Search results for: Minoru Yatsu
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 3

Search results for: Minoru Yatsu

3 Effects of a Bacteria-Based Probiotic on Subpopulations of Peripheral Leukocytes and Their Interleukin mRNA Expression in Calves

Authors: Abdul Qadir Qadis, Satoru Goya, Minoru Yatsu, Yu-uki Yoshida, Toshihiro Ichijo, Shigeru Sato

Abstract:

Bacterial probiotics are known to modulate the gut-associated lymphoid and epithelial tissue response to enhance the activities of intestinal and systemic immune system in human and animals. In cattle, the immune-stimulatory effects of probiotics have been evaluated during intestinal disorders. To investigate the effects of probiotic on the function of peripheral blood mononuclear cells, eight healthy Holstein calves (10 ± 3 weeks) were assigned to a 4 × 2 experimental design. The probiotic, consisting of Lactobacillus plantarum, Enterococcus faecium and Clostridium butyricum, was administered orally at 3.0 g/100 kg body weight to calves once daily for 5 consecutive days. Calves given no probiotic served as the control. In the treatment group, increases in numbers of CD282+ monocytes, CD3+ T-cells and CD4+, CD8+ and WC1+ γδ T- cell subsets were noted on day 7 post-placement compared to pre-dose day and the control group. Expression of interleukin-6, interferon-gamma and tumor necrosis factor-alpha was elevated in peripheral leukocytes on days 7 and 14. These results suggest that peripheral blood leukocytes in healthy calves may be stimulated via the gastrointestinal microbiota, which was increased by the oral probiotic treatment. The 5-day repeated administration of a bacterial probiotic may enhance cellular immune function in weaned calves.

Keywords: bacterial-probiotic, calf, interleukin, leukocyte

Procedia PDF Downloads 630
2 Interaction between Unsteady Supersonic Jet and Vortex Rings

Authors: Kazumasa Kitazono, Hiroshi Fukuoka, Nao Kuniyoshi, Minoru Yaga, Eri Ueno, Naoaki Fukuda, Toshio Takiya

Abstract:

The unsteady supersonic jet formed by a shock tube with a small high-pressure chamber was used as a simple alternative model for pulsed laser ablation. Understanding the vortex ring formed by the shock wave is crucial in clarifying the behavior of unsteady supersonic jet discharged from an elliptical cell. Therefore, this study investigated the behavior of vortex rings and a jet. The experiment and numerical calculation were conducted using the schlieren method and by solving the axisymmetric two-dimensional compressible Navier–Stokes equations, respectively. In both, the calculation and the experiment, laser ablation is conducted for a certain duration, followed by discharge through the exit. Moreover, a parametric study was performed to demonstrate the effect of pressure ratio on the interaction among vortex rings and the supersonic jet. The interaction between the supersonic jet and the vortex rings increased the velocity of the supersonic jet up to the magnitude of the velocity at the center of the vortex rings. The interaction between the vortex rings increased the velocity at the center of the vortex ring.

Keywords: computational fluid dynamics, shock-wave, unsteady jet, vortex ring

Procedia PDF Downloads 442
1 Effects of the In-Situ Upgrading Project in Afghanistan: A Case Study on the Formally and Informally Developed Areas in Kabul

Authors: Maisam Rafiee, Chikashi Deguchi, Akio Odake, Minoru Matsui, Takanori Sata

Abstract:

Cities in Afghanistan have been rapidly urbanized; however, many parts of these cities have been developed with no detailed land use plan or infrastructure. In other words, they have been informally developed without any government leadership. The new government started the In-situ Upgrading Project in Kabul to upgrade roads, the water supply network system, and the surface water drainage system on the existing street layout in 2002, with the financial support of international agencies. This project is an appropriate emergency improvement for living life, but not an essential improvement of living conditions and infrastructure problems because the life expectancies of the improved facilities are as short as 10–15 years, and residents cannot obtain land tenure in the unplanned areas. The Land Readjustment System (LRS) conducted in Japan has good advantages that rearrange irregularly shaped land lots and develop the infrastructure effectively. This study investigates the effects of the In-situ Upgrading Project on private investment, land prices, and residents’ satisfaction with projects in Kart-e-Char, where properties are registered, and in Afshar-e-Silo Lot 1, where properties are unregistered. These projects are located 5 km and 7 km from the CBD area of Kabul, respectively. This study discusses whether LRS should be applied to the unplanned area based on the questionnaire and interview responses of experts experienced in the In-situ Upgrading Project who have knowledge of LRS. The analysis results reveal that, in Kart-e-Char, a lot of private investment has been made in the construction of medium-rise (five- to nine-story) buildings for commercial and residential purposes. Land values have also incrementally increased since the project, and residents are commonly satisfied with the road pavement, drainage systems, and water supplies, but dissatisfied with the poor delivery of electricity as well as the lack of public facilities (e.g., parks and sport facilities). In Afshar-e-Silo Lot 1, basic infrastructures like paved roads and surface water drainage systems have improved from the project. After the project, a few four- and five-story residential buildings were built with very low-level private investments, but significant increases in land prices were not evident. The residents are satisfied with the contribution ratio, drainage system, and small increase in land price, but there is still no drinking water supply system or tenure security; moreover, there are substandard paved roads and a lack of public facilities, such as parks, sport facilities, mosques, and schools. The results of the questionnaire and interviews with the four engineers highlight the problems that remain to be solved in the unplanned areas if LRS is applied—namely, land use differences, types and conditions of the infrastructure still to be installed by the project, and time spent for positive consensus building among the residents, given the project’s budget limitation.

Keywords: in-situ upgrading, Kabul city, land readjustment, land value, planned area, private investment, residents' satisfaction, unplanned area

Procedia PDF Downloads 157