Search results for: Maytal Perlman
3 Increasing Access to Upper Limb Reconstruction in Cervical Spinal Cord Injury
Authors: Michelle Jennett, Jana Dengler, Maytal Perlman
Abstract:
Background: Cervical spinal cord injury (SCI) is a devastating event that results in upper limb paralysis, loss of independence, and disability. People living with cervical SCI have identified improvement of upper limb function as a top priority. Nerve and tendon transfer surgery has successfully restored upper limb function in cervical SCI but is not universally used or available to all eligible individuals. This exploratory mixed-methods study used an implementation science approach to better understand these factors that influence access to upper limb reconstruction in the Canadian context and design an intervention to increase access to care. Methods: Data from the Canadian Institute for Health Information’s Discharge Abstracts Database (CIHI-DAD) and the National Ambulatory Care Reporting System (NACRS) were used to determine the annual rate of nerve transfer and tendon transfer surgeries performed in cervical SCI in Canada over the last 15 years. Semi-structured interviews informed by the consolidated framework for implementation research (CFIR) were used to explore Ontario healthcare provider knowledge and practices around upper limb reconstruction. An inductive, iterative constant comparative process involving descriptive and interpretive analyses was used to identify themes that emerged from the data. Results: Healthcare providers (n = 10 upper extremity surgeons, n = 10 SCI physiatrists, n = 12 physical and occupational therapists working with individuals with SCI) were interviewed about their knowledge and perceptions of upper limb reconstruction and their current practices and discussions around upper limb reconstruction. Data analysis is currently underway and will be presented. Regional variation in rates of upper limb reconstruction and trends over time are also currently being analyzed. Conclusions: Utilization of nerve and tendon transfer surgery to improve upper limb reconstruction in Canada remains low. There are a complex array of interrelated individual-, provider- and system-level barriers that prevent individuals with cervical SCI from accessing upper limb reconstruction. In order to offer equitable access to care, a multi-modal approach addressing current barriers is required.Keywords: cervical spinal cord injury, nerve and tendon transfer surgery, spinal cord injury, upper extremity reconstruction
Procedia PDF Downloads 962 The Lived Experience of People with a Mental Illness of Their Engagement in Therapeutic Recreation
Authors: Caroline Picton, Lorna Moxham, Christopher Patterson, Dana Perlman, Ellie Taylor, Renee Brighton
Abstract:
The purpose of this study was to extrapolate the meaning for people living with a mental illness of their participation in a therapeutic recreation experience. The study’s participants engaged in a five-day adventure camp, known as Recovery Camp, alongside undergraduate health care students. An interpretive phenomenological approach was used as an exploratory method to interview 25 participants (n=25). Van Kaam’s structured analytical framework guided the analysis of the transcribed narratives. The findings provide insight into using therapeutic recreation to enhance personal mental health recovery. Recovery Camp was viewed by participants as having a transformational effect on forming positive social connectedness and improving their self-identity. Participants perceived the Recovery Camp experience as one that gave them a sense of purpose and increased their motivation to undertake further activities. The insights gained of the benefits of therapeutic recreation for people living with a mental illness can be used to promote purposeful community engagement.Keywords: interpretive phenomenology, lived experience, mental illness, personal mental health recovery
Procedia PDF Downloads 4981 Rewilding the River: Assessing the Environmental Effects and Regulatory Influences of the Condit Dam Removal Process
Authors: Neda Safari, Jacob Petersen-Perlman
Abstract:
There are more than two million dams in the United States, and a considerable portion of them are either non-operational or approaching the end of their designed lifespan. However, this emerging trend is new, and the majority of dam sites have not undergone thorough research and assessments after their removal to determine the overall effectiveness of restoration initiatives, particularly in the case of large-scale dams that may significantly impact their surrounding areas. A crucial factor to consider is the lack of specific regulations pertaining to dam removal at the federal level. Consequently, other environmental regulations that were not originally designed with dam removal considerations are used to execute these projects. This can result in delays or challenges for dam removal initiatives. The process of removing dams is usually the most important first step to restore the ecological and biological health of the river, but often there is a lack of measurable indicators to assess if it has achieved its intended objectives. In addition, the majority of studies on dam removal are only short-term and focus on a particular measure of response. Therefore, it is essential to conduct extensive and continuous monitoring to analyze the river's response throughout every aspect. Our study is divided into two sections. The first section of my research will analyze the establishment and utilization of dam removal laws and regulations in the Condit Dam removal process. We will highlight the areas where the frameworks for policy and dam removal projects remain in need of improvement in order to facilitate successful dam removals in the future. In this part, We will review the policies and plans that affected the decision-making process to remove the Condit dam while also looking at how they impacted the physical changes to the river after the dam was removed. In the second section, we will look at the effects of the dam removal over a decade later and attempt to determine how the river's physical response has been impacted by this modification. Our study aims to investigate the Condit dam removal process and its impact on the ecological response of the river. We anticipate identifying areas for improvement in policies pertaining to dam removal projects and exploring ways to enhance them to ensure improved project outcomes in the future.Keywords: dam removal, ecolocgical change, water related regulation, water resources
Procedia PDF Downloads 45