Search results for: Norliza Saparin
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5

Search results for: Norliza Saparin

5 Study on Total Chlorine in Crude Palm Oil from Various Palm Oil Mill Operation Units

Authors: Norliza Saparin, Ahmadilfitri Noor, Mohd Suria Affandi Yusoff, Shawaluddin Tahiruddin

Abstract:

A palm oil mill produces crude palm oil (CPO) and has many operation units that comprises of sterilization, stripping, digestion and pressing, clarification, purification, drying and storage. This study investigated the total chlorine in palm fruit and CPO after each operating units. The total chlorine were determined by Mitsubishi NSX-2100 H, Trace Elemental Analyzer. The trace elemental analyzer is a furnace system with a micro-coulometric detector that was used for measuring and detecting total chlorine whether in organic or inorganic form. This determination is important as the chlorine is a direct precursor for 3-MCPD ester.

Keywords: chlorine, micro-coulometric, palm oil, 3-MCPD

Procedia PDF Downloads 619
4 Enzymatic Remediation in Standard Crude Palm Oil for Superior Quality Oil

Authors: Haniza Ahmad, Norliza Saparin, Ahmadilfitri Md Noor, Mohd Suria Affandi Yusoff

Abstract:

Enzymatic remediation is applied in low free fatty acid (FFA) (<4%) crude palm oil (CPO) to investigate if further FFA reduction is able to take place to produce premium CPO (<1% FFA). There are four different lipase Candida Antartica brands used in this study. Samples submit to enzymatic remediation using rotary evaporator under 100mbar vacuum with rotation at 260rpm. Samples were taken at 4hours, 8hours and 24hours for analyses. FFA less than 1% was achieved after 24hours reaction with 1% enzyme and 2% glycerol. The FFA reduction was intensified with the presence of glycerol who provides more sites for fatty acid attachment. At 2% glycerol, 71-88% FFA was reduced whereas at 1% glycerol, 46-75% FFA reduced. However, partial glycerides was increased with presence of glycerol with 2% add in glycerol showed greater partial glycerides increment compared to 1% glycerol.

Keywords: enzymes, crude palm oil, free fatty acid, glycerol

Procedia PDF Downloads 290
3 Micro-CT Assessment of Fracture Healing in Androgen-Deficient Osteoporosis Model

Authors: Ahmad N. Shuid, Azri Jalil, Sabarul A. Mokhtar, Mohd F. Khamis, Norliza Muhammad

Abstract:

Micro-CT provides a 3-D image of fracture callus, which can be used to calculate quantitative parameters. In this study, micro-CT was used to assess the fracture healing of orchidectomised rats, an androgen-deficient osteoporosis model. The effect of testosterone (hormone replacement) on fracture healing was also assessed with micro-CT. The rats were grouped into orchidectomised-control (ORX), sham-operated (SHAM), and orchidectomised; and injected with testosterone intramuscularly once weekly (TEN). Treatment duration was six weeks. The fracture was induced and fixed with plates and screws in the right tibia of all the rats. An in vitro micro-CT was used to scan the fracture callus area which consisted of 100 axial slices above and below fracture line. The analysis has shown that micro-CT was able to detect a significant difference in the fracture healing rate of ORX and TEN groups. In conclusion, micro-CT can be used to assess fracture healing in androgen-deficient osteoporosis. This imaging tool can be used to test agents that influence fracture healing in the androgen-deficient model.

Keywords: androgen, fracture, orchidectomy, osteoporosis

Procedia PDF Downloads 506
2 Risk Based Inspection and Proactive Maintenance for Civil and Structural Assets in Oil and Gas Plants

Authors: Mohammad Nazri Mustafa, Sh Norliza Sy Salim, Pedram Hatami Abdullah

Abstract:

Civil and structural assets normally have an average of more than 30 years of design life. Adding to this advantage, the assets are normally subjected to slow degradation process. Due to the fact that repair and strengthening work for these assets are normally not dependent on plant shut down, the maintenance and integrity restoration of these assets are mostly done based on “as required” and “run to failure” basis. However unlike other industries, the exposure in oil and gas environment is harsher as the result of corrosive soil and groundwater, chemical spill, frequent wetting and drying, icing and de-icing, steam and heat, etc. Due to this type of exposure and the increasing level of structural defects and rectification in line with the increasing age of plants, assets integrity assessment requires a more defined scope and procedures that needs to be based on risk and assets criticality. This leads to the establishment of risk based inspection and proactive maintenance procedure for civil and structural assets. To date there is hardly any procedure and guideline as far as integrity assessment and systematic inspection and maintenance of civil and structural assets (onshore) are concerned. Group Technical Solutions has developed a procedure and guideline that takes into consideration credible failure scenario, assets risk and criticality from process safety and structural engineering perspective, structural importance, modeling and analysis among others. Detailed inspection that includes destructive and non-destructive tests (DT & NDT) and structural monitoring is also being performed to quantify defects, assess severity and impact on integrity as well as identify the timeline for integrity restoration. Each defect and its credible failure scenario is assessed against the risk on people, environment, reputation and production loss. This technical paper is intended to share on the established procedure and guideline and their execution in oil & gas plants. In line with the overall roadmap, the procedure and guideline will form part of specialized solutions to increase production and to meet the “Operational Excellence” target while extending service life of civil and structural assets. As the result of implementation, the management of civil and structural assets is now more systematically done and the “fire-fighting” mode of maintenance is being gradually phased out and replaced by a proactive and preventive approach. This technical paper will also set the criteria and pose the challenge to the industry for innovative repair and strengthening methods for civil & structural assets in oil & gas environment, in line with safety, constructability and continuous modification and revamp of plant facilities to meet production demand.

Keywords: assets criticality, credible failure scenario, proactive and preventive maintenance, risk based inspection

Procedia PDF Downloads 357
1 Effect of 12 Weeks Pedometer-Based Workplace Program on Inflammation and Arterial Stiffness in Young Men with Cardiovascular Risks

Authors: Norsuhana Omar, Amilia Aminuddina Zaiton Zakaria, Raifana Rosa Mohamad Sattar, Kalaivani Chellappan, Mohd Alauddin Mohd Ali, Norizam Salamt, Zanariyah Asmawi, Norliza Saari, Aini Farzana Zulkefli, Nor Anita Megat Mohd. Nordin

Abstract:

Inflammation plays an important role in the pathogenesis of vascular dysfunction leading to arterial stiffness. Pulse wave velocity (PWV) and augmentation index (AS), as tools for the assessment of vascular damages are widely used and have been shown to predict cardiovascular disease (CVD). C-reactive protein (CRP) is a marker of inflammation. Several studies noted that regular exercise is associated with reduced arterial stiffness. The lack of exercise among Malaysians and the increasing CVD morbidity and mortality among young men are of concern. In Malaysia data on the workplace exercise intervention is scarce. A programme was designed to enable subjects to increase their level of walking as part of their daily work routine and self-monitored by using pedometers. The aim of this study to evaluate the reducing of inflammation by measuring CRP and improvement arterial stiffness measured by carotid femoral PWV (PWVCF) and AI. A total of 70 young men (20 - 40 years) who were sedentary, achieving less than 5,000 steps/day in casual walking with 2 or more cardiovascular risk factors were recruited in Institute of Vocational Skills for Youth (IKBN Hulu Langat). Subjects were randomly assigned to a control (CG) (n=34; no change in walking) and pedometer group (PG) (n=36; minimum target: 8,000 steps/day). The CRP was measured by using immunological method while PWVCF and AI were measured using Vicorder. All parameters were measured at baseline and after 12 weeks. Data for analysis was conducted using Statistical Package of Social Sciences Version 22 (SPSS Inc., Chicago, IL, USA). At post intervention, the CG step counts were similar (4983 ± 366vs 5697 ± 407steps/day). The PG increased step count from 4996 ± 805 to 10,128 ±511 steps/day (P<0.001). The PG showed significant improvement in anthropometric variables and lipid (time and group effect p<0.001). For vascular assessment, the PG showed significantly decreased for time and effect (p<0.001) for PWV (7.21± 0.83 to 6.42 ± 0.89) m/s; AI (11.88± 6.25 to 8.83 ± 3.7) % and CRP (pre= 2.28 ± 3.09, post=1.08± 1.37mg/L). However, no changes were seen in CG. As a conclusion, a pedometer-based walking programme may be an effective strategy for promoting increased daily physical activity which reduces cardiovascular risk markers and thus improve cardiovascular health in terms of inflammation and arterial stiffness. The community intervention for health maintenance has potential to adopt walking as an exercise and adopting vascular fitness index as the performance measuring tools.

Keywords: arterial stiffness, exercise, inflammation, pedometer

Procedia PDF Downloads 322