Search results for: Bhagwan Das

7 Towards the Use of Innovative Teaching Methodologies in Nursing Education : A South African Study

Authors: R. Bhagwan, M. Subbhan

Abstract:

Nursing is a very challenging field in South Africa and due to the burden of disease it is critical that nursing students are prepared with the adequate knowledge and skills to deliver effective patient care. Despite this very little research has been done on the teaching strategies used by nurse educators to teach nursing students. It is in this context that a survey of all nurse educators at Nursing Colleges and Universities in Kwa-Zulu Natal was undertaken (n=300) to explore what current pedagogical strategies were being used and which more creative methodologies should be implemented in relation to specific nursing content. Findings revealed that most nurse educators still utlize the lecture approach, but although believe other methodologies such as e-learning are important have not done so because of inadequate training. The recommendations made are that more creative pedagogical strategies such as simultation, portfoloios and case studies be adopted.

Keywords: creative, teaching methodologies, dydactic, nursing

Procedia PDF Downloads 568
6 Graphical User Interface for Presting Matlab Work for Reduction of Chromatic Disperion Using Digital Signal Processing for Optical Communication

Authors: Muhammad Faiz Liew Abdullah, Bhagwan Das, Nor Shahida, Abdul Fattah Chandio

Abstract:

This study presents the designed features of Graphical User Interface (GUI) for chromatic dispersion (CD) reduction using digital signal processing (DSP) techniques. GUI is specially designed for windows platform. The obtained simulation results from matlab are presented via this GUI. After importing results from matlab in GUI, It will present your work on any windows7 and onwards versions platforms without matlab software. First part of the GUI contains the research methodology block diagram and in the second part, output for each stage is shown in separate reserved area for the result display. Each stage of methodology has the captions to display the results. This GUI will be very helpful during presentations instead of making slides this GUI will present all your work easily in the absence of other software’s such as Matlab, Labview, MS PowerPoint. GUI is designed using C programming in MS Visio Studio.

Keywords: Matlab simulation results, C programming, MS VISIO studio, chromatic dispersion

Procedia PDF Downloads 426
5 The Quality of Life of Transtibial Amputees: The Prosthetists Role

Authors: Riyona Chetty, Raisuyah Bhagwan, Nalini Govender

Abstract:

Background: During rehabilitation, the prosthetist establishes prosthetic and/or orthotic realistic goals and programmes as well as clinical outcome measures. They are well-positioned to improve the amputee’s physical and psychosocial well-being. Objective: This study aims to explore the ways in which the prosthetist may be able to improve the holistic well-being of the amputee. Methods: Data was collected using a focus group discussion with 16 prosthetists at a medical facility in KwaZulu-Natal, South Africa. Results: The findings indicate that amputees are encouraged to consider physical activities to improve their health. However, a major challenge experienced by the prosthetists was their lack of adequate psychosocial expertise, which affected their ability to offer emotional support. Additional factors such as language barriers, rotational systems, and unrealistic expectations further obstructed optimal service delivery. Conclusion: The prosthetists are adequately skilled in manufacturing the ideal prosthesis and encouraging physical exercise to promote the amputee’s physical health. However, their lack of psychosocial training limits them in providing emotional support during rehabilitation. It is recommended that prosthetists are provided with professional training to provide emotional support as part of holistic healthcare. Clinical relevance: The intention of this study was to provide pertinent recommendations for prosthetists, enabling them to provide holistic quality care to their patients.

Keywords: psychological, social, well-being, amputee, prosthetist

Procedia PDF Downloads 14
4 The Biopsychosocial Effects of Amputation on Transtibial Amputees in Kwazulu-Natal

Authors: Riyona Chetty, Raisuyah Bhagwan, Nalini Govender

Abstract:

Background: A myriad of physical, psychosocial, and environmental sequelae are associated with limb loss. However, there is a paucity of empirical South African data, which focuses on these sequelae, how they interface with the amputee’s quality of life as well as the challenges they experience following amputation. Objective: This study sought to explore the biopsychosocial effects of amputation and how amputation affected the quality of life of transtibial amputees. Setting: Participants were recruited from a medical facility, under the KwaZulu-Natal Department of Health in South Africa. Methods: A qualitative approach guided this study. Data was collected using one-on-one interviews with 14 unilateral transtibial amputees. Data was analysed thematically. Results: Five broad themes emerged from the inquiry, which captured amputees’ experiences of phantom limb pain, body image disturbances, and their challenges related to adapting to daily activities. Participants also expressed the salience of familial support as well as the importance of psychological interventions to cope. Conclusion: The findings suggested that support networks and professional psychological intervention are imperative in facilitating successful adjustment to the amputation experience. Raising awareness of limb loss in both, rural and urban settings may help reduce the stigma attached to it. Contribution: Quality of life comprises several domains, namely physical, psychological, environmental, and social albeit limited local and international data exists regarding the environmental and social effects. This study brought to the fore the positive and negative effects of amputation in each domain, as well as various strategies that facilitate successful adjustment to amputation.

Keywords: amputation, quality of life, biopsychosocial, phantom limb pain, body image, support

Procedia PDF Downloads 19
3 Time to Second Line Treatment Initiation Among Drug-Resistant Tuberculosis Patients in Nepal

Authors: Shraddha Acharya, Sharad Kumar Sharma, Ratna Bhattarai, Bhagwan Maharjan, Deepak Dahal, Serpahine Kaminsa

Abstract:

Background: Drug-resistant (DR) tuberculosis (TB) continues to be a threat in Nepal, with an estimated 2800 new cases every year. The treatment of DR-TB with second line TB drugs is complex and takes longer time with comparatively lower treatment success rate than drug-susceptible TB. Delay in treatment initiation for DR-TB patients might further result in unfavorable treatment outcomes and increased transmission. This study thus aims to determine median time taken to initiate second-line treatment among Rifampicin Resistant (RR) diagnosed TB patients and to assess the proportion of treatment delays among various type of DR-TB cases. Method: A retrospective cohort study was done using national routine electronic data (DRTB and TB Laboratory Patient Tracking System-DHIS2) on drug resistant tuberculosis patients between January 2020 and December 2022. The time taken for treatment initiation was computed as– days from first diagnosis as RR TB through Xpert MTB/Rif test to enrollment on second-line treatment. The treatment delay (>7 days after diagnosis) was calculated. Results: Among total RR TB cases (N=954) diagnosed via Xpert nationwide, 61.4% were enrolled under shorter-treatment regimen (STR), 33.0% under longer treatment regimen (LTR), 5.1% for Pre-extensively drug resistant TB (Pre-XDR) and 0.4% for Extensively drug resistant TB (XDR) treatment. Among these cases, it was found that the median time from diagnosis to treatment initiation was 6 days (IQR:2-15.8). The median time was 5 days (IQR:2.0-13.3) among STR, 6 days (IQR:3.0-15.0) among LTR, 30 days (IQR:5.5-66.8) among Pre-XDR and 4 days (IQR:2.5-9.0) among XDR TB cases. The overall treatment delay (>7 days after diagnosis) was observed in 42.4% of the patients, among which, cases enrolled under Pre-XDR contributed substantially to treatment delay (72.0%), followed by LTR (43.6%), STR (39.1%) and XDR (33.3%). Conclusion: Timely diagnosis and prompt treatment initiation remain fundamental focus of the National TB program. The findings of the study, however suggest gaps in timeliness of treatment initiation for the drug-resistant TB patients, which could bring adverse treatment outcomes. Moreover, there is an alarming delay in second line treatment initiation for the Pre-XDR TB patients. Therefore, this study generates evidence to identify existing gaps in treatment initiation and highlights need for formulating specific policies and intervention in creating effective linkage between the RR TB diagnosis and enrollment on second line TB treatment with intensified efforts from health providers for follow-ups and expansion of more decentralized, adequate, and accessible diagnostic and treatment services for DR-TB, especially Pre-XDR TB cases, due to the observed long treatment delays.

Keywords: drug-resistant, tuberculosis, treatment initiation, Nepal, treatment delay

Procedia PDF Downloads 46
2 A Case Study of Low Head Hydropower Opportunities at Existing Infrastructure in South Africa

Authors: Ione Loots, Marco van Dijk, Jay Bhagwan

Abstract:

Historically, South Africa had various small-scale hydropower installations in remote areas that were not incorporated in the national electricity grid. Unfortunately, in the 1960s most of these plants were decommissioned when Eskom, the national power utility, rapidly expanded its grid and capability to produce cheap, reliable, coal-fired electricity. This situation persisted until 2008, when rolling power cuts started to affect all citizens. This, together with the rising monetary and environmental cost of coal-based power generation, has sparked new interest in small-scale hydropower development, especially in remote areas or at locations (like wastewater treatment works) that could not afford to be without electricity for long periods at a time. Even though South Africa does not have the same, large-scale, hydropower potential as some other African countries, significant potential for micro- and small-scale hydropower is hidden in various places. As an example, large quantities of raw and potable water are conveyed daily under either pressurized or gravity conditions over large distances and elevations. Due to the relative water scarcity in the country, South Africa also has more than 4900 registered dams of varying capacities. However, institutional capacity and skills have not been maintained in recent years and therefore the identification of hydropower potential, as well as the development of micro- and small-scale hydropower plants has not gained significant momentum. An assessment model and decision support system for low head hydropower development has been developed to assist designers and decision makers with first-order potential analysis. As a result, various potential sites were identified and many of these sites were situated at existing infrastructure like weirs, barrages or pipelines. One reason for the specific interest in existing infrastructure is the fact that capital expenditure could be minimized and another is the reduced negative environmental impact compared to greenfield sites. This paper will explore the case study of retrofitting an unconventional and innovative hydropower plant to the outlet of a wastewater treatment works in South Africa.

Keywords: low head hydropower, retrofitting, small-scale hydropower, wastewater treatment works

Procedia PDF Downloads 212
1 A Feasibility and Implementation Model of Small-Scale Hydropower Development for Rural Electrification in South Africa: Design Chart Development

Authors: Gideon J. Bonthuys, Marco van Dijk, Jay N. Bhagwan

Abstract:

Small scale hydropower used to play a very important role in the provision of energy to urban and rural areas of South Africa. The national electricity grid, however, expanded and offered cheap, coal generated electricity and a large number of hydropower systems were decommissioned. Unfortunately, large numbers of households and communities will not be connected to the national electricity grid for the foreseeable future due to high cost of transmission and distribution systems to remote communities due to the relatively low electricity demand within rural communities and the allocation of current expenditure on upgrading and constructing of new coal fired power stations. This necessitates the development of feasible alternative power generation technologies. A feasibility and implementation model was developed to assist in designing and financially evaluating small-scale hydropower (SSHP) plants. Several sites were identified using the model. The SSHP plants were designed for the selected sites and the designs for the different selected sites were priced using pricing models (civil, mechanical and electrical aspects). Following feasibility studies done on the designed and priced SSHP plants, a feasibility analysis was done and a design chart developed for future similar potential SSHP plant projects. The methodology followed in conducting the feasibility analysis for other potential sites consisted of developing cost and income/saving formulae, developing net present value (NPV) formulae, Capital Cost Comparison Ratio (CCCR) and levelised cost formulae for SSHP projects for the different types of plant installations. It included setting up a model for the development of a design chart for a SSHP, calculating the NPV, CCCR and levelised cost for the different scenarios within the model by varying different parameters within the developed formulae, setting up the design chart for the different scenarios within the model and analyzing and interpreting results. From the interpretation of the develop design charts for feasible SSHP in can be seen that turbine and distribution line cost are the major influences on the cost and feasibility of SSHP. High head, short transmission line and islanded mini-grid SSHP installations are the most feasible and that the levelised cost of SSHP is high for low power generation sites. The main conclusion from the study is that the levelised cost of SSHP projects indicate that the cost of SSHP for low energy generation is high compared to the levelised cost of grid connected electricity supply; however, the remoteness of SSHP for rural electrification and the cost of infrastructure to connect remote rural communities to the local or national electricity grid provides a low CCCR and renders SSHP for rural electrification feasible on this basis.

Keywords: cost, feasibility, rural electrification, small-scale hydropower

Procedia PDF Downloads 193