Search results for: MIKE21
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5

Search results for: MIKE21

5 A Comparison between the Results of Hormuz Strait Wave Simulations Using WAVEWATCH-III and MIKE21-SW and Satellite Altimetry Observations

Authors: Fatemeh Sadat Sharifi

Abstract:

In the present study, the capabilities of WAVEWATCH-III and MIKE21-SW for predicting the characteristics of wind waves in Hormuz Strait are evaluated. The GFS wind data (Global Forecast System) were derived. The bathymetry of gride with 2 arc-minute resolution, also were extracted from the ETOPO1. WAVEWATCH-III findings illustrate more valid prediction of wave features comparing to the MIKE-21 SW in deep water. Apparently, in shallow area, the MIKE-21 provides more uniformities with altimetry measurements. This may be due to the merits of the unstructured grid which are used in MIKE-21, leading to better representations of the coastal area. The findings on the direction of waves generated by wind in the modeling area indicate that in some regions, despite the increase in wind speed, significant wave height stays nearly unchanged. This is fundamental because of swift changes in wind track over the Strait of Hormuz. After discussing wind-induced waves in the region, the impact of instability of the surface layer on wave growth has been considered. For this purpose, the average monthly mean air temperature has been used. The results in cold months, when the surface layer is unstable, indicates an acceptable increase in the accuracy of prediction of the indicator wave height.

Keywords: numerical modeling, WAVEWATCH-III, Strait of Hormuz, MIKE21-SW

Procedia PDF Downloads 176
4 Modeling of Bed Level Changes in Larak Island

Authors: Saeed Zeinali, Nasser Talebbeydokhti, Mehdi Saeidian, Shahrad Vosough

Abstract:

In this article, bathymetry changes have been studied as a case study for Larak Island, located in The South of Iran. The advanced 2D model of Mike21 has been used for this purpose. A simple procedure has been utilized in this model. First, the hydrodynamic (HD) module of Mike21 has been used to obtain the required output for sediment transport model (ST module). The ST module modeled the area for tidal currents only. Bed level changes are resulted by series of modeling for both HD and ST module in 3 months time step. The final bathymetry in each time step is used as the primary bathymetry for next time step. This consecutive procedure been continued until bathymetry for the year 2020 is obtained.

Keywords: bed level changes, Larak Island, hydrodynamic, sediment transport

Procedia PDF Downloads 233
3 2D-Numerical Modelling of Local Scour around a Circular Pier in Steady Current

Authors: Mohamed Rajab Peer Mohamed, Thiruvenkatasamy Kannabiran

Abstract:

In the present investigation, the scour around a circular pier subjected to a steady current were studied numerically using two-dimensional MIKE21 Flow Model (FM) and Sand Transport (ST)Modulewhich is developed by Danish Hydraulic Institute (DHI), Denmark. The unstructured flexible mesh generated with rectangular flume dimension of 10 m wide, 1 m deep, and 30 m long. The grain size of the sand was d50 = 0.16 mm, sediment size, sediment gradation=1.16, pier diameter D= 30 mm and depth-averaged current velocity, U = 0.449 m/s are considered in the model. The estimated scour depth obtained from this model is validated and it is observed that the results of the model have good agreement with flume experimental results.In order to estimate the scour depth, several simulations were made for three cases viz., Case I:change in sediment transport model description in the numerical model viz, i) Engelund-Hansen model, ii) Engelund-Fredsøe model, and iii) Van Rijn model, Case II: change in current velocity for keeping constant pile diameter D=0.03 m and Case III:change in pier diameter for constant depth averaged current speed U=0.449 m/s.In case I simulations, the results indicate that the scour depth S/D is the order of 1.73 for Engelund-Hansen model, 0.64 for Engelund-Fredsøe model and 0.46 for VanRijn model. The scour depth estimates using Engelund-Hansen method compares well the experimental results.In case II, simulations show that the scour depth increases with increasing current component of the flow.In case III simulations, the results indicate that the scour depth increases with increase in pier diameter and it stabilize attains steady value when the Froude number> 2.71.All the results of the numerical simulations are clearly matches with reported values of the experimental results. Hence, this MIKE21 FM –Sand Transport model can be used as a suitable tool to estimate the scour depth for field applications. Moreover, to provide suitable scour protection methods, the maximum scour depth is to be predicted, Engelund-Hansen method can be adopted to estimate the scour depth in the steady current region.

Keywords: circular pier, MIKE21, numerical model, scour, sediment transport

Procedia PDF Downloads 268
2 Numerical Modeling of Waves and Currents by Using a Hydro-Sedimentary Model

Authors: Mustapha Kamel Mihoubi, Hocine Dahmani

Abstract:

Over recent years much progress has been achieved in the fields of numerical modeling shoreline processes: waves, currents, waves and current. However, there are still some problems in the existing models to link the on the first, the hydrodynamics of waves and currents and secondly, the sediment transport processes and due to the variability in time, space and interaction and the simultaneous action of wave-current near the shore. This paper is the establishment of a numerical modeling to forecast the sediment transport from development scenarios of harbor structure. It is established on the basis of a numerical simulation of a water-sediment model via a 2D model using a set of codes calculation MIKE 21-DHI software. This is to examine the effect of the sediment transport drivers following the dominant incident wave in the direction to pass input harbor work under different variants planning studies to find the technical and economic limitations to the sediment transport and protection of the harbor structure optimum solution.

Keywords: swell, current, radiation, stress, mesh, mike21, sediment

Procedia PDF Downloads 430
1 Coastal Modelling Studies for Jumeirah First Beach Stabilization

Authors: Zongyan Yang, Gagan K. Jena, Sankar B. Karanam, Noora M. A. Hokal

Abstract:

Jumeirah First beach, a segment of coastline of length 1.5 km, is one of the popular public beaches in Dubai, UAE. The stability of the beach has been affected by several coastal developmental projects, including The World, Island 2 and La Mer. A comprehensive stabilization scheme comprising of two composite groynes (of lengths 90 m and 125m), modification to the northern breakwater of Jumeirah Fishing Harbour and beach re-nourishment was implemented by Dubai Municipality in 2012. However, the performance of the implemented stabilization scheme has been compromised by La Mer project (built in 2016), which modified the wave climate at the Jumeirah First beach. The objective of the coastal modelling studies is to establish design basis for further beach stabilization scheme(s). Comprehensive coastal modelling studies had been conducted to establish the nearshore wave climate, equilibrium beach orientations and stable beach plan forms. Based on the outcomes of the modeling studies, recommendation had been made to extend the composite groynes to stabilize the Jumeirah First beach. Wave transformation was performed following an interpolation approach with wave transformation matrixes derived from simulations of a possible range of wave conditions in the region. The Dubai coastal wave model is developed with MIKE21 SW. The offshore wave conditions were determined from PERGOS wave data at 4 offshore locations with consideration of the spatial variation. The lateral boundary conditions corresponding to the offshore conditions, at Dubai/Abu Dhabi and Dubai Sharjah borders, were derived with application of LitDrift 1D wave transformation module. The Dubai coastal wave model was calibrated with wave records at monitoring stations operated by Dubai Municipality. The wave transformation matrix approach was validated with nearshore wave measurement at a Dubai Municipality monitoring station in the vicinity of the Jumeirah First beach. One typical year wave time series was transformed to 7 locations in front of the beach to count for the variation of wave conditions which are affected by adjacent and offshore developments. Equilibrium beach orientations were estimated with application of LitDrift by finding the beach orientations with null annual littoral transport at the 7 selected locations. The littoral transport calculation results were compared with beach erosion/accretion quantities estimated from the beach monitoring program (twice a year including bathymetric and topographical surveys). An innovative integral method was developed to outline the stable beach plan forms from the estimated equilibrium beach orientations, with predetermined minimum beach width. The optimal lengths for the composite groyne extensions were recommended based on the stable beach plan forms.

Keywords: composite groyne, equilibrium beach orientation, stable beach plan form, wave transformation matrix

Procedia PDF Downloads 209