the evaporator. From the results, it can be said that the pump has been successfully overcome dry out and can distribute working fluid from the condenser to the evaporator and reduce the temperature of the evaporator from 143°C to 100°C as a temperature controlled where the pump start actively at set point 100°C.

Keywords: hybrid, heat pipe, dry out, assisted, pump

Procedia PDF Downloads 318
2 The Application of Animal Welfare for Madura Cow Racing Competition in Madura Island

Authors: Mustopa, Setyawan Wahyu Pradana

Abstract:

This study aims to determine the application of animal welfare in Madura cow racing competition at Sumenep district, Madura Island. This study conducted by survey and discussion methods with 3 Madura cow owners in the competition. The animal welfare is going to be proved by observing the condition of the cage, the cleanliness of it, feeding and water, the health of the cow, also owner treatments for their Madura cow that will be served as a racer. Observations made using stable conditions ACRES form with assessment scores ranged from 1 = very poor, 2 = poor, 3 = regular, 4 = good and 5 = very good, animal welfare conditions seen by conducting observations and interviews with Madura cow owners. The result shows that the Madura cow competition has fulfilled the criteria of animal welfare application. Application of animal welfare principle by the owner of Madura cow terms of ACRES (Animal Concerns Research and Education Society) below standard, the average score obtained was 2.06, which is mean in a poor ratings. Besides considering the animal welfare application, Madura cow owners also do special treatments for their Madura cow with purpose to produce racers that are healthy and fast. Therefore, if the cow wins in Madura cow racing competition, it will purchase a high-value price.

Keywords: animal welfare, competition, Madura cow, racing

Procedia PDF Downloads 241
1 A Review: The Impact of Core Quality the Empirical Review of Critical Factors on the Causes of Delay in Road Constructions Projects in the GCC Countries

Authors: Sulaiman Al-Hinai, Setyawan Widyarto

Abstract:

The aim of this study is to identify the critically dominating factors on the delays of road constructions in the GCC countries and their effects on project delivery in Arab countries. Towards the achieved of the objectives the study used the empirical literature from the all relevant online sources and database as many as possible. The findings of this study have summarized and short listed of the success factors in the two categories such as internal and external factors have caused to be influenced to delay of road constructions in the Arab regions. However, in the category of internal factors, there are 63 factors short listed from seven group of factors which has revealed to effects on the delay of road constructions especially, the consultant related factors, the contractor related factors, designed related factors, client related factors, labor related factors, material related issues, equipment related issues respectively. Moreover, for external related factors are also considered to summarized especially natural disaster (flood, hurricanes and cyclone etc.), conflict, war, global financial crisis, compensation delay to affected property owner, price fluctuated, unexpected ground conditions (soil and high-water level), changing of government regulations and laws, delays in obtaining permission from municipality, loss of time by traffic control and restrictions at job site, problem with inhabitant of community, delays in providing service from utilities (water and electricity’s) and accident during constructions accordingly. The present study also concluded the effects of above factors which has delay road constructions through increasing of cost and overrun it, taken overtime, creating of disputes, going for lawsuits, finally happening of abandon of projects. Thus, the present study has given the following recommendations to overcome of above problems by increasing of detailed site investigations, ensure careful monitoring and regular meetings, effective site management, collaborative working and effective coordination’s, proper and comprehensive planning and scheduling and ensure full and intensive commitment from all parties accordingly.

Keywords: Arab GCC countries, critical success factors, road constructions delay, project management

Procedia PDF Downloads 96