Search results for: Azola Mayeza
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2

Search results for: Azola Mayeza

2 The Impact of High Labour Turnover on Sustainable Housing Delivery in South Africa

Authors: Azola Agrienette Mayeza, Madifedile Thasi

Abstract:

Due to the contractual nature of jobs and employment opportunities in the construction industry and the seeming surplus of potential employees in South Africa, there is a little interest on the part of employers to put in place policies to retain experienced workers. Ironically these are the workers that the companies have expended significant resources on, in terms of training and capabilities development. The construction industry has been experiencing high materials wastages and health and safety issues to score very low on the sustainability agenda as regards resources management and safety. This study carried out an assessment of the poor retention of experienced workers in the construction industry on the capacity to deliver sustainable housing in South Africa. It highlights the economic, safety and resources conservation and other benefits accruable from a high retention of key employees to the South African construction industry towards the delivery of sustainable housing. It presents data that strongly support the hypothesis that high turnover of skilled employees as a result of the industry belief of zero incentive to retain employees beyond the contractual period, is responsible for the high wastages of resources in the industry and the safety issues. A high turnover of experienced employees in the construction industry was found to impact on the industry performance in terms of timely, cost effective and quality delivery of construction projects, particularly when measured against the government sustainable housing agenda. It also results in unplanned expenses required to train replacing employees during project executions as well as company goodwill which ultimately has a huge impact on sustainable housing delivery in South Africa.

Keywords: labour turnover, construction industry, sustainable housing, materials wastage, housing delivery, South Africa

Procedia PDF Downloads 334
1 Prefabrication Technology as an Option for Accelerated Sustainable Social Housing Delivery in South Africa

Authors: Madifedile Thasi, Azola Mayeza

Abstract:

In South Africa, provision of housing to the growing population has been described as one of the greatest challenges facing the government. Between 1994 to 2015, more than 2.5 million housing units were provided by the government for the poorest households and the low-income earners under the Reconstruction and Development Programme (RDP). Yet, the latest census figure revealed that about 2.1 million households still live in shacks and informal dwellings. Human settlements patterns remain dysfunctional across in South Africa because of rapid urbanisation. The housing backlog is growing at a rate of 178 000 units a year. The aforementioned predicament calls the need for innovative approaches to address the issue in a sustainable way and this need not be overemphasized. Aside from the issue of cost, the delivery of more housing units comes with environmental and sustainability issues. The prefabrication building technology has resulted into accelerated housing delivery to a satisfactory level in some countries such as Nigeria and Malaysia that are facing similar issue. It is therefore expected to be a foremost option to address the social housing backlog in South Africa and within the country housing sustainability agenda. This paper appraises the factors responsible for the limited implementation of prefabrication technology in South African housing projects. The objective is to recommend the method and materials that can be best sustained in the country in terms of local availability, cost effectiveness and environmental friendliness. It presents empirical data to support the hypothesis that a wider implementation of prefabrication technology in the social housing projects will be of significant benefit, by providing fast turnaround, cost-effective and sustainable solution that will dent the housing backlog, as well as improving the quality of the social housings. It was found that only 17 000 units of the RDP housings provided were constructed using alternative building technologies. Furthermore, there are variety of prefabricated technologies in the market but mostly have limited production capacity, minimal manufacturing capacity and most materials are imported, which leads to unavailability of the technology for large scale delivery and utilization despite its obvious advantages.

Keywords: prefabrication technology, sustainable social housings, South Africa, housing delivery

Procedia PDF Downloads 169