Search results for: Cangul Altundas Akcay
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6

Search results for: Cangul Altundas Akcay

6 Turkey’s Ideological and Identity Politics towards Iran in the Arab Uprising: The Case of Syrian Civil War

Authors: Cangul Altundas Akcay

Abstract:

With the beginning of the mass movement called as the Arab Uprising, Middle Eastern politics has demonstrated an influential shift which has been threatening the existence of the ruling regimes. In this environment, in particular, regional powers have desired to control regional politics, and to expand their regional influence. Bearing that in mind, Turkey and Iran, two significant regional powers, have engaged in competition so as to affect the shifted regional geopolitics. In this context, this paper aims to investigate how regional powers, especially non-Arab ones, have viewed each other in the Arab Uprising, whereby focusing on Turkish perspectives towards Iran. In other words, it will shed light on how Turkey has conducted foreign policy towards Iran during the Arab Uprising. To analyse this, Turkey’s ideological and identity politics towards Iran will be examined as one of its foreign policy approaches. The question is thus that how ideological and identity politics have determined Turkish foreign policy towards Iran in the Arab Uprising. To answer that, the Syrian civil war will be analysed as the case study in this qualitative study, hypothesising that Turkey, which has both Turkish identity and Sunni sect, has competed with Iran, which has both Farsi identity and Shia sect, over the Syrian civil war.

Keywords: Arab uprising, ideological and identity politics, Iran, Turkey, Syrian civil war

Procedia PDF Downloads 271
5 Numerical Simulation of Structural Behavior of NSM CFRP Strengthened RC Beams Using Finite Element Analysis

Authors: Faruk Ortes, Baris Sayin, Tarik Serhat Bozkurt, Cemil Akcay

Abstract:

The technique using near-surface mounted (NSM) carbon fiber-reinforced polymer (CFRP) composites has proved to be an reliable strengthening technique. However, the effects of different parameters for the use of NSM CFRP are not fully developed yet. This study focuses on the development of a numerical modeling that can predict the behavior of reinforced concrete (RC) beams strengthened with NSM FRP rods exposed to bending loading and the efficiency of various parameters such as CFRP rod size and filling material type are evaluated by using prepared models. For this purpose, three different models are developed and implemented in the ANSYS® software using Finite Element Analysis (FEA). The numerical results indicate that CFRP rod size and filling material type are significant factors in the behavior of the analyzed RC beams.

Keywords: numerical model, FEA, RC beam, NSM technique, CFRP rod, filling material

Procedia PDF Downloads 550
4 Implementation of Building Information Modeling in Turkish Government Sector Projects

Authors: Mohammad Lemar Zalmai, Mustafa Nabi Kocakaya, Cemil Akcay, Ekrem Manisali

Abstract:

In recent years, the Building Information Modeling (BIM) approach has been developed expeditiously. As people see the benefits of this approach, it has begun to be used widely in construction projects and some countries made it mandatory to get more benefits from it. To promote the implementation of BIM in construction projects, it will be helpful to get some relevant information from surveys and interviews. The purpose of this study is to research the current adoption and implementation of BIM in public projects in Turkey. This study specified the challenges of BIM implementation in Turkey and proposed some solutions to overcome them. In this context, the challenges for BIM implementation and the factors that affect the BIM usage are determined based on previous academic researches and expert opinions by conducting interviews and questionnaire surveys. Several methods are used to process information in order to obtain weights of different factors to make BIM widespread in Turkey. This study concluded interviews' and questionnaire surveys' outcomes and proposed some suggestions to promote the implementation of BIM in Turkey. We believe research findings will be a good reference for boosting BIM implementation in Turkey.

Keywords: building information modelling, BIM implementations, Turkish construction industry, Turkish government sector projects

Procedia PDF Downloads 106
3 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 188
2 Decision-Making Process Based on Game Theory in the Process of Urban Transformation

Authors: Cemil Akcay, Goksun Yerlikaya

Abstract:

Buildings are the living spaces of people with an active role in every aspect of life in today's world. While some structures have survived from the early ages, most of the buildings that completed their lifetime have not transported to the present day. Nowadays, buildings that do not meet the social, economic, and safety requirements of the age return to life with a transformation process. This transformation is called urban transformation. Urban transformation is the renewal of the areas with a risk of disaster and the technological infrastructure required by the structure. The transformation aims to prevent damage to earthquakes and other disasters by rebuilding buildings that have completed their non-earthquake-resistant economic life. It is essential to decide on other issues related to conversion and transformation in places where most of the building stock should transform into the first-degree earthquake belt, such as Istanbul. In urban transformation, property owners, local authority, and contractor must deal at a common point. Considering that hundreds of thousands of property owners are sometimes in the areas of transformation, it is evident how difficult it is to make the deal and decide. For the optimization of these decisions, the use of game theory is foreseeing. The main problem in this study is that the urban transformation is carried out in place, or the building or buildings are transport to a different location. There are many stakeholders in the Istanbul University Cerrahpaşa Medical Faculty Campus, which is planned to be carried out in the process of urban transformation, was tried to solve the game theory applications. An analysis of the decisions given on a real urban transformation project and the logical suitability of decisions taken without the use of game theory were also supervised using game theory. In each step of this study, many decision-makers are classifying according to a specific logical sequence, and in the game trees that emerged as a result of this classification, Nash balances were tried to observe, and optimum decisions were determined. All decisions taken for this project have been subjected to two significant differentiated comparisons using game theory, and as decisions are taken without the use of game theory, and according to the results, solutions for the decision phase of the urban transformation process introduced. The game theory model developed from beginning to the end of the urban transformation process, particularly as a solution to the difficulty of making rational decisions in large-scale projects with many participants in the decision-making process. The use of a decision-making mechanism can provide an optimum answer to the demands of the stakeholders. In today's world for the construction sector, it is also seeing that the game theory is a non-surprising consequence of the fact that it is the most critical issues of planning and making the right decision in future years.

Keywords: urban transformation, the game theory, decision making, multi-actor project

Procedia PDF Downloads 101
1 A Case Study on Problems Originated from Critical Path Method Application in a Governmental Construction Project

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

In public construction projects, determining the contract period in the award phase is one of the most important factors. The contract period establishes the baseline for creating the cash flow curve and progress payment planning in the post-award phase. If overestimated, project duration causes losses for both the owner and the contractor. Therefore, it is essential to base construction project duration on reliable forecasting. In Turkey, schedules are usually built using the bar chart (Gantt) schedule, especially for governmental construction agencies. The usage of these schedules is limited for bidding purposes. Although the bar-chart schedule is useful in some cases, it lacks logical connections between activities; it would be harder to obtain the activities that have more effects than others on the project's total duration, especially in large complex projects. In this study, a construction schedule is prepared with Critical Path Method (CPM) that addresses the above-mentioned discrepancies. CPM is a simple and effective method that displays project time and critical paths, showing results of forward and backward calculations with considering the logic relationships between activities; it is a powerful tool for planning and managing all kinds of construction projects and is a very convenient method for the construction industry. CPM provides a much more useful and precise approach than traditional bar-chart diagrams that form the basis of construction planning and control. CPM has two main application utilities in the construction field; the first one is obtaining project duration, which is called an as-planned schedule that includes as-planned activity durations with relationships between subsequent activities. Another utility is during the project execution; each activity is tracked, and their durations are recorded in order to obtain as-built schedule, which is named as a black box of the project. The latter is more useful for delay analysis, and conflict resolutions. These features of CPM have been popular around the world. However, it has not been yet extensively used in Turkey. In this study, a real construction project is investigated as a case study; CPM-based scheduling is used for establishing both of as-built and as-planned schedules. Problems that emerged during the construction phase are identified and categorized. Subsequently, solutions are suggested. Two scenarios were considered. In the first scenario, project progress was monitored based as CPM was used to track and manage progress; this was carried out based on real-time data. In the second scenario, project progress was supposedly tracked based on the assumption that the Gantt chart was used. The S-curves of the two scenarios are plotted and interpreted. Comparing the results, possible faults of the latter scenario are highlighted, and solutions are suggested. The importance of CPM implementation has been emphasized and it has been proposed to make it mandatory for preparation of construction schedule based on CPM for public construction projects contracts.

Keywords: as-built, case-study, critical path method, Turkish government sector projects